TE-H-26_RB_robinson_waste and stormwat.pdf

PDF 2 MB Posted

Attached to
Base Operations USAG Stuttgart
Solicitation number
PAN409-26-P-0000027869
Issued by

About this file

This is a master plan and basic information map for waste water and storm drainage lines in the Robinson/Grenadier area. The document is a technical engineering drawing dated April 27, 2006, created in a CAD file format (robinson_waste&stormwat.dgn).

The map displays a comprehensive site plan showing the layout of waste water and storm drainage infrastructure across a residential and commercial development area. The drawing uses color-coded legends to distinguish between different types of utility lines, including sanitary sewer lines (shown in green), storm drainage lines (shown in orange), and other infrastructure elements. The plan includes multiple drainage detention areas represented by green-shaded regions throughout the development, building footprints in yellow and pink, roadway networks, and topographical features. Several data tables are embedded within the map showing detailed drainage calculations and specifications. The scale is indicated as 1:25,000, and the document includes a key map reference in the upper right corner. The drawing also contains standard title block information identifying the project location as Robinson/Grenadier in what appears to be a municipal development area, with notation indicating this is a Department of the Army Corps of Engineers document prepared by a licensed surveyor.

View the file

Other files

File Type Posted
TE A-02_Space Assignment and Equipment.xlsx XLSX spreadsheet
USAG ST BASOPS FY26 Annex F_GROUNDS_10FEB2026_PWS.docx DOCX document
TE-H-26_KELLEY STORM SEWER LINE - KELLEY BKS.- KOERSCH.pdf PDF
TE-H-26_Kelley_3320_Underground_Drainpipe_sep2019.pdf PDF
TE-H-26_Kelley-Entwaesserung Plan-5.PDF PDF
TE-J-05 Annex J Functional Location Reference List.xlsx XLSX spreadsheet
TE-H-26_Kelley-kelhsg2_comb_sew-monochrome.pdf PDF
TE-H-26_PATCH_patchbks1_comb_sew.pdf PDF
TE F-004_Lawn Mowing Area Maps.docx DOCX document
TE-H-26_Kelley-Entwaesserung Plan-3.PDF PDF
TE-H-26_Kelley-kelhsg1_storm_drain-monochrome.pdf PDF
TE A-01 PATCH BARRACKS.pdf PDF
TE-H-26_Kelley-kelhsg1_sanit_sew-monochrome.pdf PDF
TE-H-26_PATCH_General Sanitary Sewer and Storm Drainage Map 1of2 1990.PDF PDF
TE-H-26_Kelley-B-8L002_Weidach_As_built_Kanal_Vorabzug_20201111.pdf PDF
TE A-01 PANZER KASERNE.pdf PDF
TE-H-26_Kelley-Entwaesserung Plan-1.PDF PDF
USAG ST BASOPS FY26 Annex J_HORIZONTAL_10FEB2026_PWS.docx DOCX document
TE A-23_Historical Data - BOM.xlsx XLSX spreadsheet
TE-H-26_PATCH_GE656_02338_39_45_47 Sewer System.PDF PDF
TE C-01_UH Inventory and Space Assignment.xlsx XLSX spreadsheet
TE-H-26_Kelley_Repair Underground Sewage System 1-2.PDF PDF
TE-H-26_Kelley-kelhsg2_sanit_sew-monochrome.pdf PDF
TE A-20_ENV_USAG-ST-INRMP 2019-prefinal.pdf PDF
TE-H-26_Kelley-kelhsg2_storm_drain-monochrome.pdf PDF
TE-H-26_kelleybks_comb_sew - Copy.pdf PDF
TE A-16_Employee Log.xlsx XLSX spreadsheet
TE A-20_ENV_e_Guide to Species Protection during construction_final.pdf PDF
TE-H-26_kelleybks_comb_sew.pdf PDF
TE-H-26_Kelley-kelhsg1_comb_sew-monochrome.pdf PDF
TE-H-26_RB COMB SEWER 1985 1of4.pdf PDF
TE-H-26_PATCH_patchbks1_storm_drain.pdf PDF
USAG ST BASOPS FY26 Annex C_UH_13APR2026_PWS.docx DOCX document
TE-H-26_PATCH_patchbks2_comb_sew.pdf PDF
TE-H-26_RB COMB SEWER 1985 3of4.pdf PDF
TE A-01 ECHTERDINGEN AIRFIELD.pdf PDF
TE A-04_Excavation Clearance Request - Digging Permit-Digging Example.pdf PDF
TE-H-26_kelleybks_comb_sew - black_white.pdf PDF
TE-H-26_Kelley-B-8L002_Koersch_As_built_Kanal_Vorabzug_20201111.pdf PDF
TE F-002_Historical Workload.xlsx XLSX spreadsheet
TE-H-26_RB ABWASSER Bestand Farbe.pdf PDF
TE A-20_ENV_USAG ST HWMP_2024_Signed.pdf PDF
TE I-001_AFH Inventory and Space Assignment.xlsx XLSX spreadsheet
TE-H-26_Kelley-Sewer revision_2016-12-13_wash-rack.pdf PDF
TE-H-26_kelleybks_comb_sew - copy-black-white.pdf PDF
TE-H-26_PATCH_GE_656_Patch Waste Water SYSTEM HP.PDF PDF
TE A-20_ENV_Policy on Lithium Battery Disposal _Signed 21.08.2024.pdf PDF
TE-H-26_Kelley_Repair Underground Sewage System 1-2 compressed.pdf PDF
TE-H-26_Kelley-B-8L001_Koersch_As_built_Kanal_Vorabzug_20201111.pdf PDF
TE-H-26_kelleybks_comb_sew_monochrome.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

...\robinson_waste&stormwat.dgn 4/27/2006 3:04:08 PM

File details come from the government source that posted it. Updated .