Technical Exhibits A_Basic Year_Door System_W912PB26QA018.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- W912PB26QA018
About this file
This is a Technical Exhibit pricing template for preventive maintenance and safety inspection services on door systems across four U.S. Army military installations in Bavaria, Germany, during the basic contract year (1 August 2026 – 31 July 2027). The contract covers maintenance and repair of six categories of doors and gates: manual operated sectional doors, power operated automatic doors, power operated sectional doors, power operated side sliding gates, power operated rolling grills, and power operated venetian blinds. The pricing structure is organized by location and equipment type, with line items for Tower Barracks (CLIN 0001), Rose Barracks (CLIN 0006), Hohenfels (CLIN 0011), and Garmisch (CLIN 0016), each broken down into individual equipment line numbers (ELINs) with associated quantities in units. Total quantities across all locations include 31 manual operated sectional doors, 166 power operated automatic doors, 419 power operated sectional doors, 25 power operated side sliding gates, 119 power operated rolling grills, and 8 power operated venetian blinds.
Bidders are required to provide unit pricing for each equipment category at each location, with all pricing to be submitted in the specified currency with an exchange rate of EUR/$ 0.9303 noted. This is part of a solicitation (W912PB26QA018) for a commercial, single-award hybrid contract utilizing Firm Fixed Price, Labor Hour, and Time & Material approaches as an Indefinite Delivery Type contract. The Period of Performance includes a one-year base period with two one-year option periods. Interested contractors must be registered in the System for Award Management (SAM) and submit questions via email to the specified Army contracting personnel.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Maintenance and Repair Door Systems Basic Year - ELIN-Sheet | |
| PoP: 01-AUG-2026 - 31-JUL-2027 | Technical Exibit A |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| Basic Year - Tower Barracks | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 3 | 1 | LS | |||
| 0001 | A001AA | Manual Operated Sectional Door | 22 | EA | |
| 0001 | A001AB | Power Operated Automatic Door | 75 | EA | |
| 0001 | A001AC | Power Operated Sectional Doors | 163 | EA | |
| 0001 | A001AD | Power Operated Side Sliding Gate | 12 | EA | |
| 0001 | A001AE | Power Operated Rolling Grill | 59 | EA | |
| 0001 | A001AF | Power Operated Venetian Blind | 1 | EA | |
| Total CLIN 0001 - Basic Year - Tower Barracks |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| Basic Year - Rose Barracks | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 3 | 1 | LS | |||
| 0006 | A006AA | Manual Operated Sectional Door | 5 | EA | |
| 0006 | A006AB | Power Operated Automatic Door | 52 | EA | |
| 0006 | A006AC | Power Operated Sectional Doors | 178 | EA | |
| 0006 | A006AD | Power Operated Side Sliding Gate | 4 | EA | |
| 0006 | A006AE | Power Operated Rolling Grill | 38 | EA | |
| 0006 | A006AF | Power Operated Venetian Blind | 1 | EA | |
| Total CLIN 0006 - Basic Year - Rose Barracks |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| Basic Year - Hohenfels, | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 4 | 1 | LS | |||
| 0011 | A011AA | Manual Operated Sectional Door | 1 | EA | |
| 0011 | A011AB | Power Operated Automatic Door | 23 | EA | |
| 0011 | A011AC | Power Operated Sectional Doors | 61 | EA | |
| 0011 | A011AD | Power Operated Side Sliding Gate | 7 | EA | |
| 0011 | A011AE | Power Operated Rolling Grill | 18 | EA | |
| 0011 | A011AF | Power Operated Venetian Blind | 1 | EA | |
| Total CLIN 0011 - Basic Year - Hohenfels |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| Basic Year - Garmisch, | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 3 | 1 | LS | |||
| 0016 | A016AA | Manual Operated Sectional Door | 3 | EA | |
| 0016 | A016AB | Power Operated Automatic Door | 16 | EA | |
| 0016 | A016AC | Power Operated Sectional Doors | 17 | EA | |
| 0016 | A016AD | Power Operated Side Sliding Gate | 2 | EA | |
| 0016 | A016AE | Power Operated Rolling Grill | 4 | EA | |
| 0016 | A016AF | Power Operated Venetian Blind | 5 | EA | |
| Total CLIN 0016 - Basic Year - Garmisch |
| Option Total | ||
| CR FY26 [€/$] | 0.9303 | $ - 0 |
File details come from the government source that posted it. Updated .