TE-H-26_PATCH_patchbks1_storm_drain.pdf
PDF 392 KB Posted
- Attached to
- Base Operations USAG Stuttgart
- Solicitation number
- PAN409-26-P-0000027869
About this file
This document is a Master Plan and Storm Drainage Collection System Map for Patch Barracks. The map depicts the entire utility infrastructure layout for the military installation, with a scale of 1:2,500, and includes detailed storm drainage collection systems marked in red, green, and yellow throughout the facility.
The map identifies numerous building structures across the installation (labeled with numbers such as 2330, 2331, 2332, etc.) and illustrates the comprehensive network of underground storm drainage pipes and collection points. The legend indicates various utility designations and infrastructure elements. A location map in the upper right corner provides geographic context showing the installation's position relative to nearby areas including Vaihingen and Bustard. The document includes standard cartographic elements such as coordinate grid lines, scale bars, directional indicators, and a title block crediting the Department of Public Works and the Department of the Army. This technical drawing serves as the baseline infrastructure documentation for storm drainage management and utility planning at Patch Barracks.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .