TGI_3819P16719A02_c0v0.pdf
PDF 244 KB Posted
- Solicitation number
- N6264925RA024
About this file
This document is a Task Group Instruction (TGI) for replacing watertight hatch 5-110-1 on the USS BLUE RIDGE (LCC-19), a naval vessel. The specific work involves removing and installing a new watertight hatch measuring 30 inches x 48 inches, located in the Trunk, Emergency Generator Room No. 2, and Emergency Switch Gear Room No. 2. The instruction details precise technical requirements, including fabricating new air test fittings, lubricating dogging mechanisms, installing new gaskets, and performing operational tests with zero allowable leakage or sticking.
The work is scheduled to commence on 1/12/2026 and complete by 6/12/2027, with multiple specific procedural steps required, such as chalk tests, air hose tests, and surface treatments. Special requirements include fabricating a non-flammable closure for the fire zone boundary and potential hazards include asbestos and lead exposure. The task involves multiple material components, including steel hatches, rubber seals, metal pipes, wire rope, insulation, and adhesives, with materials to be ordered and managed by specific personnel from Code 231B.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: HATCH 5-110-1 HA A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 16711 19P
CU PHASE TITLE:
*F/O - REPLACE WATERTIGHT HATCH 5-110-1
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
TAKAAKI ASHINA 231B 315-243-4370 14-MAY-2024
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B 315-243-4502 14-MAY-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: HATCH 5-110-1 HA A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J-1 M1-2
1. SCOPE/PURPOSE
1.1 Title: Watertight Hatch 5-110-1; replace
1.2 Location of Work:
1.2.1 Trunk (5-109-1-T)
1.2.2 Emergency Generator Room No. 2 (7-109-1-E)
1.2.3 Emergency Switch Gear Room No. 2 (6-109-1-E)
1.3 Identification:
1.3.1 Quantity (One EA), Hatch, Watertight
Hatch No. : 5-110-1 Size: 30 Inches x 48 Inches Material: Steel Type: Raised, Individually Dogged, 10 Dogs
1.3.1.1 Quantity (One EA), Scuttle, Watertight
Scuttle No. : 5-110-1 Size: 18 Inches Diameter Material: Steel Type: Raised, Quick Acting, 3 Dogs
1.3.2 Quantity (One EA), Air Test Fitting on Outboard Side of Hatch Coaming
Remarks: See 2.9 for material and detail
1.3.3 Quantity (4 EA), Label Plate, Watertight Hatch
1.3.3.1 Quantity (One EA), Label Plate, Upper Side
Material: Aluminum Alloy, Type-I of 2.11 Inscription: 1st. Line: 5-110-1
2nd. Line: EMER GEN RM NO. 2 3rd. Line: 7-109-1-E
1.3.3.2 Quantity (One EA), Label Plate, Lower Side
Material: Aluminum Alloy, Type-I of 2.11 Inscription: 1st. Line: 5-110-1
2nd. Line: TRUNK 3rd. Line: 5-109-1-T
FOUO
SHIP: LCC-19 CHG/VER: 0/0
1.3.3.3 Quantity (2 EA), Label Plate, Damage Control Closure Classification, Upper Side and Lower Side
Material: Aluminum Alloy, Type-I of 2.11 Remarks: Figure-E of 2.11
1.3.4 Quantity (4 EA), Label Plate, Watertight Scuttle
1.3.4.1 Quantity (One EA), Label Plate, Upper Side
Material: Aluminum Alloy, Type-I of 2.11 Inscription: 1st. Line: 5-110-1
2nd. Line: EMER GEN RM NO. 2 3rd. Line: 7-109-1-E
1.3.4.2 Quantity (One EA), Label Plate, Lower Side
Material: Aluminum Alloy, Type-I of 2.11 Inscription: 1st. Line: 5-110-1
2nd. Line: TRUNK 3rd. Line: 5-109-1-T
1.3.4.3 Quantity (2 EA), Label Plate, Damage Control Closure Classification, Upper Side and Lower Side
Material: Aluminum Alloy, Type-I of 2.11 Remarks: Figure-D of 2.11
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.5.2 Potential Lead Hazard
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 123-
2491194
HATCH & SCUTTLE LIST E Y 5B
4 DWG 805-
1624073
Hatch W.T. Raised Individually Dogged 30" x 48" Without Scuttle 5 8 15 P.S.I.
E N
5 DWG 805-
1624072
HATCH W.T. RAISED
INDIVIDUALLY DOGGED MISC
DETAILS
C N
6 DWG 805-
1624071
HATCH W.T. RAISED
INDIVIDUALLY DOGGED DOG,
HINGE, BRACE, & MISC DETAILS
D N
7 DWG 803-
1401890
SCUTTLE, WT, RAISED QUICK
ACTING, 18 DIA 35 PSI-
ARRANGEMENT
H N
1/12/2026
6/12/2027
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
8 DWG 803-
1623943
Scuttle, WT, QA 18, 21 & 25 DIA, Raised Details
E N
9 PDD 167-
ELM-230341
SRF-JRMC STD ELM DETAIL OF
AIR TEST FITTING ON STL
STRUCTURE
- Y AL
L
10 DWG 104-
2491049
5th Deck PLTG FR102-1/4 - Stern M Y AL
11 PDD 602-
ELM-150531
SRF-JRMC STD ELM LABEL
PLATE FOR CLOSURE
A Y AL
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Remove existing and install new each hatch and part listed in 1.3.1 and air test fitting listed in 1.3.2 in accordance with 2.3 through 2.9, using 2.10 for guidance.
5.1.1 Fabricate each new air test fitting listed in 1.3.2.
5.1.2 Lubricate each new dogging mechanisms.
5.1.3 Fabricate and install new gasket conforming to A-A-59588 Class 3B Grade 30.
5.1.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A and D, Lines One through 7.
5.1.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each hatch and each new weld and cap of each air test fitting. Allowable leakage: None.
5.1.6 Adjust each dogging mechanism for unobstructed operation and to obtain 100 percent centered contact with the imprint of chalk in the center three-fifths of the gasket.
5.2 Accomplish an operational test of each hatch listed in 1.3.1 to assure unobstructed operation. Allowable sticking or binding: None.
(V)(G) “OPERATION TEST”
5.3 Accomplish the requirements of 009-25 of 2.1 for a chalk test of hatch and scuttle of each hatch listed in 1.3.1.
5.4 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of hatch panel and scuttle panel gasket and knife edge mating area of each hatch listed in 1.3.1. Allowable leakage: None.
5.5 Remove existing, fabricate and install new each label plate listed in 1.3.3 and 1.3.4 in accordance with 2.11.
5.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.7 Notes:
5.7.1 Planner: Code 231B T. Ashina, 243-4370
5.7.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.7.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.7.4 JCN ER09-0350 is related to this TGI.
5.8 Government Furnished Material (GFM):
5.8.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.9 SRF-JRMC will provide the following service work: (TGI No. 3819P16719S02).
5.9.1 [C740] Crane and crane rigging service.
5.9.2 [X99E] Utility service, electrical.
5.9.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.9.6 [C133] QA Inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
16711 HATCH 5-110-1 HA A 0 0
CU PHASE TITLE:
*F/O - REPLACE WATERTIGHT HATCH 5-110-1
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE 5-109-1-T 5 U
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P16719 A02
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to replace watertight hatch 5-110-1.
Location of Work:
Trunk (5-109-1-T) Emergency Generator Room No. 2 (7-109-1-E) Emergency Switch Gear Room No. 2 (6-109-1-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 SFTR HRs, WELD HRs, CARP HRs, PNTR HRs, QA HRs, RGRS HRs, INSL HRs
22 KE PC
5.2 SFTR HRs 22 KE PC
5.3 SFTR HRs 22 KE PC
5.4 SFTR HRs 22 KE PC
5.5 SFTR HRs 22 KE PC
5.6 PNTR HRs, QA HRs 22 KE PC
Structure Work CFM: $ for all paints, thinner, marine chemist, grits including disposal cost, strongback material cost, asbestos sampler cost and analysis cost for compartment insulation, lead analysis cost, label plate cost, firewatch cost,---continue to below---
22 MQ CS
---continued to from above---air compressor rental cost and fuel oil cost for air hose test, and misc such as electrode, gases, temporary covering and closure material, and other consumable.
22 MQ CS
Process Funding Document 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
16711 HATCH 5-110-1 HA A 0 0
CU PHASE TITLE:
*F/O - REPLACE WATERTIGHT HATCH 5-110-1
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P16719 A02
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M WTRTT HATCH,W/SCUTTL,
ORIG: C231B T. ASHINA 243-
4370, ORDERED FOR KTR
9B 2040 LL9310577 NA 4 N 41277446 1/AY
002 M RUBBER S, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9B 5330 013717183 NA 4 N 41255022 20/FT
003 M RUBBER STRIP, ORIG: C231B
T. ASHINA 243-4370, ORDERED
FOR KTR
9B 9320 014749075 NA 4 N 41255040 20/FT
004 M PIPE, METAL, 3/4"IPS, 1 EA X
10FT CONTINUES LENGTH
RQRD.
PIPE, METAL, CRES 316,
3/4"IPS X SCHEDULE 80, ASTM
A312 GR TP 316, SEAMLESS.
ORIG: C231B T. ASHINA 243-
4370, ORDERED FOR KTR
9B 4710 LL9304284 NA 4 N 41277425 10/FT
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
005 M BAR,METAL, 1/8"DIA, , 1 EA X
10FT CONTINUES LENGTH
RQRD.
BAR, METAL, ROUND, 1/8"DIA,
316 CRES , ASTM A276
CONDITION A TYPE 316.
ORIG: C231B T. ASHINA 243-
4370, ORDERED FOR KTR
9B 9510 LL9304283 NA 4 N 41277424 10/FT
006 M CAP, THR, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9C 4730 LL6877493 NA 4 N 41257411 1/EA
007 M ROPE,WIRE, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9B 4010 015618311 NA 4 N 41255039 2/FT
008 M INSULATI, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9Q 5640 008096312 NA 4 N 41255021 5/EA
009 M INSULATI, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9Q 5640 008096315 NA 4 N 41255020 5/EA
010 M TAPE,TEX, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9B 8315 002671632 NA 4 N 41255019 1/RO
011 M TAPE,TEX, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9B 8315 002671633 NA 4 N 41255018 1/RO
012 M ADHESIVE, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9B 8040 002738708 NA 4 Y 41255007 1/GL
013 M RUBBER S, ORIG: C231B T.
ASHINA 243-4370, ORDERED
FOR KTR
9B 5330 013717183 NA 4 N 41345012 20/FT
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 HATCH 5-110-1 HA A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P16719 A02
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 HATCH 5-110-1 HA A 0
File details come from the government source that posted it. Updated .