22-054 TFC M-701 Mechanical Diagrams-M-701.pdf
PDF 370 KB Posted
- Attached to
- TFC BOILER SYSTEM REPLACEMENT
- Solicitation number
- S-62900-00004264
- Issued by
- Tillamook County, Oregon
About this file
The document provided is a set of mechanical diagrams related to the TFC Boiler System Replacement project located in Tillamook, Oregon. This project is being conducted by the Oregon Department of Forestry and involves the replacement of the existing boiler system. The drawings detail the demolition and new work required for the heating system, including the modification of the existing heat exchanger, piping adjustments, and the installation of various valves and temperature sensors. The project is being executed across multiple jurisdictions, including Marion County and the city of Salem.
The document does not include any specific details on pricing, set-asides, incumbents, funding sources, or other salient information. The focus is solely on the technical specifications and drawings related to the mechanical system upgrades for this state and local contract opportunity.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-701
SCALE: NONE
NC
P-4
B-3
B-2
B-1
P-3
P-2
P-6
P-5 AS-2
PFHX-1
ET-1
ET-3
HEATING COILS
TY
PE
NC
CNO
HWR
HWS
M-701
SCALE: NONE
NC
TY
PE
P-6
P-5 AS-2
PFHX-1
AHU-1
FC-1
ET-1
ET-3
B-1
B-2
ST-1
TEMPERATURE
SENSOR
(TYP. 2)
WIRING TO BAS
(TYP. 2)
MODIFY (E) HEAT
EXCHANGER BY
ADDING PLATES
ADJUST PIPING AND
RECONNECT TO
MODIFIED HEAT
EXCHANGER
AV
PP
1/2" CW
D
DISCHARGE LINE
TO AIR GAP AT
(E) FLOOR DRAIN
INDIRECT DRAIN SAME SIZE AS
PRESSURE RELIEF VALVE
DISCHARGE CONNECTION
AIR SEPARATOR
M-501
P-2
P-3
P-4
M
2"
1/2"
2"
3/4"
2"
2"
2"
2-1/2" 2"
2"
P-4 2-1/2"
2" 2"
2- 1/2
2-1/2"
1-1/4" 2"
3/4"
1/2"
1-1/4"2"
2"
2"
2"
2-1/2"
2"
2-1/2"
2-1/2"
2-1/2"
2- 1/2
2-1/2"
2-1/2"
2-1/2" 2-1/2"2-1/2"
1-1/4" 1-1/4"
3/4
2-1/2"
DRAFT DATE:
PROJECT NO:
ISSUE DATE:
REVISED:
CHECKED BY:
REVISION NO:
DRAWN BY:
ã
OR
EG
ON
D
EP
AR
TM
EN
T
OF
F
OR
ES
TR
Y
TF
C
BO
IL
ER
R
EP
LA
CE
ME
NT
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
S
ET
TI
LL
AM
OO
K, O
R
0 W
IL
SO
N
RI
VE
R
HW
Y
22-054 08-08-2022
REVISED:
REVISION NO:
GSB
MJH
DRAWING NO.
DRAWING TITLE:
M-701
MECHANICAL
DIAGRAMS
10-26-2022
11-03-2022
1ADD. 1
11-10-2022
2ADD. 2
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text N.O.
AutoCAD SHX Text
HEATING SYSTEM DIAGRAM - DEMOLITION
AutoCAD SHX Text
CHEMICAL
AutoCAD SHX Text
SHOT-FEEDER
AutoCAD SHX Text
RELIEF VALVE SET AT
AutoCAD SHX Text
30 PSI (TYP. 3)
AutoCAD SHX Text
PIPE OVERHEAT COOLING COIL AND
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
RELIEF VALVE TO NEAREST FLOOR
AutoCAD SHX Text
DRAIN (TYP. 3)
AutoCAD SHX Text
DRAFT
AutoCAD SHX Text
STABILIZER.
AutoCAD SHX Text
(TYP. 3)
AutoCAD SHX Text
TANK
AutoCAD SHX Text
RWS
AutoCAD SHX Text (R)
AutoCAD SHX Text
BACK
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
AND FRAME
AutoCAD SHX Text
SHOT-FEEDER
AutoCAD SHX Text
(R) CHEMICAL
AutoCAD SHX Text
(R) OPEN EXPANSION TANK
AutoCAD SHX Text
TO OVERHEAT
AutoCAD SHX Text
COOLING COIL
AutoCAD SHX Text
(TYP. 3)
AutoCAD SHX Text 1"
AutoCAD SHX Text
THERMOVAR TEMPERING
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
THERMOVAR TEMPERING
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
IN-LINE AIR PURGER
AutoCAD SHX Text
RWS
AutoCAD SHX Text
RWS
AutoCAD SHX Text
VENT LINE TO
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
LEAVE CLOSED UNLESS FILLING BOILER LOOP
AutoCAD SHX Text (R)
AutoCAD SHX Text (R)
AutoCAD SHX Text
BURN
AutoCAD SHX Text (R)
AutoCAD SHX Text (R)
AutoCAD SHX Text (R)
AutoCAD SHX Text (R)
AutoCAD SHX Text
TANK
AutoCAD SHX Text (R)
AutoCAD SHX Text
BACK
AutoCAD SHX Text
BURN
AutoCAD SHX Text
TANK
AutoCAD SHX Text (R)
AutoCAD SHX Text
BACK
AutoCAD SHX Text
BURN
AutoCAD SHX Text
THERMOVAR TEMPERING
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
TO (E) %%UGT-1
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
MAV
AutoCAD SHX Text
DV
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text N.O.
AutoCAD SHX Text
HEATING SYSTEM DIAGRAM - NEW WORK
AutoCAD SHX Text
CHEMICAL
AutoCAD SHX Text
SHOT-FEEDER
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
TO VAV BOXES
AutoCAD SHX Text
(TYPICAL)
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
AND FRAME
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
DV
AutoCAD SHX Text
MAV
AutoCAD SHX Text
LEAVE CLOSED UNLESS FILLING BOILER LOOP
AutoCAD SHX Text
(E) CHEMICAL FEEDER
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
THERMOVAR TEMPERING
AutoCAD SHX Text N.O.
AutoCAD SHX Text
(E)RWS
AutoCAD SHX Text
TO (E) %%UGT-1
AutoCAD SHX Text
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text Copyright 2022
AutoCAD SHX Text
EXPIRES 12/31/2023
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text J
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
OREGON
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 1915 NE Stucki Ave, Suite 400, Beaverton, OR 97006 - Telephone: 541.349.0966
AutoCAD SHX Text 1501 E Madison Street, Suite 200, Seattle,WA 98122 - Telephone: 206.812.8690
AutoCAD SHX Text 211 East 300 South, Suite 208, Salt Lake City, UT 84111 - Telephone: 801.990.7016
AutoCAD SHX Text Corporate Office: 30 E. Broadway, Suite 150, Eugene, OR 97401 - Telephone: 541.349.0966
| Sheets and Views |
| TAB 1 |
File details come from the government source that posted it. Updated .