22-054 TFC M-501 Mechanical Details-M-501.pdf

PDF 301 KB Posted

Attached to
TFC BOILER SYSTEM REPLACEMENT
Solicitation number
S-62900-00004264
Issued by
Tillamook County, Oregon

About this file

This document is a set of mechanical details for the TFC Boiler System Replacement project in Tillamook, Oregon. The project is being managed by the Oregon Department of Forestry and involves the replacement of boiler equipment and associated piping and support infrastructure at the TFC facility located at 45500 Wilson River Hwy, Tillamook, OR 97141. The document includes details on pipe supports, pumps, expansion tanks, and other mechanical components required for the boiler system replacement. It also provides notes on applicable specifications, equipment arrangement, piping materials, and support requirements.

The TFC Boiler System Replacement project is a state and local contract opportunity involving Marion County and the City of Salem, Oregon. The project requires the provision and installation of new boiler equipment, piping, and related mechanical systems. Funding requirements and sources are not provided in this technical document. No information is given regarding set-asides, incumbents, or the current contracting environment.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPORT NUT

BOLT AND NUT

SHEET STEEL SADDLE

16 GAUGE ZINC COATED

AT LEAST 12" LONG X

180° BEND

ATTACH TO STRUCTURE

HANGER: GRINNELL

FIGURE 260

VAPOR BARRIER

INSULATION

1/2" HANGER ROD

HEAVY-DUTY CLEVIS

LOCKING NUT

SEISMIC BRACING WHERE REQ. PER

SPECIFICATIONS

12" LONG x 120° BEND RIGID

INSULATION OF SAME

THICKNESS AS PIPE

INSULATION, OR FULL RIGID

INSULATION 12" LONG

BOILER

CIRCULATION

PUMP, SEE

SET BOILER LEVEL

ON CONCRETE

HOUSEKEEPING PAD

FRONT

(E) APPLIANCE VENT

(TYP.)

HW

R

BACK

HW

S

FULL SIZE

DISCHARGE FROM

P/T RELIEVE VALVE

M-501

B-2

1ST FLOOR DECK

(E) ROOF CURB

VENT THIMBLE

AND RAINSHIELD

RAIN CAP

W

(E) FLOOR SINK

1" AIR GAP

(MIN.)

FLOOR

FLOW

FLOW

SPRING-CHECK VALVE (SWING

CHECK IF HORIZONTAL)

PUMP

P/T PORT, TYP. EA. SIDE OF

PUMP

FLOW BALANCING VALVE

ISOLATION VALVE (BALL TYPE,

TYP. EA. SIDE OF PUMP)

STRAINER

BLOWDOWN VALVE

WITH HOSE

CONNECTOR AND CAP

NOTES:

(1)

(2)

(3)

(4)

REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS RELATING TO EQUIPMENT ARRANGEMENT, PIPING MATERIALS, FITTINGS, HYDRONIC SPECIALTY COMPONENTS, AND PIPE SUPPORTS.

FOLLOW PUMP MFR. INSTALLATION REQUIREMENTS FOR ALLOWABLE MOTOR ORIENTATION.

WHEN ALLOWED BY MFR. INSTALLATION INSTRUCTIONS, PUMP SHALL BE SUPPORTED BY PIPING. PROVIDE SUPPORT

CONNECTIONS AS INDICATED IN SPECIFICATIONS.

TRIPLE DUTY VALVE CAN BE USED, WHERE INDICATED, IN LIEU OF SEPARATE CHECK, BALANCING, AND ISOLATION VALVES.

REDUCER, AS REQ'D

FOR PUMP AND

PIPING TRANSITION

(TYP. OF 2)

(E) CHASE

(E) GRADE

22'-0"

APPROX.

(VERIFY)

(E) TFC ROOF

(E) EXTERIOR

WALL

(E) GRADE

PNEUMATIC

PELLET FUEL LINES

TO B-1

PNEUMATIC

PELLET FUEL

LINES

(E) PELLET FUEL

SILO

PELLET FUELLING

PNEUMATIC FEEDER

PROVIDED HEREIN

(E) BASEMENT WALL

M-501

(TYP.)

(TYPICAL OF 2)

P-3

3/4" CONNECTION TO

HEATING WATER LOOP.

SEISMIC SUPPORT

PER CONTRACTOR

DESIGN

1/2" X 3" ANCHOR

BOLT, EPOXY OR

INSERT, MIN. 4

SCHRAEDER CHARGING

VALVE, ADJUST FACTORY

PRESSURE IF NEEDED TO

COORDINATE WITH FILL

VALVESETTING.

M-502

(E) APPLIANCE VENT

(E) GRADE BEYOND

CLEANOUT

(TYP.2)

6" APPLIANCE VENT

TO B-1

(E ) 6

"Ø

(E ) 6

"Ø

(E ) 6

"Ø

(N) 7"Ø

SECONDARY

CONTAINMENT (TYP.)

DRAFT DATE:

PROJECT NO:

ISSUE DATE:

REVISED:

CHECKED BY:

REVISION NO:

DRAWN BY:

ã

OR

EG

ON

D

EP

AR

TM

EN

T

OF

F

OR

ES

TR

Y

TF

C

BO

IL

ER

R

EP

LA

CE

ME

NT

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

S

ET

TI

LL

AM

OO

K, O

R

0 W

IL

SO

N

RI

VE

R

HW

Y

22-054 08-08-2022

REVISED:

REVISION NO:

GSB

MJH

DRAWING NO.

DRAWING TITLE:

M-501

MECHANICAL

DETAILS

11-03-2022

SCALE: NTS

DETAIL - BOILER INSTALLATION11

SCALE: NTS

DETAIL - INLINE PUMP5

SCALE: NTS

DETAIL - PIPING SUPPORT1

SCALE: NTS

DETAIL - EXPANSION TANK9

11-03-2022

1ADD. 1

11-10-2022

2ADD. 2

AutoCAD SHX Text

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text Copyright 2022

AutoCAD SHX Text

EXPIRES 12/31/2023

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Y

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text J

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

OREGON

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text 1915 NE Stucki Ave, Suite 400, Beaverton, OR 97006 - Telephone: 541.349.0966

AutoCAD SHX Text 1501 E Madison Street, Suite 200, Seattle,WA 98122 - Telephone: 206.812.8690

AutoCAD SHX Text 211 East 300 South, Suite 208, Salt Lake City, UT 84111 - Telephone: 801.990.7016

AutoCAD SHX Text Corporate Office: 30 E. Broadway, Suite 150, Eugene, OR 97401 - Telephone: 541.349.0966

Sheets and Views
M-501

File details come from the government source that posted it. Updated .