Attachment 2 - Bid Schedule.xlsx
XLSX spreadsheet 34 KB Posted
- Solicitation number
- W9124G-25-R-A009
About this file
The file is a Bid Schedule Excel spreadsheet for a grounds maintenance services contract for Fort Rucker and Fort Novosel in Alabama. The contract is structured as a base year plus six option years, with a potential six-month extension. Services include comprehensive grounds maintenance across multiple ground classification types: improved grounds (A, B, C), semi-improved grounds, and unimproved grounds, with specific tasks such as mowing, trimming, leaf and debris removal, pruning shrubs and crape myrtles, herbicide application, fertilization, and emergency grass cutting.
The contract line items are detailed for each contract period, with line items covering mobilization, different ground maintenance categories, specialized pruning services, herbicide application, emergency grass cutting, fertilizer and lime application, leaf removal, and contractor manpower reporting. The first year focuses on Fort Rucker, while subsequent option years shift to Fort Novosel. The solicitation is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis, with service expected to begin on 1 March 2026. The quantity for most line items is 1 job, with some specific services like emergency grass cutting and fertilizer application set at 100 jobs per contract period.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE YEAR
COST EST.
CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
0001 MOBILIZATION For Base Year - Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT RUCKER, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB
0002 Grounds Maintenance – IMPROVED GROUNDS "A"
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 0003 | Grounds Maintenance – IMPROVED GROUNDS "B". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 0004 | Grounds Maintenance – IMPROVED GROUNDS "C". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 0005 | Grounds Maintenance – SEMI- IMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.
| 1 | JOB |
| 0006 | Grounds Maintenance – UNIMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.
| 1 | JOB |
| 0007 | Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B" |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".
| 1 | JOB |
| 0008 | Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the |
attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"
| 1 | JOB | |||
| 0009 | HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J". | 1 | JOB | |
| 0010 | Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 0011 | Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 | 100 | JOB | $ - 0 |
| 0012 | Apply Lime (2 TON/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 0013 | Leaf Removal as ordered, PWS Section 5.2.8 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 0014 | Contractor's Manpower Reporting | |||
| JOB |
TOTAL= $ - 0
Option Year I
COST EST.
CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
1001 MOBILIZATION For Option Year I- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB
1002 Grounds Maintenance – IMPROVED GROUNDS "A"
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 1003 | Grounds Maintenance – IMPROVED GROUNDS "B". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 1004 | Grounds Maintenance – IMPROVED GROUNDS "C". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 1005 | Grounds Maintenance – SEMI- IMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.
| 1 | JOB |
| 1006 | Grounds Maintenance – UNIMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.
| 1 | JOB |
| 1007 | Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B' |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".
| 1 | JOB |
| 1008 | Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the |
attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"
| 1 | JOB | |||
| 1009 | HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J". | 1 | JOB | |
| 1010 | Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 1011 | Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 1012 | Apply Lime (2 TON/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 1013 | Leaf Removal as ordered, PWS Section 5.2.8 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 1014 | Contractor's Manpower Reporting | |||
| JOB |
TOTAL= $ - 0
Option Year II
COST EST.
CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
2001 MOBILIZATION For Option Year II- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB
2002 Grounds Maintenance – IMPROVED GROUNDS "A"
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 2003 | Grounds Maintenance – IMPROVED GROUNDS "B". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 2004 | Grounds Maintenance – IMPROVED GROUNDS "C". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 2005 | Grounds Maintenance – SEMI- IMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.
| 1 | JOB |
| 2006 | Grounds Maintenance – UNIMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.
| 1 | JOB |
| 2007 | Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B' |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".
| 1 | JOB |
| 2008 | Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the |
attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"
| 1 | JOB | |||
| 2009 | HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J". | 1 | JOB | |
| 2010 | Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 2011 | Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 2012 | Apply Lime (2 TON/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 2013 | Leaf Removal as ordered, PWS Section 5.2.8 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 2014 | Contractor's Manpower Reporting | |||
| JOB |
TOTAL= $ - 0
Option Year III
COST EST.
CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
3001 MOBILIZATION For Option Year III- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB
3002 Grounds Maintenance – IMPROVED GROUNDS "A"
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 3003 | Grounds Maintenance – IMPROVED GROUNDS "B". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 3004 | Grounds Maintenance – IMPROVED GROUNDS "C". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 3005 | Grounds Maintenance – SEMI- IMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.
| 1 | JOB |
| 3006 | Grounds Maintenance – UNIMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.
| 1 | JOB |
| 3007 | Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B' |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".
| 1 | JOB |
| 3008 | Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the |
attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"
| 1 | JOB | |||
| 3009 | HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J". | 1 | JOB | |
| 3010 | Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 3011 | Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 3012 | Apply Lime (2 TON/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 3013 | Leaf Removal as ordered, PWS Section 5.2.8 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 3014 | Contractor's Manpower Reporting | |||
| JOB |
TOTAL= $ - 0
Option Year IV
COST EST.
CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
4001 MOBILIZATION For Option Year IV- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB
4002 Grounds Maintenance – IMPROVED GROUNDS "A"
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 4003 | Grounds Maintenance – IMPROVED GROUNDS "B". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 4004 | Grounds Maintenance – IMPROVED GROUNDS "C". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 4005 | Grounds Maintenance – SEMI- IMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.
| 1 | JOB |
| 4006 | Grounds Maintenance – UNIMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.
| 1 | JOB |
| 4007 | Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B' |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".
| 1 | JOB |
| 4008 | Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the |
attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"
| 1 | JOB | |||
| 4009 | HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J". | 1 | JOB | |
| 4010 | Emergency and special events grass cutting, PWS Section 5.2.11 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 4011 | Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 4012 | Apply Lime (2 TON/AC), PWS Section 5.2.6- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 4013 | Leaf Removal as ordered, PWS Section 5.2.8- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 4014 | Contractor's Manpower Reporting | |||
| JOB |
TOTAL= $ - 0
Option Year V
COST EST.
CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
5001 MOBILIZATION For Option Year V- Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Grounds Maintenance services at FORT NOVOSEL, ALABAMA for the period (INSERT PERFORMANCE PERIOD) in accordance with the Performance Work Statement (PWS) in Section C and Section J. 1 JOB
5002 Grounds Maintenance – IMPROVED GROUNDS "A"
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 5003 | Grounds Maintenance – IMPROVED GROUNDS "B". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 5004 | Grounds Maintenance – IMPROVED GROUNDS "C". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 5005 | Grounds Maintenance – SEMI- IMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.
| 1 | JOB |
| 5006 | Grounds Maintenance – UNIMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.
| 1 | JOB |
| 5007 | Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B' |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".
| 1 | JOB |
| 5008 | Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the |
attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"
| 1 | JOB | |||
| 5009 | HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J". | 1 | JOB | |
| 5010 | Emergency and special events grass cutting, PWS Section 5.2.11- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 5 | JOB | $ - 0 |
| 5011 | Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 5012 | Apply Lime (2 TON/AC), PWS Section 5.2.6- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 5013 | Leaf Removal as ordered, PWS Section 5.2.8- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 5014 | Contractor's Manpower Reporting | |||
| JOB |
TOTAL= $ - 0
Option Year VI
COST EST.
CONTRACT LINE ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
6001 DEMOBILIZATION For Option Year VI- The Contractor shall demobilize as required for the proper performance and completion of the Work, including the removal of all equipment, machinery, and manpower from the site. 1 JOB
6002 Grounds Maintenance – IMPROVED GROUNDS "A"
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 6003 | Grounds Maintenance – IMPROVED GROUNDS "B". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 6004 | Grounds Maintenance – IMPROVED GROUNDS "C". |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Sections 5.2.2 AND Section “J”.
| 1 | JOB |
| 6005 | Grounds Maintenance – SEMI- IMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3 AND Section “J”.
| 1 | JOB |
| 6006 | Grounds Maintenance – UNIMPROVED GROUNDS. |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.4 AND Section “J”.
| 1 | JOB |
| 6007 | Grounds Maintenance – PRUNING SHRUBS IN IMPROVED GROUNDS "A" AND "B' |
Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.2.10 AND Section "J".
| 1 | JOB |
| 6008 | Grounds Maintenance – PRUNING CRAPE MYRTLES IN IMPROVED GROUNDS "A" AND "B' Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision, and all other supplies and services to perform all operations for Grounds Maintenance services in accordance with the terms and conditions of the |
attached Performance Work Statement (PWS) Section 5.2.9 AND Section "J"
| 1 | JOB | |||
| 6009 | HERBICIDE APPLICATION TO RAIL ROAD RIGHTS-OF-WAY Contractor shall furnish all labor, tools, materials, equipment, transportation, supervision and all other supplies and services to perform all operations for Grounds Maintenace services in accordance with the terms and conditions of the attached Performance Work Statement (PWS) Section 5.3.3 AND Section "J". | 1 | JOB | |
| 6010 | Emergency and special events grass cutting, PWS Section 5.2.11- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 6011 | Apply Fertilizer (13-13-13@300 LB/AC), PWS Section 5.2.6 - shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 6012 | Apply Lime (2 TON/AC), PWS Section 5.2.6- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 6013 | Leaf Removal as ordered, PWS Section 5.2.8- shall reflect a unit cost per acre. Amount shall be the unit cost times the total estimated quantity. | 100 | JOB | $ - 0 |
| 6014 | Contractor's Manpower Reporting | |||
| JOB |
TOTAL= $ - 0
File details come from the government source that posted it. Updated .