Technical Exhibits C_2nd OY_Door System_W912PB26QA018.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- W912PB26QA018
About this file
This is a Technical Exhibit C pricing template for the 2nd Option Year (01-AUG-2028 to 31-JUL-2029) of an indefinite delivery contract for maintenance, repair, and safety inspection services of door systems at multiple USAG Bavaria Military Communities in Germany.
The contract covers preventive maintenance and safety inspections of various door system types across four military installations: Tower Barracks (CLIN 2001), Rose Barracks (CLIN 2006), Hohenfels (CLIN 2011), and Garmisch (CLIN 2016). Services apply to manual operated sectional doors, power operated automatic doors, power operated sectional doors, power operated side sliding gates, power operated rolling grills, and power operated venetian blinds. Quantities vary by location: Tower Barracks includes 331 total units; Rose Barracks includes 278 units; Hohenfels includes 111 units; and Garmisch includes 47 units. The pricing structure is organized by individual equipment line items (ELINs) within each CLIN, with unit pricing required for each door system type. The document includes an exchange rate of 0.9303 (EUR/$) for the option year pricing calculation. All pricing and total amounts columns are blank, indicating this is a template awaiting contractor pricing inputs for the 2nd option year performance period.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Maintenance and Repair Door Systems 2nd Option Year - ELIN-Sheet | |
| PoP: 01-AUG-2028 - 31-JUL-2029 | Technical Exibit C |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| 2nd Option - Tower Barracks | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 3 | 1 | LS | |||
| 2001 | C001AA | Manual Operated Sectional Door | 22 | EA | |
| 2001 | C001AB | Power Operated Automatic Door | 75 | EA | |
| 2001 | C001AC | Power Operated Sectional Doors | 163 | EA | |
| 2001 | C001AD | Power Operated Side Sliding Gate | 12 | EA | |
| 2001 | C001AE | Power Operated Rolling Grill | 59 | EA | |
| 2001 | C001AF | Power Operated Venetian Blind | 1 | EA | |
| Total CLIN 2001 - 2nd Option Year - Tower Barracks |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| 2nd Option - Rose Barracks | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 3 | 1 | LS | |||
| 2006 | C006AA | Manual Operated Sectional Door | 5 | EA | |
| 2006 | C006AB | Power Operated Automatic Door | 52 | EA | |
| 2006 | C006AC | Power Operated Sectional Doors | 178 | EA | |
| 2006 | C006AD | Power Operated Side Sliding Gate | 4 | EA | |
| 2006 | C006AE | Power Operated Rolling Grill | 38 | EA | |
| 2006 | C006AF | Power Operated Venetian Blind | 1 | EA | |
| Total CLIN 2006 - 2nd Option Year - Rose Barracks |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| 2nd Option - Hohenfels, | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 4 | 1 | LS | |||
| 2011 | C011AA | Manual Operated Sectional Door | 1 | EA | |
| 2011 | C011AB | Power Operated Automatic Door | 23 | EA | |
| 2011 | C011AC | Power Operated Sectional Doors | 61 | EA | |
| 2011 | C011AD | Power Operated Side Sliding Gate | 7 | EA | |
| 2011 | C011AE | Power Operated Rolling Grill | 18 | EA | |
| 2011 | C011AF | Power Operated Venetian Blind | 1 | EA | |
| Total CLIN 1011 - 1st Option Year - Hohenfels |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| 2nd Option - Garmisch, | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 3 | 1 | LS | |||
| 2016 | C016AA | Manual Operated Sectional Door | 3 | EA | |
| 2016 | C016AB | Power Operated Automatic Door | 16 | EA | |
| 2016 | C016AC | Power Operated Sectional Doors | 17 | EA | |
| 2016 | C016AD | Power Operated Side Sliding Gate | 2 | EA | |
| 2016 | C016AE | Power Operated Rolling Grill | 4 | EA | |
| 2016 | C016AF | Power Operated Venetian Blind | 5 | EA | |
| Total CLIN 2016 - 2nd Option Year - Garmisch |
| Option Total | ||
| CR FY26 [€/$] | 0.9303 | 0 |
File details come from the government source that posted it. Updated .