22-054 M-401 to Addendum 3.pdf
PDF 445 KB Posted
- Attached to
- TFC BOILER SYSTEM REPLACEMENT
- Solicitation number
- S-62900-00004264
- Issued by
- Tillamook County, Oregon
About this file
This document appears to be an addendum to a set of construction documents for the TFC Boiler System Replacement project located in Tillamook, Oregon. The project involves the replacement of mechanical equipment, including a chilled water buffer tank, boiler vents, pumps, heat exchangers, and related piping and controls, for facilities under the jurisdiction of Marion County and the City of Salem. The document provides detailed plans, specifications, and general notes for the proposed work. It does not include information about the overall project timeline, bid due dates, award dates, or contract term.
The document does not provide details on pricing, set-asides, incumbents, funding sources, or other commercial terms. It appears to focus solely on the technical aspects of the proposed mechanical system upgrades. Additional procurement-related information would be needed to fully summarize the key details of the state and local contract opportunity.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL
(E) CHILLED WATER
BUFFER TANK
P-7
(R) B-3
(R) P-4
(E) 8Ø
(TYP.4)
CH-1
(R) B-1
(R) P-2
(R) B-2
(R) P-3
/1
(E) EA LOUVER
(E) EA LOUVER
(E) SUMP PUMP
DUPLEXING PANEL
P-1
70/16
GT-1
ET-2
PFHX-1
22/824/8
P-5P-6
UH-1
ET-1
(E) DDC CONTROL PANEL
(E) VFD
8Ø
BP-1
/6
24/48
BELOW48/20
EA
EA
2-1/2"
(E) HWS
(E) HWS
2-1/2"
(E ) C
H W
S (E
) C H
W R
2-1/2"
3"
(E) CDR
(E) CDS
(E) HS
2-1/2"
(E) HR
3"(E) CDR
SP-1
OCT-1
WM-1
(R) PELLET
AUGER
(R) PELLET FEED
CONTROLLER
4 44
(R) PIPING DROP
(TYP.6)
(E) CHEMICAL FEEDER
(E) AIR SEPARATOR
MECHANICAL
6" BOILER VENT
RISER TO REMAIN
(TYP. 3)
(R) 6" BOILER VENT
WITHIN MECHANICAL
ROOM (TYP. 3)
D
11 12
KEYED SHEET NOTES
PROVIDE TANK TEMPERATURE SENSORS AND PROVIDE
POINTS/WIRING/GRAPHICS AT (E) BMS TO MONITOR UPPER AND
LOWER TEMPERATURES IN HEATING WATER STORAGE TANK
FOR ENABLING BOILERS. INCLUDE SOFTWARE SEQUENCING
TO SEQUENCE/STAGE BOILERS PER BOILER MANUFACTURER'S
RECOMMENDATIONS.
TYPICAL (E) EQUIPMENT CLEARANCE. NOT ALL ARE SHOWN,
FOR CLARITY.
EXTEND AND CONNECT (E) INDIVIDUAL HOUSEKEEPING PADS TO
CREATE SINGLE PAD EXTENDING MINIMUM 6" OUTSIDE
EQUIPMENT FOOTPRINT.
PROVIDE SHIELDING MATERIAL WHERE SHOWN PER BOILER
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
VERIFY SIZE AND ALLOWABLE EQUIVALENT LENGTH PER
BOILER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
FOR ROUTING AND LOCATION SEE ALSO
BOILER CIRCULATION PUMP LOCATION NOT SHOWN IN PLAN,
FOR CLARITY. PUMP IS LOCATED ABOVE BOILER. REMOVE
EXISTING PUMP AND ASSOCIATED PIPING TO THE EXTENT
REQUIRED TO PROVIDE NEW PUMP AND PIPING.
(R) GASKETED PLATE HEAT EXCHANGER AND (R) CONNECTED
PIPING TO THE EXTENT NEEDED TO INSTALL NEW PFHX-1.
EXPANDED FOOTPRINT OF HEAT EXCHANGER. EXPAND
CONCRETE HOUSEKEEPING PAD TO SERVE EXPANDED HEAT
EXCHANGER AND RE-ROUTE AND CONNECT HEATING WATER
PIPING TO EXPANDED HEAT EXCHANGER.
SALVAGE RISER ELBOWS AND TEES FOR RE-INSTALLATION.
GENERAL SHEET NOTES
1. LOCATIONS AND SIZES OF (E) EQUIPMENT AND ROUTING AND
SIZES OF (E) DUCTWORK ARE PARTIALLY VERIFIED. SOME SIZES
AND ROUTING ARE INFERRED FROM LIMITED INFORMATION AND
SOME ROUTING IS NOT SHOWN, FOR CLARITY. CONTRACTOR
SHALL VERIFY EXISTING SIZES AND ROUTING AND INDICATE ON
RECORD DRAWINGS.
2. FLOOR PLAN IS SHOWN FOR REFERENCE ONLY AND SCALING IS
APPROXIMATE. VERIFY ARCHITECTURAL DIMENSIONS IN FIELD.
3. PROVIDE TEMPORARY SUPPORT STRUCTURE FOR EQUIPMENT,
DUCTS, AND PIPING DURING EXECUTION OF THE WORK.
4. MAINTAIN SPACE TEMPERATURE AND VENTILATION RATES
DURING NORMAL OCCUPANCY PERIODS. PROVIDE TEMPORARY
AIR HANDLING EQUIPMENT WHEN AIR HANDLING UNIT IS NOT
OPERABLE DURING NORMAL OCCUPANCY PERIODS.
5. MAINTAIN (E) MECHANICAL MAINTENANCE CLEARANCES AND
ELECTRICAL CLEARANCES AT (E) EQUIPMENT PER CODE AND
PER (E) EQUIPMENT O&M DATA / INSTRUCTIONS.
M-5016
MECHANICAL
(E) CHILLED WATER
BUFFER TANK
P-7
(E) 8Ø
(TYP.4)
CH-1
/1
(E) EA LOUVER
(E) EA LOUVER
(E) SUMP PUMP
DUPLEXING PANEL
P-1
70/16
GT-1
ET-2
PFHX-1
22/824/8
(E) 6"Ø BOILER VENT UP
UH-1
(E) DDC CONTROL PANEL
(E) VFD
8Ø
BP-1
/6
24/48
BELOW48/20
EA
EA
2-1/2"
2-1/2"
(E ) C
H W
S (E
) C H
W R
2-1/2"
3"
(E) CDR
(E) CDS
2-1/2"
3"(E) CDR
SP-1
OCT-1
WM-1
(N) VACUUM PELLET
FEED TUBE (TYP.4)
4 2
B-2 P-3
B-1 P-2
ST-11
(N) HOUSEKEEPING
PAD 3
(E) 6"Ø BOILER VENT
M-501
(TYPICAL FOR
HS/HR PIPING)
(E) FD
ET-1
2-1/2"
(E) CHEMICAL FEEDER
(E) AIR SEPARATOR
P-4
3" 3"
3"
2-1/2"
VFDs
ET-3
(TYP. 2)
D
11 12
DRAFT DATE:
PROJECT NO:
ISSUE DATE:
REVISED:
CHECKED BY:
REVISION NO:
DRAWN BY:
ã
OR
EG
ON
D
EP
AR
TM
EN
T
OF
F
OR
ES
TR
Y
TF
C
BO
IL
ER
R
EP
LA
CE
ME
NT
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
S
ET
TI
LL
AM
OO
K, O
R
0 W
IL
SO
N
RI
VE
R
HW
Y
22-054 08-08-2022
REVISED:
REVISION NO:
GSB
MJH
DRAWING NO.
DRAWING TITLE:
REVISED:
REVISION NO:
M-401
MECHANICAL
ENLARGED
PLANS
PROJECT NORTH
TRUE NORTH
SCALE: 1/4" = 1'0"
NEW WORK7
BASEMENT FLOOR
MECHANICAL EQUIPMENT PLAN
11-02-2022
SCALE: 1/4" = 1'0"
DEMOLITION5
BASEMENT FLOOR
MECHANICAL EQUIPMENT PLAN
PROJECT NORTH
TRUE NORTH
11-03-2022
1ADD. 1
2 2
11-18-2022
2ADD. 3
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text Copyright 2022
AutoCAD SHX Text
EXPIRES 12/31/2023
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text J
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
OREGON
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 1915 NE Stucki Ave, Suite 400, Beaverton, OR 97006 - Telephone: 541.349.0966
AutoCAD SHX Text 1501 E Madison Street, Suite 200, Seattle,WA 98122 - Telephone: 206.812.8690
AutoCAD SHX Text 211 East 300 South, Suite 208, Salt Lake City, UT 84111 - Telephone: 801.990.7016
AutoCAD SHX Text Corporate Office: 30 E. Broadway, Suite 150, Eugene, OR 97401 - Telephone: 541.349.0966
| Sheets and Views |
| TAB 1 |
File details come from the government source that posted it. Updated .