TE A-04_Excavation Clearance Request - Digging Permit-Digging Example.pdf
PDF 1 MB Posted
- Attached to
- Base Operations USAG Stuttgart
- Solicitation number
- PAN409-26-P-0000027869
About this file
This is a Contractor's Excavation Permit form used by USAG Stuttgart-DPW in Germany for construction projects requiring ground excavation work. The permit serves as an authorization document and safety protocol to prevent damage to underground utilities and communication lines while conducting excavation activities.
The permit requires contractors to identify the contract/project number, contracting firm name, authorized representative, construction site location, work description, and project dates. Contractors must confirm they have reviewed utility drawings and contacted multiple points of contact including the 52nd Signal Battalion, DPW O&M Utilities Branch (Electrical and Mechanical representatives), and external utility providers (Telekom, TKS, and EnBW). The contractor assumes full responsibility for any damage to utilities or communication lines and accepts that US Forces and the Federal Republic of Germany bear no liability. The permit mandates submission of "as-built" drawings to DPW Master Planning Division within 90 days of project completion and restoration of affected areas to original or better condition. The form requires signatures from the contractor's representative, the COR/Project Manager/Project Inspector, the Chief of Master Planning Division, and the Director of Public Works. The permit includes supplemental parts addressing procedures for reporting unexploded ordnance (with notification priority order), archaeological/historical artifact discovery protocols with Environmental Division contact information, and an equipment operator list documenting all personnel operating excavation equipment, with requirements to update the list and immediately report any utility strikes to the O&M Utilities Branch and Project Manager.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Permit number: ___________ Expiration Date: ____________
Digging Permit Form 17 Mar 2022 fillable
CONTRACTOR’S
EXCAVATION PERMIT
USAG STUTTGART-DPW, GERMANY
CONTRACT/PROJECT NUMBER:
NAME OF CONTRACTING FIRM:
AUTHORIZED CONTRACTOR’S
REPRESENTATIVE (Printed):
CONSTRUCTION SITE:
WORK TO BE PERFORMED:
(Also see attached drawing)
DATES: STARTING: ________________________ ENDING: __________________________
The above named contractor’s representative was informed of the location of all known underground communication lines within the project site by providing him with copies of available drawings. He was given the following name and telephone number to call should a communication line be cut during excavation. (Patch
Barracks, Bldg.2368, Rm 3, phone 0711-680-4080/4300/7139/8557).
n d S
IG
POC: PHONE: 0711-680 - 4080 or 0711-680-4300 or 0711-680-7139 or 0711-680-8557
SIGNATURE: DATE:
DSN: 430-4080 / 4300 / 7139 / 8557
(52ND SIG BN Representative)
A review of the utility drawings was conducted with the contractor’s representative and all known changes were annotated. The following POC’s were provided in case a utility line is damaged. (Kelley Barracks, Bldg. 3318, room 201 and 202 and Patch Barracks, Bldg. 2311, basement).
O
M
-U ti lit ie s B ra n c h
POC:
SIGNATURE: DATE:
PHONE: 09641-70596-6256
or 0711-680-8292 or 0711-680-8294
(DPW-O&M-Utilities Branch, Electrical Representative)
POC:
SIGNATURE: DATE:
PHONE:
09641-70-596-6268 or
09641-70596-6275
(DPW-O&M-Utilities Branch, Mechanical Representative)
1526590780.ln Sticky Note
EN
This is the work order number (DA FORM 4283). The number will be assigned by the project manager or by a designated person from your section/unit/division. He or she must be stationed at USAG Stuttgart.
(Temporarily erected tents do not necessarily require a work order.)
DE
Dies ist die "work order number" (DA FORM 4283). Diese Nummer wird von dem/der Projektmanager/-in, welche/-r aus der US Army Garrison sein muss, vergeben.
(Temporär aufgestellte Zelte bedürfen nicht zwingend einer Work Order.)
1526590780.ln Sticky Note
EN
Name of company/organization/section/unit who is performing the digging.
DE
Name der Firma, Organisation, Abteilung oder Einheit welche die Grabungen durchführt.
1526590780.ln Sticky Note
EN
The POC (Point of Contact) for that company performing the digging.
DE
Vollständiger Name des Ansprechpartners der Firma welche die Grabung durchführt.
1526590780.ln Sticky Note
EN
Where is the work taking place?
e.g. Patch Barracks, near BLDG 2300.
DE
Wo wird gegraben?
Z.B. Patch Barracks, near Bldg. 2300
1526590780.ln Sticky Note
EN
Short explanation of what needs to be done.
(Please attach a sketch)
DE
Kurze Schilderung was gemacht werden muss. Vorzugsweise auf English (eine Lageplanskizze ist beizufügen)
1526590780.ln Sticky Note
EN
When is the start and the approximate finish date of the work?
DE
Wann soll die Arbeit beginnen und wann soll sie voraussichtlich abgeschlossen sein?
1526590780.ln Sticky Note Unmarked set by 1526590780.ln
1526590780.ln Sticky Note
EN
For contact details, see "DP contact list"
DE
Siehe "DP contact list" fuer Kontaktdaten
I certify that I have personally contacted the above US Army personnel and that I am aware of all known on-site utility and communication lines. I certify that I will contact the appropriate POC identified above should there be any damage to a utility or communication line. My firm accepts responsibility for any damage, in accordance with governing statutes and regulations. The US Forces and the Federal Republic of Germany have no liability, financial or otherwise, for damages caused by my firm.
I also understand that the "as-built" drawing must be turned in to DPW Master Planning Division within 90 days after completion of the project.
After the completion of the work the contractor will restore all affected areas to their original or better condition.
Furthermore I have contacted Telekom (06321-455324, Fax 0391-580219745, email:
planauskunft.suedwest@telekom.de ), TKS (0631-3522-265, Fax 0631-3522-113) and EnBW Netzgebiet Stuttgart (0711-289-47962, email: leitungsauskunft-stuttgart@netze-bw.de ) or EnBW Netzgebiet Mitte (0711-289-53650, Fax 07219-142-1369, email: leitungsauskunft-mitte@netze-bw.de ) and am aware of the location of their lines.
SIGNATURE OF CONTRACTOR’S REPRESENTATIVE:
SIGNATURE: DATE:
EMAIL: PHONE:
This excavation work is approved and any excavation may proceed. A copy of this excavation permit will remain on site at all times.
I certify that the excavation work is coordinated with the Installation Coordinator (IC) and the customers which are affected by this particular work.
PRINTED NAME AND SIGNATURE OF COR/ Project Manager/ Project Inspector:
SIGNATURE: DATE:
EMAIL: PHONE:
The above named contractor’s representative was informed of the location of all known underground utility lines within the project site by providing him with copies of available drawings.
With the following signatures the requested digging permit is approved.
SIGNATURE: DATE:
(CHIEF/ Master Planning Division, DPW) PHONE:
09641-70596-6241 DSN:
596-6241
SIGNATURE: DATE:
Director of Public Works / Deputy
Digging Permit Form 17 Mar 2022 fillable mailto:zentrale-planauskunft-Ti-NL-Sw@telekom.de 1526590780.ln Sticky Note
EN
Please note that by signing this permit, you have contacted local utility companies (e.g. EnBW, NetzeBW) and or communication companies (e.g.
Telekom, TKS) and have confirmed the location of their lines. The Stuttgart DPW does not maintain nor possess these plans in their archive.
DE
Bitte beachten Sie, dass Sie mit ihrer Unterschrift auch bestätigen, dass EnBW/NetzeBW, Telekom und TKS kontaktiert wurde. DPW verwaltet oder führt diese Pläne nicht im Archiv, daher müssen diese Informationen gesondert besorgt werden
Unexploded Ordnance Form - May19
Permit number:__________
CONTRACTOR’S
EXCAVATION PERMIT (PART 2)
PROCEDURES IN REPORTING UNEXPLODED ORDNANCE AT THE JOB
SITE
The Contractor is responsible for notifying authorities if unexploded ordnance is found at the job site. All work must ceased and notification process start immediately. The
Contractor will, in order, notify the following Units:
Courtesy Translation:
VERFAHREN BEIM AUFFINDEN SCHARFER MUNITION AUF DER
BAUSTELLE
Der Auftragnehmer ist verantwortlich, beim Auffinden von scharfer Munition die zuständigen Dienststellen zu benachrichtigen. Jegliche Arbeit ist einzustellen und die
Benachrichtigung hat unverzüglich zu erfolgen. Der Auftragnehmer hat folgende
Einheiten, in Reihenfolge, zu benachrichtigen:
1. Military Police @ 09641-70-596-3102 or 3095
2. DPW @ 09641-70-596-6101 + Project Manager
3. Corps Of Engineers @ 0611-9744-2828 or 2916
4. Bauamt @ 0711-21802-800
5. German disposal authorities @ 0711-904-40000 (Kampfmittelbeseitigungsdienst)
6. Safety Office @ 09641-70-596-3832 or 3134
SIGNATURE OF CONTRACTOR ___________________________ DATE _________
1276761419.ln Inserted Text
Permit number: __________
CONTRACTOR’S EXCAVATION PERMIT (PART 3)
Excavation work at USAG Stuttgart –
Archaeological/historical artifacts
Dear Customer, Contractor, If you encounter any archaeological or historical artifact while performing excavation on any area within USAG Stuttgart, especially on potentially undisturbed ground, the ranges and training areas, the artifact needs to be protected and preserved until proper coordination with Host Nation authorities can be initiated and concluded.
You are required to notify POC listed below immediately about the finding and the location for an assessment. Work can only be resumed when authorized by the
Environmental Division.
POC for USAG Stuttgart Environmental Division is Mr. Christoph Leiss, Tel.:
09641-70-596-6133, email: christoph.j.leiss.ln@army.mil.
Alternate POC for USAG Stuttgart Environmental Division is Ms. Anja Emmenecker, Tel: 09641-70-596-6131, email: anja.emmenecker.ln@army.mil.
SIGNATURE OF CONTRACTOR ___________________________ DATE _________
Archaeological Form 7feb2020 mailto:christoph.j.leiss.ln@mail.mil mailto:anja.emmenecker.ln@mail.mil
Equipment Operator Form 2dec2020
Permit number: __________
CONTRACTOR’S EXCAVATION PERMIT (PART 4)
Equipment Operator list
Operator name Operating Equipment Operating license No. Contractor
Operators of Equipment for any excavation/digging have to be listed here.
If there is any change in equipment operators during the duration of this project, I assure that this list will be updated and sent per email to the COR/Project Manager/Project Inspector prior to the operator performing any excavation.
All utility strikes will be immediately reported to the O&M Utilities Branch and the COR/Project
Manager/Project Inspector, to include the name of the operator involved.
SIGNATURE OF CONTRACTOR ___________________________ DATE:_______________
| Text11: DMO 100013917112 | |
| Text12: Centerra Facility Services GmbH | |
| Text13: Mihai Konya | |
| Text14: Bldg. 2534, Patch Barracks | |
| Text15: Digging permit to repair the drainpipe in the ground | |
| Text16: in the back of Bldg. 2534, Patch Barracks. | |
| Text1: 21.11.2024 | |
| Text2: konya.mihaigeza@constellis.com | |
| Text3: 017611774534 | |
| Text5: 25-Nov-2024 | |
| Text6: Thorsten Klotz | |
| Text8: Stefan Longin | |
| Text9: 26-Nov-2024 | |
| Text10: 02-Dec-2024 | |
| Text19: Hanyeong Lee | |
| Text29: 02-Dec-2024 | |
| Text30: 314-596-6272 | |
| Text31: richard.l.thorne4.civ@army.mil | |
| Text32: | |
| Text33: | |
| Text34: | |
| 2024-12-02T13:41:09+0100 | |
| THORNE.RICHARD.LEWIS.1107877211 |
| 017611774534 | |
| 2024-11-22T15:01:21+0100 | |
| Stuttgart | |
| Mihai-Geza Konya | |
| I am the author of this document |
| Signature O&M (mech: | |
| 2024-12-02T08:25:47+0100 | |
| LEE.HANYEONG.1638487795 |
| Signature O&M (elec: | |
| 2024-11-26T09:06:31+0100 | |
| LONGIN.STEFAN.ROMAN.1615250887 |
| 2024-11-25T13:20:51+0100 | |
| KLOTZ.THORSTEN.A.1283023873 |
| Date Start: 25.11.2024 | |
| Date End: 25.02.2025 | |
| 017611774534 | |
| 2024-11-22T15:01:52+0100 | |
| Stuttgart | |
| Mihai-Geza Konya | |
| I am the author of this document |
| 017611774534 | |
| 2024-11-22T15:02:12+0100 | |
| Stuttgart | |
| Mihai-Geza Konya | |
| I am the author of this document |
| Operator nameRow1: Marcel Feucht | |
| Operating EquipmentRow1: Bagger | |
| Operating license NoRow1: | |
| ContractorRow1: MFB | |
| Operator nameRow2: | |
| Operating EquipmentRow2: | |
| Operating license NoRow2: | |
| ContractorRow2: | |
| Operator nameRow3: | |
| Operating EquipmentRow3: | |
| Operating license NoRow3: | |
| ContractorRow3: | |
| Operator nameRow4: | |
| Operating EquipmentRow4: | |
| Operating license NoRow4: | |
| ContractorRow4: | |
| Operator nameRow5: | |
| Operating EquipmentRow5: | |
| Operating license NoRow5: | |
| ContractorRow5: | |
| Operator nameRow6: | |
| Operating EquipmentRow6: | |
| Operating license NoRow6: | |
| ContractorRow6: | |
| Operator nameRow7: | |
| Operating EquipmentRow7: | |
| Operating license NoRow7: | |
| ContractorRow7: | |
| Operator nameRow8: | |
| Operating EquipmentRow8: | |
| Operating license NoRow8: | |
| ContractorRow8: | |
| Operator nameRow9: | |
| Operating EquipmentRow9: | |
| Operating license NoRow9: | |
| ContractorRow9: | |
| Operator nameRow10: | |
| Operating EquipmentRow10: | |
| Operating license NoRow10: | |
| ContractorRow10: | |
| Operator nameRow11: | |
| Operating EquipmentRow11: | |
| Operating license NoRow11: | |
| ContractorRow11: | |
| Operator nameRow12: | |
| Operating EquipmentRow12: | |
| Operating license NoRow12: | |
| ContractorRow12: | |
| Operator nameRow13: | |
| Operating EquipmentRow13: | |
| Operating license NoRow13: | |
| ContractorRow13: | |
| Operator nameRow14: | |
| Operating EquipmentRow14: | |
| Operating license NoRow14: | |
| ContractorRow14: | |
| Operator nameRow15: | |
| Operating EquipmentRow15: | |
| Operating license NoRow15: | |
| ContractorRow15: | |
| Operator nameRow16: | |
| Operating EquipmentRow16: | |
| Operating license NoRow16: | |
| ContractorRow16: | |
| Operator nameRow17: | |
| Operating EquipmentRow17: | |
| Operating license NoRow17: | |
| ContractorRow17: | |
| 017611774534 | |
| 2024-11-22T15:02:35+0100 | |
| Stuttgart | |
| Mihai-Geza Konya | |
| I am the author of this document |
| Permit number: |
| Date8_af_date: 11.25.24 |
| Date9_af_date: 11.21.24 |
| Date10_af_date: 11.21.24 |
File details come from the government source that posted it. Updated .