Attachment 2 - Bid Schedule.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
W9124G-25-R-A009 Ft. Novosel Cantonment Landscaping Services
Solicitation number
W9124G-25-R-A009
Issued by

About this file

The file is a Bid Schedule Excel spreadsheet for a grounds maintenance services contract for Fort Rucker and Fort Novosel in Alabama. The contract is structured as a base year plus six option years, with a potential six-month extension. Services include comprehensive grounds maintenance across multiple ground classification types: improved grounds (A, B, C), semi-improved grounds, and unimproved grounds, with specific tasks such as mowing, trimming, leaf and debris removal, pruning shrubs and crape myrtles, herbicide application, fertilization, and emergency grass cutting.

The contract line items are detailed for each contract period, with line items covering mobilization, different ground maintenance categories, specialized pruning services, herbicide application, emergency grass cutting, fertilizer and lime application, leaf removal, and contractor manpower reporting. The first year focuses on Fort Rucker, while subsequent option years shift to Fort Novosel. The solicitation is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis, with service expected to begin on 1 March 2026. The quantity for most line items is 1 job, with some specific services like emergency grass cutting and fertilizer application set at 100 jobs per contract period.

View the file

Other files

File Type Posted
UPDATED 2.6 - 8.13 Technical Exhibit (TE-13) Parker School Year Feb-26 V1 (1).pdf PDF
ANSWERED 2.6 Questions.pdf PDF
UPDATED 2.6 - Attachment 1 - Instruction to Offerors and Evaluation Criteria O ISRAEL 2-4-26 1.pdf PDF
LABOR MATRIX - 8.14 Technical Exhibit (8.13) Labor Matrix Form Feb-26 V1 (1).pdf PDF
UPDATED 2.6 - Attachment 3 - PWS MODIFICATION 1 Feb-26 omi.pdf PDF
Attachment 3 - PWS same as Word Version.pdf PDF
TE 8.12 EXAMPLE PAYMENT CALCULATIONS WHEN RESD IS USED August 2025.pdf PDF
TE 8.10 WORK CAPABILITY LEVELS August 2025.pdf PDF
Site Visit - OZARK_GATE_TO_BLDG_5700 1-14-26.jpg JPG image
TE 8.11 Gen loc of internal fencing and cable barriers Auugust 2025.pdf PDF
TE 8.3 TE - Area B REVISION 1 - 30September2025 1 (1).pdf PDF
W9124G-25-R-A009 -Updated on 1.15.26 to close date only 2.11.26 (1).pdf PDF
SITE VISIT RegistrationForm.docx DOCX document
Attachment 4 - SITE VISIT INFORMATION CANTONMENT ITINERARY - UPDATE 1.14.26.docx DOCX document
Attachment - 1 Instruction to Offerors and Evaluation Criteria UPDATE 1.14.26.docx DOCX document
Attachment 1 - Instruction to Offerors and Evaluation Criteria.docx DOCX document
TE 8.1 PRS Table August 2025.pdf PDF
Technical Exhibit 8.3.pdf PDF
Attachment 4 - SITE VISIT INFORMATION CANTONMENT ITINERARY.docx DOCX document
Technical Exhibit 8.2.pdf PDF
TE 8.4 TE - Area C August 2025.pdf PDF
Attachment 3 - PWS.docx DOCX document
Technical Exhibit 8.5.pdf PDF
Technical Exhibit 8.6.pdf PDF
Attachment 5- Site Visit - Gate Map.jpg JPG image
Attachment 6- Past Performance Questionnaire.docx DOCX document
W9124G-25-R-A009.pdf PDF
Technical Exhibit 8.7.pdf PDF
Technical Exhibit 8.8.pdf PDF
Technical Exhibit 8.9.pdf PDF
SCA Wage Determination 2015-4631.txt TXT text file
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE YEAR

COST EST.

CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

0001 MOBILIZATION For Base Year - Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT RUCKER, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB

0002 Grounds Maintenance – IMPROVED GROUNDS "A"

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
0003Grounds Maintenance – IMPROVED GROUNDS "B".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
0004Grounds Maintenance – IMPROVED GROUNDS "C".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
0005Grounds Maintenance – SEMI- IMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.

1JOB
0006Grounds Maintenance – UNIMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.

1JOB
0007Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B"

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".

1JOB
0008Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the

attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"

1JOB
0009HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J".1JOB
0010Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
0011Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6100JOB$ - 0
0012Apply Lime (2 TON/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
0013Leaf Removal as ordered, PWS Section 5.2.8 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
0014Contractor's Manpower Reporting
JOB

TOTAL= $ - 0

Option Year I

COST EST.

CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

1001 MOBILIZATION For Option Year I- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB

1002 Grounds Maintenance – IMPROVED GROUNDS "A"

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
1003Grounds Maintenance – IMPROVED GROUNDS "B".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
1004Grounds Maintenance – IMPROVED GROUNDS "C".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
1005Grounds Maintenance – SEMI- IMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.

1JOB
1006Grounds Maintenance – UNIMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.

1JOB
1007Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B'

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".

1JOB
1008Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the

attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"

1JOB
1009HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J".1JOB
1010Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
1011Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
1012Apply Lime (2 TON/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
1013Leaf Removal as ordered, PWS Section 5.2.8 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
1014Contractor's Manpower Reporting
JOB

TOTAL= $ - 0

Option Year II

COST EST.

CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

2001 MOBILIZATION For Option Year II- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB

2002 Grounds Maintenance – IMPROVED GROUNDS "A"

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
2003Grounds Maintenance – IMPROVED GROUNDS "B".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
2004Grounds Maintenance – IMPROVED GROUNDS "C".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
2005Grounds Maintenance – SEMI- IMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.

1JOB
2006Grounds Maintenance – UNIMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.

1JOB
2007Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B'

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".

1JOB
2008Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the

attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"

1JOB
2009HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J".1JOB
2010Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
2011Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
2012Apply Lime (2 TON/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
2013Leaf Removal as ordered, PWS Section 5.2.8 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
2014Contractor's Manpower Reporting
JOB

TOTAL= $ - 0

Option Year III

COST EST.

CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

3001 MOBILIZATION For Option Year III- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB

3002 Grounds Maintenance – IMPROVED GROUNDS "A"

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
3003Grounds Maintenance – IMPROVED GROUNDS "B".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
3004Grounds Maintenance – IMPROVED GROUNDS "C".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
3005Grounds Maintenance – SEMI- IMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.

1JOB
3006Grounds Maintenance – UNIMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.

1JOB
3007Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B'

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".

1JOB
3008Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the

attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"

1JOB
3009HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J".1JOB
3010Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
3011Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
3012Apply Lime (2 TON/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
3013Leaf Removal as ordered, PWS Section 5.2.8 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
3014Contractor's Manpower Reporting
JOB

TOTAL= $ - 0

Option Year IV

COST EST.

CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

4001 MOBILIZATION For Option Year IV- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB

4002 Grounds Maintenance – IMPROVED GROUNDS "A"

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
4003Grounds Maintenance – IMPROVED GROUNDS "B".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
4004Grounds Maintenance – IMPROVED GROUNDS "C".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
4005Grounds Maintenance – SEMI- IMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.

1JOB
4006Grounds Maintenance – UNIMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.

1JOB
4007Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B'

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".

1JOB
4008Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the

attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"

1JOB
4009HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J".1JOB
4010Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
4011Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
4012Apply Lime (2 TON/AC), PWS Section 5.2.6- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
4013Leaf Removal as ordered, PWS Section 5.2.8- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
4014Contractor's Manpower Reporting
JOB

TOTAL= $ - 0

Option Year V

COST EST.

CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

5001 MOBILIZATION For Option Year V- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB

5002 Grounds Maintenance – IMPROVED GROUNDS "A"

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
5003Grounds Maintenance – IMPROVED GROUNDS "B".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
5004Grounds Maintenance – IMPROVED GROUNDS "C".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
5005Grounds Maintenance – SEMI- IMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.

1JOB
5006Grounds Maintenance – UNIMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.

1JOB
5007Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B'

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".

1JOB
5008Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the

attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"

1JOB
5009HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J".1JOB
5010Emergency and special events grass cutting, PWS Section 5.2.11- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.5JOB$ - 0
5011Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
5012Apply Lime (2 TON/AC), PWS Section 5.2.6- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
5013Leaf Removal as ordered, PWS Section 5.2.8- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
5014Contractor's Manpower Reporting
JOB

TOTAL= $ - 0

Option Year VI

COST EST.

CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

6001 DEMOBILIZATION For Option Year VI- The Contractor shall demobilize as required for the proper performance and completion of the Work, including the removal of all equipment, machinery, and manpower from the site. 1 JOB

6002 Grounds Maintenance – IMPROVED GROUNDS "A"

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
6003Grounds Maintenance – IMPROVED GROUNDS "B".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
6004Grounds Maintenance – IMPROVED GROUNDS "C".

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.

1JOB
6005Grounds Maintenance – SEMI- IMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.

1JOB
6006Grounds Maintenance – UNIMPROVED GROUNDS.

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.

1JOB
6007Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B'

Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".

1JOB
6008Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the

attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"

1JOB
6009HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J".1JOB
6010Emergency and special events grass cutting, PWS Section 5.2.11- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
6011Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
6012Apply Lime (2 TON/AC), PWS Section 5.2.6- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
6013Leaf Removal as ordered, PWS Section 5.2.8- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity.100JOB$ - 0
6014Contractor's Manpower Reporting
JOB

TOTAL= $ - 0