Tillamook Forest Center Boiler Systems Addendum 1 ITB 4246.doc
DOC document 45 KB Posted
- Attached to
- TFC BOILER SYSTEM REPLACEMENT
- Solicitation number
- S-62900-00004264
- Issued by
- Tillamook County, Oregon
About this file
This document is Solicitation Addendum #1 for ITB #4264 Boiler Systems Replacement at the Oregon Department of Forestry (ODF) Tillamook Forest Center. It modifies the original bid documents, including changes to the specifications and electrical drawings. Key changes include revising the motor starter and drive specifications, updating electrical equipment connection schedules, and replacing several mechanical drawings. This addendum is a material change to the original solicitation and must be signed and returned by bidders prior to the bid closing date and time.
The related state and local contract opportunity involves the replacement of the boiler systems at the ODF Tillamook Forest Center, located in jurisdictions including Marion County and the City of Salem, Oregon. The solicitation is being conducted by the State of Oregon.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB #4264
Boiler Systems Replacement – ODF Tillamook Forest Center Solicitation Addendum #1
This Solicitation Addendum #1 modifies the Bid Document(s) only to the extent indicated herein. All other areas not specifically mentioned or affected by this Solicitation Addendum #1 shall remain in full force and effect. This Solicitation Addendum #1 shall be added as a part of the original Solicitation Document, ITB #4264.
This Solicitation Addendum #1 must be acknowledged by inserting its number on the appropriate blank lines in Section H of the Invitation to Bid and by providing all required signatures prior to Bid Closing. Failure to do so may result in rejection of Bid.
A. Refer to Attachment A, SPECIFICATIONS
1. Delete Section 20 52 00, VARIABLE SPEED DRIVES, in its entirety and replace with the four page Section 20 52 00, MOTOR STARTERS AND DRIVES, attached to this Addendum No. 1.
B. Refer to Attachment B, DRAWINGS
1. Reference Drawing E-401: Revise electrical equipment connection schedules as follows:
a. Change Voltage of Heating water boilers to 208 volt 1 phase. Change note 2 reference to “Bypass existing buck boost transformer serving existing 240 volt a.”
b. Change note reference to pumps P-2 and P-3 to “Connect to reduced voltage starters provided by Division 23.”
c. Change voltage of pump P-4 to 208 volt 3 phase.
2. Delete the following five sheets in their entirety and replace with the sheets attached to this Addendum #1:
a. M-001;
b. M-401;
c. M-501;
d. M-601; and
e. M-701
This Solicitation Addendum #1 constitutes a MATERIAL CHANGE to ITB #4264. IT MUST BE SIGNED AND RETURNED PRIOR TO THE BID CLOSING DATE AND TIME. ITS RECEIPT MUST ALSO BE ACKNOWLEDGED BY INSERTING ITS NUMBER ON THE APPROPRIATE BLANK LINES IN SECTION H OF THE BID DOCUMENT.
Signature: _____________________________________ Date: ____________________
Bidder Name: ____________________________________________________________
(Please Print) ITB # 4264 Addendum #1
File details come from the government source that posted it. Updated .