TE-H-26_Kelley-Sewer revision_2016-12-13_wash-rack.pdf

PDF 447 KB Posted

Attached to
Base Operations USAG Stuttgart
Solicitation number
PAN409-26-P-0000027869
Issued by

About this file

This document is a technical site plan (Lageplanausschnitt) for the Kelley Barracks sewage system repair project, specifically detailing the wash-rack area layout and drainage infrastructure. The plan was prepared by Ludwig Siegle & Söhne Service GbR, a German civil engineering firm based in Korntal-Münchingen, and is dated December 5, 2016, with a revision date of December 5, 2016. The document is drawn to a scale of 1:250 and uses Allplan 2016 software.

The technical specifications include drainage pipe configurations with various diameters (DN 150, DN 200, DN 250, DN 300) and slope gradients (1%, 10%, 14.9%, 15.0% per mille). The plan shows connection points designated by reference numbers (97-103) with corresponding elevation data (KS and KD measurements). The wash-rack structure is centrally depicted with concrete surface area (Betonfläche) of 3,390 square meters, and includes drainage connections to composite pipe (PP) systems. Multiple catchment basins and junction points are indicated with specific elevation and slope calculations to facilitate proper wastewater flow through the system.

View the file

Other files

File Type Posted
TE A-02_Space Assignment and Equipment.xlsx XLSX spreadsheet
USAG ST BASOPS FY26 Annex F_GROUNDS_10FEB2026_PWS.docx DOCX document
TE-H-26_KELLEY STORM SEWER LINE - KELLEY BKS.- KOERSCH.pdf PDF
TE-H-26_Kelley_3320_Underground_Drainpipe_sep2019.pdf PDF
TE-H-26_Kelley-Entwaesserung Plan-5.PDF PDF
TE-J-05 Annex J Functional Location Reference List.xlsx XLSX spreadsheet
TE-H-26_Kelley-kelhsg2_comb_sew-monochrome.pdf PDF
TE-H-26_PATCH_patchbks1_comb_sew.pdf PDF
TE F-004_Lawn Mowing Area Maps.docx DOCX document
TE-H-26_Kelley-Entwaesserung Plan-3.PDF PDF
TE-H-26_Kelley-kelhsg1_storm_drain-monochrome.pdf PDF
TE A-01 PATCH BARRACKS.pdf PDF
TE-H-26_Kelley-kelhsg1_sanit_sew-monochrome.pdf PDF
TE-H-26_PATCH_General Sanitary Sewer and Storm Drainage Map 1of2 1990.PDF PDF
TE-H-26_Kelley-B-8L002_Weidach_As_built_Kanal_Vorabzug_20201111.pdf PDF
TE A-01 PANZER KASERNE.pdf PDF
TE-H-26_Kelley-Entwaesserung Plan-1.PDF PDF
USAG ST BASOPS FY26 Annex J_HORIZONTAL_10FEB2026_PWS.docx DOCX document
TE A-23_Historical Data - BOM.xlsx XLSX spreadsheet
TE-H-26_PATCH_GE656_02338_39_45_47 Sewer System.PDF PDF
TE-H-26_RB_robinson_waste and stormwat.pdf PDF
TE C-01_UH Inventory and Space Assignment.xlsx XLSX spreadsheet
TE-H-26_Kelley_Repair Underground Sewage System 1-2.PDF PDF
TE-H-26_Kelley-kelhsg2_sanit_sew-monochrome.pdf PDF
TE A-20_ENV_USAG-ST-INRMP 2019-prefinal.pdf PDF
TE-H-26_Kelley-kelhsg2_storm_drain-monochrome.pdf PDF
TE-H-26_kelleybks_comb_sew - Copy.pdf PDF
TE A-16_Employee Log.xlsx XLSX spreadsheet
TE A-20_ENV_e_Guide to Species Protection during construction_final.pdf PDF
TE-H-26_kelleybks_comb_sew.pdf PDF
TE-H-26_Kelley-kelhsg1_comb_sew-monochrome.pdf PDF
TE-H-26_RB COMB SEWER 1985 1of4.pdf PDF
TE-H-26_PATCH_patchbks1_storm_drain.pdf PDF
USAG ST BASOPS FY26 Annex C_UH_13APR2026_PWS.docx DOCX document
TE-H-26_PATCH_patchbks2_comb_sew.pdf PDF
TE-H-26_RB COMB SEWER 1985 3of4.pdf PDF
TE A-01 ECHTERDINGEN AIRFIELD.pdf PDF
TE A-04_Excavation Clearance Request - Digging Permit-Digging Example.pdf PDF
TE-H-26_kelleybks_comb_sew - black_white.pdf PDF
TE-H-26_Kelley-B-8L002_Koersch_As_built_Kanal_Vorabzug_20201111.pdf PDF
TE F-002_Historical Workload.xlsx XLSX spreadsheet
TE-H-26_RB ABWASSER Bestand Farbe.pdf PDF
TE A-20_ENV_USAG ST HWMP_2024_Signed.pdf PDF
TE I-001_AFH Inventory and Space Assignment.xlsx XLSX spreadsheet
TE-H-26_kelleybks_comb_sew - copy-black-white.pdf PDF
TE-H-26_PATCH_GE_656_Patch Waste Water SYSTEM HP.PDF PDF
TE A-20_ENV_Policy on Lithium Battery Disposal _Signed 21.08.2024.pdf PDF
TE-H-26_Kelley_Repair Underground Sewage System 1-2 compressed.pdf PDF
TE-H-26_Kelley-B-8L001_Koersch_As_built_Kanal_Vorabzug_20201111.pdf PDF
TE-H-26_kelleybks_comb_sew_monochrome.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M aschenz. 1.2 h

Betonfläche W aschplatz

S30210 D

N

D 430.55

S 427.52

S30205 D

N

D 430.86

S 427.77

24.97 DN 250 10.0 o/oo PP

R 10615

D N

D

429.55 S 427.85

R 10610

D N

D

430.35 S 428.66

49.36 DN 300 15.0 o/oo PP 54.28 DN 300 14.9 o/oo PP

180.3° 180.3°

127.7°

KD=430,12

KS=428,77

KS=430,14

(RW

) KS=429,31

KS=429,33

1% KG 2000 DN150

10% KG 2000 DN200

1% KG 2000 DN150

KD=430,81

KS=428,27

KD=430,70

KS=428,42

KD=430,81

KS=428,10

97KD=430,81

KS(SW

)=428,01

KS(RW

)=429,61

Maßstab: 1:250 Korntal, 05.12.2016

REVISIONSPLAN

Lageplanausschnitt Wash-Rack Kelley Barracks - Repair Sewage System

Ludwig Siegle & Söhne

Service GbR

(0711) 8 38 54 54 (0711) 83 77 53 Ludwig-Siegle@gmx.de

Str aßen - und Tie anlag serung st altung ienst

Lembergstraße 35 70825 Korntal-Münchingen fbau en entwäsGrundstücks erungsEnt wäss erdntainCo en - und Hof geGart

H/B = 297 / 420 (0.12m²) Allplan 2016

File details come from the government source that posted it. Updated .