This Technical Exhibit 8.8 Deliverables document outlines the comprehensive reporting and notification requirements for the Cantonment Grounds Contract at DPW Fort Rucker, Alabama, effective August 2025. The document details 29 distinct deliverables spanning safety protocols, training requirements, work scheduling, and environmental compliance, with each deliverable specifying the frequency, number of copies, format (hard copy and PDF), and distribution to the Contracting Officer (KO) and Contracting Officer's Representative (COR/ACOR).
Key deliverables include anti-terrorism and iWATCH training certificate submissions, emergency and safety notifications (such as hazardous substance spills), monthly work schedules, daily status reports, equipment lists, and detailed herbicide application records. Contractors must submit most documents within specific timeframes, ranging from 1 day to 30 calendar days after contract award or specific events, and provide two copies in both hard copy and PDF format to ensure comprehensive documentation and communication with government representatives.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 8.8
DELIVERABLES
# Deliverable Frequency # of Copies
Medium/F ormat
Distribution
1 1.8.5 Emergency Delays
•If the Contractor determines unsafe weather conditions or work environment is cause for an interruption of services, the Contractor shall notify the COR (2) hours prior to curtailing operations (Deliverable 1) .
2 Hard copy and PDF copy
KO and
COR/ACOR
2 1.8.8.3.1 Anti- Terrorism (AT) Level I Training.
•The Contractor shall submit certificates of completion for each affected contract employee and subcontractor employee to the KO or COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis.
(Deliverable 2).
2 Hard copy and PDF copy
KO and
COR/ACOR
3 1.8.8.3.1 Anti- Terrorism (AT) Level I Training.
•The Contractor must present the training certificate to the KO or designated Government representative/COR within 30 calendar days (Deliverable 3).
2 Hard copy and PDF copy
KO and
COR/ACOR
4 1.8.8.3.2 iWATCH Training
•The Contractor shall complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government representative/COR via both electronic and paper copy within 30 calendar days of completion (Deliverable 4)
2 Hard copy and PDF copy
KO and
COR/ACOR
DPW Fort Rucker, Al
Cantonment Grounds Contract
TE - 8.8-1 AUGUST 2025
# Deliverable Frequency # of Copies
Medium/F ormat
Distribution
5 1.10.5 Contractor Key Personnel.
Contractor shall provide a resume of key personnel, who will be designated in writing, to the KO within one week of the contract award (Deliverable 5).
2 Hard copy and PDF copy
KO and
COR/ACOR
6 1.10.9 Phase In /Phase Out Period.
The Contractor shall prepare and submit (within ten (10) business days after contract award), a Phase In/Phase Out Plan to be implemented by the Contractor (Deliverable 6).
2 Hard copy and PDF copy
KO and
COR/ACOR
7 1.11.1 Emergency Medical Treatment.
•If injuries incurred while an employee is performing work under this contract, the contractor shall verbally notify the KO/COR no later than (NLT) two (2) hours after an emergency medical event, followed by a documented summary of events (Deliverable 7).
2 Hard copy and PDF copy
KO and
COR/ACOR
8 1.11.2 Accident Reporting.
•The Contractor shall provide a verbal report to the KO/COR within two (2) hours of each such occurrence (Deliverable 8).
2 Hard copy and PDF copy
KO and
COR/ACOR
9 1.11.2 Accident Reporting.
•The contractor shall deliver a completed ENG Form 3394, United States Army Corps of Engineers Accident Investigation Report (or equivalent form), to the KO or designated Government representative/COR detailing the mishap within five (5) business days of occurrence, whenever the incident involves personal injury or damage to government property (Deliverable 9).
2 Hard copy and PDF copy
KO and
COR/ACOR
DPW Fort Rucker, Al
TE - 8.8-2 AUGUST 2025
# Deliverable Frequency # of Copies
Medium/F ormat
Distribution
10 1.12 Safety, Environment and OSHA.
•The Contractor shall notify the KO and authorized representative(s) via email outlining the details for each said conflict such that a final resolution is derived (Deliverable10).
2 Hard copy and PDF copy
KO and
COR/ACOR
11 1.12.1 Safety. • Upon discovery of a serious hazard such as, but not limited to, fire, or fuel spill, the Contractor shall immediately notify the KO and designated authorized representatives verbally followed up with an email notification within one (1) hour (Deliverable11).
2 Hard copy and PDF copy
KO and
COR/ACOR
12 1.12.1 Safety. •As prescribed in 246.371(a), DFARS 252.246- 7003 Notification of Potential Safety Issues, the contractor shall notify the COR as soon as practicable, but not later than 72 hours after discovering or acquiring credible information concerning potential safety issues. (Deliverable12).
2 Hard copy and PDF copy
KO and
COR/ACOR
13 1.12.2 Safety Plan.
•The Contractor shall submit the safety plan to the KO/COR for review and acceptance within thirty
(30) business days after contract award (Deliverable13).
2 Hard copy and PDF copy
KO and
COR/ACOR
14 1.12.2 Safety Plan.
•Revisions shall be submitted to the KO/COR five (5) business days prior to the effective date of change (Deliverable14)..
2 Hard copy and PDF copy
KO and
COR/ACOR
DPW Fort Rucker, Al
TE - 8.8-3 AUGUST 2025
# Deliverable Frequency # of Copies
Medium/F ormat
Distribution
15 1.12.3 Spill Plan.
•The contractor shall submit a Site-Specific Spill Plan (USAACE Form 2719) to the KO for approval within thirty (30) days of contract award IAW Fort Novosel's Installation Spill Contingency Plan (Deliverable15).
2 Hard copy and PDF copy
KO and
COR/ACOR
16 1.12.3 Spill Plan.
•The Contractor shall notify the COR/ACOR IMMEDIATELY if the Contractor spills or releases any hazardous substances, i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification (Deliverable16).
2 Hard copy and PDF copy
KO and
COR/ACOR
17 1.12.3 Spill Plan.
• If any hazardous material gets on the ground, in a drain or in a waterway it must IMMEDIATELY be reported by dialing 911 and by calling, Fort Novosel
DPW-ENRD, 334-255-1657
(Deliverable17).
2 Hard copy and PDF copy
KO and
COR/ACOR
18 1.13.1 Safety Data Sheets
(SDS).
For materials that have Safety Data Sheets (SDS) associated with them, the Contractor shall submit the SDS to the KO or designated Government representative/COR for approval five (5) business after contract award (Deliverable18).
2 Hard copy and PDF copy
KO and
COR/ACOR
DPW Fort Rucker, Al
TE - 8.8-4 AUGUST 2025
# Deliverable Frequency # of Copies
Medium/F ormat
Distribution
19 1.14.3 Schedule Work.
Proposed work schedules shall be submitted for approval to the KO and COR monthly, at least five
(5) working days prior to the start of the schedule month, and shall indicate the proposed date of accomplishment of all required services by location (Deliverable19).
2 Hard copy and PDF copy
KO and
COR/ACOR
20 1.14.3 Schedule Work.
•The KO and COR shall be notified at least two (2) working days in advance of any changes to the scheduled date of any work requirements.
(Deliverable20).
2 Hard copy and PDF copy
KO and
COR/ACOR
21 1.14.4 Status Reports.
The Contractor shall prepare and provide, on a daily basis, status reports for all mowing services required by the contract.
(Deliverable 21)
2 Hard copy and PDF copy
KO and
COR/ACOR
22 5.2.7 Weed Control.
•The Contractor shall provide copies of these licenses or certifications to the Contracting Officer (KO), not later than (NLT) ten (10) calendar days during the phase-in period, and again within ten (10) calendar days upon a change in personnel. (Deliverable 22)
2 Hard copy and PDF copy
KO and
COR/ACOR
23 5.2.7 Weed Control.
•The Contractor shall submit a consolidated list of all chemicals used during the month, in a monthly herbicide application record to the COR/ACOR. (Deliverable 23)
2 Hard copy and PDF copy
KO and
COR/ACOR
DPW Fort Rucker, Al
TE - 8.8-5 AUGUST 2025
# Deliverable Frequency # of Copies
Medium/F ormat
Distribution
24 5.2.7 Weed Control.
•If the Contractor spills or releases any hazardous substances, i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification, the Contractor shall immediately notify the KO, followed by written notification within one (1) hour. (Deliverable 24)
2 Hard copy and PDF copy
KO and
COR/ACOR
25 5.2.7 Weed Control.
•The Contractor shall submit an herbicide usage report of all herbicides use to the KO within one (1) day after application of any herbicide. (Deliverable 25)
2 Hard copy and PDF copy
KO and
COR/ACOR
26 5.3.3 Herbicide Application to Railroad Rights- Of-Way.
The Contractor will determine the timing of applications and submit to the COR for approval 5 workdays prior to application.
2 Hard copy and PDF copy
COR/ACOR
27 5.3.3.2 Certification of Applicator Personnel .
Contractor s shall submit all required federal, state, and local licenses and/or certifications as part of the solicitation to the KO or COR prior to any onset of chemical applications.
part of the solicitation requirement
28 5.3.3.2 Certification of Applicator Personnel .
Contractor shall also submit applicators resume containing his/her name, educational background, employment history, periods of employment, title, experience history (where, when, duties, level of responsibility, title), and employment status with this company.
part of the solicitation requirement
DPW Fort Rucker, Al
TE - 8.8-6 AUGUST 2025
# Deliverable Frequency # of Copies
Medium/F ormat
Distribution
29 5.5.1.4 The Contractor shall submit a complete equipment list including number, age, make, model, specifications and catalog cut sheets with the proposal.
part of the solicitation requirement
DPW Fort Rucker, Al
TE - 8.8-7 AUGUST 2025
File details come from the government source that posted it. Updated .