Attachment 5 - Work Certificate PM_W912PB26QA018.pdf
PDF 42 KB Posted
- Solicitation number
- W912PB26QA018
About this file
This is a Work Certificate template for Preventive Maintenance services used to document and authorize equipment maintenance work performed by a contractor.
The certificate serves as an official record of preventive maintenance activities and requires completion of multiple data fields including inventory number, site location, customer information, equipment details (type, manufacturer, model, year of manufacture), and Contract Line Item Number (CLIN). The work section captures the maintenance service period (start and finish dates), assigned technician name, maintenance frequency interval, quantity of services, unit price, and total price in Euros. The form includes dedicated sections for listing materials and maintenance parts used during the service and for documenting the condition of equipment following maintenance completion. A safety inspection label attachment is indicated with yes/no checkboxes. The certificate requires three authorized signatures: customer/client signature with date, technician signature with date, and inspector or Contracting Officer's Representative (COR) signature with date. The total price amount in Euros is displayed prominently at the bottom of the form. This template is designed for bilingual use with parallel German and English terminology throughout.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 5 - Work Certificate Preventive Maintenance (Name Contractor)
Work Certificate - Preventive Maintenance
Inventur Nr. / Inventory No.
Standort / Community
Kunde / Customer Adresse Geb./ Address Bldg.
Gerät Typ / Equipment Type Hersteller / Manufacturer
Modell / Model Baujahr / Year of Manufactured
CLIN Nr. Datum Beginn Datum Ende Technician Wartung Intervall Menge Einzelpreis Gesamtpreis
CLIN No. Date Start Date Finish Techniker Maint. Frequency Quantity Single Price Total Price
Material / Used Maintenance Parts:
Anlagenzustand / Condition of Equipment:
Safety Inspection Label attached: Yes No
Datum, Unterschrift (Kunde) / Date, Signature (Customer)
Gesamt Preis / Total Price EURO
Datum, Unterschrift (Techniker) / Date, Signature (Technician) Datum, Unterschrift (Inspektor / COR) / Date, Signature (Inspector COR)
File details come from the government source that posted it. Updated .