Technical Exhibits B_1st OY_Door System_W912PB26QA018.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- W912PB26QA018
About this file
This is a Technical Exhibits pricing document for the first option year (1 August 2027 – 31 July 2028) of a Maintenance, Repair and Safety Inspection of Door Systems contract (W912PB26QA018) for USAG Bavaria Military Communities in Germany. The document outlines the quantities and pricing structure for preventive maintenance and safety inspections of various door system types across four military installations: Tower Barracks, Rose Barracks, Hohenfels, and Garmisch.
The contract covers six categories of door systems requiring maintenance and inspection: Manual Operated Sectional Doors, Power Operated Automatic Doors, Power Operated Sectional Doors, Power Operated Side Sliding Gates, Power Operated Rolling Grills, and Power Operated Venetian Blinds. Quantities vary by location, with Tower Barracks requiring the most extensive services (22 manual sectional doors, 75 automatic doors, and 163 sectional doors), followed by Rose Barracks (5 manual sectional, 52 automatic, and 178 sectional doors), Hohenfels (1 manual sectional, 23 automatic, and 61 sectional doors), and Garmisch (3 manual sectional, 16 automatic, and 17 sectional doors). Each line item includes unit pricing and total amount fields to be completed by offerors, with an exchange rate of 0.9303 EUR/$ noted for the first option year pricing.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Maintenance and Repair Door Systems 1st Option Year - ELIN-Sheet | |
| PoP: 01-AUG-2027 - 31-JUL-2028 | Technical Exibit B |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| 1st Option - Tower Barracks | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 3 | 1 | LS | |||
| 1001 | B001AA | Manual Operated Sectional Door | 22 | EA | |
| 1001 | B001AB | Power Operated Automatic Door | 75 | EA | |
| 1001 | B001AC | Power Operated Sectional Doors | 163 | EA | |
| 1001 | B001AD | Power Operated Side Sliding Gate | 12 | EA | |
| 1001 | B001AE | Power Operated Rolling Grill | 59 | EA | |
| 1001 | B001AF | Power Operated Venetian Blind | 1 | EA | |
| Total CLIN 1001 - 1st Option Year - Tower Barracks |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| 1st Option - Rose Barracks | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 3 | 1 | LS | |||
| 1006 | B006AA | Manual Operated Sectional Door | 5 | EA | |
| 1006 | B006AB | Power Operated Automatic Door | 52 | EA | |
| 1006 | B006AC | Power Operated Sectional Doors | 178 | EA | |
| 1006 | B006AD | Power Operated Side Sliding Gate | 4 | EA | |
| 1006 | B006AE | Power Operated Rolling Grill | 38 | EA | |
| 1006 | B006AF | Power Operated Venetian Blind | 1 | EA | |
| Total CLIN 1006 - 1st Option Year - Rose Barracks |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| 1st Option - Hohenfels, | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 4 | 1 | LS | |||
| 1011 | B011AA | Manual Operated Sectional Door | 1 | EA | |
| 1011 | B011AB | Power Operated Automatic Door | 23 | EA | |
| 1011 | B011AC | Power Operated Sectional Doors | 61 | EA | |
| 1011 | B011AD | Power Operated Side Sliding Gate | 7 | EA | |
| 1011 | B011AE | Power Operated Rolling Grill | 18 | EA | |
| 1011 | B011AF | Power Operated Venetian Blind | 1 | EA | |
| Total CLIN 1011 - 1st Option Year - Hohenfels |
| CLIN | |||||
| No | ELIN | ||||
| No | DESCRIPTION | Quan- titiy | Unit | UNIT PRICE | TOTAL AMOUNT |
| 1st Option - Garmisch, | |||||
| Preventive Maintenance (PM) and Safety Inspection at Door Systems IAW the Performance Work Statement Para 5 and Attachment 3 | 1 | LS | |||
| 1016 | B016AA | Manual Operated Sectional Door | 3 | EA | |
| 1016 | B016AB | Power Operated Automatic Door | 16 | EA | |
| 1016 | B016AC | Power Operated Sectional Doors | 17 | EA | |
| 1016 | B016AD | Power Operated Side Sliding Gate | 2 | EA | |
| 1016 | B016AE | Power Operated Rolling Grill | 4 | EA | |
| 1016 | B016AF | Power Operated Venetian Blind | 5 | EA | |
| Total CLIN 1016 - 1st Option Year - Garmisch |
| Option Total | ||
| CR FY26 [€/$] | 0.9303 | 0 |
File details come from the government source that posted it. Updated .