TE 12- Division 32 - Exterior Improvements.pdf
PDF 823 KB Posted
- Attached to
- Joint Base Lewis McChord Paving IDIQ Federal contract opportunity
- Solicitation number
- W911S8-20-B-0001
About this file
This document is a draft Statement of Work (SOW) for a construction task order contract to be awarded by the Department of the Army Materiel Command Mission and Installation Contracting Command at Joint Base Lewis-McChord. The contract will provide for a variety of construction, removal, replacement, and repair services associated with roadway and airfield projects at JBLM, including subgrade, utilities, shoulders, curbs, gutters, sidewalks and other real property elements. Minor new construction of roads, sidewalks and parking lots may also be included. Work will be conducted through the issuance of multiple firm fixed-price task orders. The Contractor will be responsible for providing all required materials, labor, equipment, tools and transportation to complete each project.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTI ON 32 01 19. 61
SEALI NG OF JOI NTS I N RI GI D PAVEMENT
11/19
PART 1 GENERAL
1. 1 UNI T PRI CES
1. 1. 1 Measurement
Det er mi ne t he quant i t y of each seal i ng i t em t o be pai d f or by act ual measur ement of t he number of l i near f t of i n- pl ace mat er i al t hat has been approved.
1. 1. 2 Payment
Make payment at t he Cont r act uni t bi d pr i ces per l i near f oot f or t he seal i ng i t ems schedul ed. I ncl ude t he cost of l abor , mat er i al s, and t he use of equi pment and t ool s r equi r ed t o compl et e t he wor k i n t he uni t bi d pr i ce.
1. 2 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM C603 ( 2014; R 2019) St andar d Test Met hod f or Ext r usi on Rat e and Appl i cat i on Li f e of El ast omer i c Seal ant s
ASTM C639 ( 2001; R 2011) Rheol ogi cal ( Fl ow) Pr oper t i es of El ast omer i c Seal ant s
ASTM C661 ( 2015) I ndent at i on Har dness of El ast omer i c- Type Seal ant s by Means of a Durometer
ASTM C679 ( 2003; E 2009; R 2009) Tack- Fr ee Ti me of El ast omer i c Seal ant s
ASTM C719 ( 2014; R 2019) St andar d Test Met hod f or Adhesi on and Cohesi on of El ast omer i c Joi nt Seal ant s Under Cycl i c Movement ( Hockman Cycle)
ASTM C792 ( 2004; R 2008) Ef f ect s of Heat Agi ng on Wei ght Loss, Cr acki ng, and Chal k i ng of El ast omer i c Seal ant s
ASTM C793 ( 2005; R 2017) St andar d Test Met hod f or Ef f ect s of Labor at or y Accel er at ed Weat her i ng on El ast omer i c Joi nt Seal ant s
ASTM C920 ( 2018) St andar d Speci f i cat i on f or El ast omer i c Joi nt Seal ant s
SECTI ON 32 01 19. 61 Page 1
ASTM C1016 ( 2014) St andar d Test Met hod f or Det er mi nat i on of Wat er Absor pt i on of Seal ant Backi ng ( Joi nt Fi l l er ) Mat er i al
ASTM C1193 ( 2013) St andar d Gui de f or Use of Joi nt Sealants
ASTM D412 ( 2016) St andar d Test Met hods f or Vul cani zed Rubber and Ther mopl ast i c El ast omer s - Tensi on
ASTM D789 ( 2015) Det er mi nat i on of Rel at i ve Vi scosi t y and Moi st ur e Cont ent of Pol yami de ( PA)
ASTM D903 ( 1998; R 2017) St andar d Test Met hod f or Peel or St r i ppi ng St r engt h of Adhesi ve Bonds
ASTM D5249 ( 2010; R 2016) St andar d Speci f i cat i on f or Backer Mat er i al f or Use wi t h Col d- and Hot - Appl i ed Joi nt Seal ant s i n Por t l and- Cement Concr et e and Asphal t Joi nt s
ASTM D5329 ( 2016) St andar d Test Met hods f or Seal ant s and Fi l l er s, Hot - Appl i ed, f or Joi nt s and Cr acks i n Asphal t Pavement s and Por t l and Cement Concr et e Pavement s
ASTM D5893/ D5893M ( 2016) St andar d Speci f i cat i on f or Col d Appl i ed, Si ngl e Component , Chemi cal l y Cur i ng Si l i cone Joi nt Seal ant f or Por t l and Cement Concr et e Pavement s
ASTM D6690 ( 2015) St andar d Speci f i cat i on f or Joi nt and Cr ack Seal ant s, Hot Appl i ed, f or Concr et e and Asphal t Pavement s
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
COE CRD- C 525 ( 1989) Cor ps of Engi neer s Test Met hod f or Eval uat i on of Hot - Appl i ed Joi nt Seal ant s f or Bubbl i ng Due t o Heat i ng
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 03 Pr oduct Dat a
Sealants
Submi t cat al og cut s, speci f i cat i ons, Saf et y Dat a Sheet s and
SECTI ON 32 01 19. 61 Page 2 ot her i nf or mat i on document i ng conf or mance t o Cont r act r equi r ement s.
Manuf act ur er ' s Recommendat i ons
SD- 04 Sampl es
Sealants
Pr ovi de f or t est i ng a 5- gal sampl e of each seal ant wi t h associ at ed pr i mer t o t he Cont r act i ng Of f i cer a mi ni mum of 60 days pr i or t o i t s use on t he j ob. Pr ovi de f act or y- seal ed cont ai ner s wi t h a f act or y appl i ed l abel showi ng t he f ol l owi ng i nf or mat i on:
Name of seal ant
I dent i f i cat i on of component , or pr i mer
Speci f i cat i on number and t ype
Manuf act ur er ' s name
Manuf act ur er ' s l ot and bat ch number
Dat e of Manuf act ur e ( mont h and year )
Shel f l i f e r et est dat e ( mont h and year )
Li st of hazar dous component s
Quant i t y of mat er i al i n cont ai ner ( vol ume)
St or age i nst r uct i ons
I nst r uct i ons f or use
Bl ocki ng Medi a/ Backup Mat er i al s
Backer Rod
Bond Br eaki ng Tapes
SD- 06 Test Repor t s
Sealants
SD- 07 Cer t i f i cat es
Equi pment Li st
SD- 08 Manuf act ur er ' s I nst r uct i ons
Sealants
Pr ovi de i nst r uct i ons t hat i ncl ude, but not l i mi t ed t o: st or age r equi r ement s, ambi ent t emper at ur e and humi di t y r anges, and moi st ur e condi t i on of j oi nt s f or successf ul i nst al l at i on;
r equi r ement s f or pr epar at i on of j oi nt s; saf e heat i ng t emper at ur e;
mi x i ng i nst r uct i ons; i nst al l at i on equi pment and pr ocedur es;
appl i cat i on and di sposal r equi r ement s; compat i bi l i t y of seal ant
SECTI ON 32 01 19. 61 Page 3 wi t h f i l l er mat er i al ; cur i ng r equi r ement s; and r est r i c t i ons t o be adher ed t o i n or der t o r educe hazar ds t o per sonnel or t o t he envi r onment . Submi t i nst r uct i ons at l east 30 days pr i or t o use.
1. 4 QUALI TY ASSURANCE
1. 4. 1 Test Requi r ement s
Test t he seal ant and backup or separ at i ng mat er i al f or conf or mance wi t h t he r ef er enced mat er i al speci f i cat i on. Per f or m t est i ng of t he mat er i al s i n an appr oved i ndependent l abor at or y and submi t cer t i f i ed copi es of t he t est r epor t s f or appr oval 30 days pr i or t o t he use of t he mat er i al s at t he j ob s i t e. Submi t sampl es t o be r et ai ned by t he Gover nment f or possi bl e f ut ur e t est i ng i f t he mat er i al s appear def ect i ve dur i ng or af t er appl i cat i on.
Conf or mance wi t h t he r equi r ement s of t he l abor at or y t est s speci f i ed does not const i t ut e f i nal accept ance of t he mat er i al s. Base f i nal accept ance on t he per f or mance of t he i n- pl ace mat er i al s. Submi t sampl es of t he mat er i al s ( seal ant , pr i mer i f r equi r ed, and backup mat er i al ) , i n suf f i c i ent quant i t y f or t est i ng and appr oval 30 days pr i or t o t he begi nni ng of wor k. Do not use mat er i al unt i l i t has been appr oved.
1. 4. 2 Tr i al Joi nt Seal ant I nst al l at i on
Pr i or t o c l eani ng and seal i ng t he j oi nt s f or t he ent i r e pr oj ect , pr epar e a t est sect i on at l east 200 f t l ong usi ng t he speci f i ed mat er i al s and appr oved equi pment , so as t o demonst r at e t he pr oposed j oi nt pr epar at i on and seal i ng of t he t ypes of j oi nt s i n t he pr oj ect . Fol l owi ng t he compl et i on of t he t est sect i on and bef or e any ot her j oi nt i s seal ed, i nspect t he t est sect i on t o det er mi ne t hat t he mat er i al s and i nst al l at i on meet t he r equi r ement s speci f i ed. I nspect j oi nt seal t est sect i on. Pr ovi de wr i t t en not i ce of def i c i enci es and r equi r ed cor r ect i ons or adj ust ment s i n t he j oi nt seal i nst al l at i on pr ocedur es. Cor r ect def i c i enci es and obt ai n appr oval of t est sect i on pr i or t o i nst al l i ng j oi nt seal s. I f i t i s det er mi ned t hat t he mat er i al s or i nst al l at i on do not meet t he r equi r ement s, r emove t he mat er i al s, and r ecl ean and r eseal t he j oi nt s at no cost t o t he Gover nment .
Per mi t t he t est sect i on meet i ng t he r equi r ement s t o be i ncor por at ed i nt o t he per manent wor k and pai d f or at t he Cont r act uni t pr i ce per l i near f oot f or seal i ng i t ems schedul ed. Pr epar e and seal ot her j oi nt s i n t he manner appr oved f or seal i ng t he t est sect i on. Not i f y t he Cont r act i ng Of f i cer upon compl et i on of t he t est sect i on.
1. 5 DELI VERY, STORAGE, AND HANDLI NG
I nspect mat er i al s del i ver ed t o t he s i t e f or v i s i bl e damage, and unl oad and st or e wi t h a mi ni mum of handl i ng. Del i ver j oi nt mat er i al s i n or i gi nal seal ed cont ai ner s and pr ot ect f r om f r eezi ng or over heat i ng. Pr ovi de j obsi t e st or age f aci l i t i es capabl e of mai nt ai ni ng t emper at ur e r anges wi t hi n manuf act ur er s r ecommendat i ons.
1. 6 ENVI RONMENTAL REQUI REMENTS
Do not pr oceed wi t h wor k when weat her condi t i ons det r i ment al l y af f ect t he qual i t y of c l eani ng j oi nt s or appl y i ng seal ant s. Pr oceed wi t h j oi nt pr epar at i on and seal i ng onl y when weat her condi t i ons ar e i n accor dance wi t h manuf act ur er ' s i nst r uct i ons. I nst al l j oi nt seal ant t o dr y sur f aces and pr ot ect seal ant and bond br eaker s f r om moi st ur e.
SECTI ON 32 01 19. 61 Page 4
1. 7 TRAFFI C CONTROL
Do not per mi t vehi cul ar or heavy equi pment t r af f i c on t he pavement i n t he ar ea of t he j oi nt s bei ng seal ed dur i ng t he pr ot ect i on and cur i ng per i od of t he seal ant . Per mi t t r af f i c on t he pavement at t he end of t he cur i ng period.
PART 2 PRODUCTS
2. 1 SEALANTS
Use mat er i al s f or seal i ng cr acks i n accor dance wi t h ASTM D6690 and ASTM D5893/ D5893M based on t he t ype of ar ea as f ol l ows:
Area Seal i ng Mat er i al
Ar eas t hat wi l l not r ecei ve f uel spi l l age, engi ne bl ast , or heat , such as r oadways, par ki ng ar eas, cur b, and gut t er
ASTM D6690, Type I I and ASTM D5329/
COE CRD- C 525
Ar eas t hat wi l l not r ecei ve f uel spi l l age, engi ne bl ast , or heat , such as r oadways, par ki ng ar eas, cur b, and gut t er
ASTM D6690, Type I I I and ASTM D5329/
COE CRD- C 525
Ar eas t hat wi l l not r ecei ve f uel spi l l age, engi ne bl ast , or heat , such as r oadways, par ki ng ar eas, cur b, and gut t er
ASTM D5893/ D5893M
Use sel f l evel i ng, non- aci d cur i ng s i l i cone seal ant meet i ng t he f ol l owi ng r equi r ement s i n accor dance wi t h ASTM C920 or ASTM C1193:
TEST TEST METHOD REQUIREMENTS
Wei ght Loss ASTM C792 Modi f i ed ( see Not e 1 bel ow)
10 per cent max.
Flow ASTM C639 ( Type I ) Smoot h and l evel
Ext r usi on Rat e ASTM C603 30 sec. max.
Tack Fr ee Ti me ASTM C679 5 hour s max.
Har dness ( Shor e 00) ( see Not e 2 bel ow)
ASTM C661 30 - 80
Tensi l e St r ess at 150 Per cent El ongat i on ( see Not e 2 bel ow)
ASTM D412 ( Di e C) 30 psi max.
Per cent El ongat i on ( see Not e 2 bel ow)
ASTM D412 ( Di e C) 700 mi n.
SECTI ON 32 01 19. 61 Page 5
TEST TEST METHOD REQUIREMENTS
Accel er at ed Weat her i ng ASTM C793 Pass 5000 hour s
Bond and Movement Capabi l i t y ASTM C719 Pass 10 cycl es at pl us 50 per cent movement ( no adhesi on or cohesi on f ai l ur e)
Peel ASTM D903 Mi ni mum 20 psi of wi dt h wi t h at l east 75 per cent cohesi ve failure
NOTES:
1. Per cent wei ght l oss of wet ( uncur ed) sampl e af t er pl aci ng i n f or ced- dr af t oven mai nt ai ned at 158 degr ees pl us 1 degr ee F f or t wo hour s.
2. Speci men cur ed 21 days at 73 degr ees pl us 1 degr ee F and 50 per cent pl us 5 per cent humidity.
ACCELERATED WEATHERI NG FACTORY TEST REPORT. For t he Accel er at ed Weat her i ng t est , i n l i eu of t est i ng of act ual seal ant t o be used on t he pr oj ect , i t i s per mi t t ed t o submi t a r epor t of a f act or y t est , per f or med wi t hi n t wo year s of Cont r act awar d.
2. 2 PRIMERS
Use pr i mer s i n accor dance wi t h t he r ecommendat i on of t he manuf act ur er .
2. 3 BOND BREAKERS
2. 3. 1 Bl ocki ng Medi a/ Backup Mat er i al s
Pr ovi de backup ( j oi nt f i l l er ) mat er i al t hat i s a compr essi bl e, nonshr i nki ng, nonst ai ni ng, nonabsor bi ng, nonr eact i ve mat er i al wi t h t he seal ant . Use backup mat er i al compl i ant wi t h ASTM D5249. Use mat er i al wi t h a mel t i ng poi nt at l east 5 degr ees F gr eat er t han t he pour i ng t emper at ur e of t he seal ant bei ng used when t est ed i n accor dance wi t h ASTM D789. Use mat er i al wi t h a wat er absor pt i on of not mor e t han 5 per cent of t he sampl e wei ght when t est ed i n accor dance wi t h ASTM C1016. Use backup ( j oi nt f i l l er ) mat er i al t hat i s 25 pl us or mi nus 5 per cent l ar ger i n di amet er t han t he nomi nal wi dt h of t he cr ack. Use bl ocki ng medi a consi st ent wi t h t he seal ant manuf act ur er ' s i nst al l at i on i nst r uct i ons.
2. 3. 2 Bond Br eaki ng Tapes
Pr ovi de a bond br eaki ng t ape or separ at i ng mat er i al t hat i s a f l exi bl e, nonshr i nkabl e, nonabsor bi ng, nonst ai ni ng, and nonr eact i ng adhesi ve- backed t ape. Use mat er i al wi t h a mel t i ng poi nt at l east 5 degr ees F gr eat er t han t he pour i ng t emper at ur e of t he seal ant bei ng used when t est ed i n accor dance with ASTM D789. Use bond br eaker t ape appr oxi mat el y 1/ 8 i n wi der t han t he nomi nal wi dt h of t he j oi nt and t hat does not bond t o t he seal ant . Use bond br eaki ng t ape shal l be consi st ent wi t h t he seal ant manuf act ur er ' s i nst al l at i on i nst r uct i ons.
SECTI ON 32 01 19. 61 Page 6
PART 3 EXECUTI ON
3. 1 EXECUTI NG EQUI PMENT
Submi t equi pment l i s t and descr i pt i on of t he equi pment t o be used and a st at ement f r om t he suppl i er of t he seal ant t hat t he pr oposed equi pment i s accept abl e f or i nst al l i ng t he speci f i ed seal ant . Use equi pment f or heat i ng, mi xi ng, and i nst al l i ng seal s i n accor dance wi t h t he i nst r uct i ons pr ovi ded by t he seal ant manuf act ur er . Pr ovi de equi pment , t ool s, and accessor i es necessar y t o c l ean exi st i ng j oi nt s and i nst al l l i qui d j oi nt seal ant s. Mai nt ai n machi nes, t ool s, and ot her equi pment i n pr oper wor ki ng condi t i on. Submi t a l i s t of pr oposed equi pment t o be used i n per f or mance of const r uct i on wor k i ncl udi ng descr i pt i ve dat a, 30 days pr i or t o use on t he project.
3. 1. 1 Joi nt Cl eani ng Equi pment
3. 1. 1. 1 Tr act or - Mount ed Rout i ng and Pl owi ng Tool
Use r out i ng t ool s f or r emovi ng ol d seal ant f r om t he j oi nt s, of such shape and di mensi ons and so mount ed on t he t r act or t hat do not damage t he s i des of t he j oi nt s. Use t ool s desi gned t o be adj ust ed t o r emove t he ol d mat er i al t o var y i ng dept hs and wi dt hs as r equi r ed. Use equi pment capabl e of mai nt ai ni ng accur at e cut t i ng dept h and wi dt h cont r ol . Use a j oi nt pl ow equi pped wi t h a spr i ng or hydr aul i c mechani sm t o r el ease pr essur e on t he t ool pr i or t o spal l i ng t he concr et e. Do not per mi t t he use of V- shaped t ool s or r ot ar y i mpact r out i ng devi ces. Per mi t t he use of hand- oper at ed spi ndl e r out i ng devi ces t o c l ean and enl ar ge r andom cr acks.
3. 1. 1. 2 Concr et e Saw
Pr ovi de a sel f - pr opel l ed power saw, wi t h wat er - cool ed di amond or abr asi ve saw bl ades, f or cut t i ng j oi nt s t o t he dept hs and wi dt hs speci f i ed, f or r ef aci ng j oi nt s, c l eani ng sawed j oi nt s wher e sandbl ast i ng does not pr ovi de a c l ean j oi nt , wi deni ng, or deepeni ng exi st i ng j oi nt s as speci f i ed wi t hout damagi ng t he s i des, bot t om, or t op edge of j oi nt s. Per mi t s i ngl e or gang t ype bl ades wi t h one or mor e bl ades mount ed i n t andem f or f ast cut t i ng.
Sel ect saw adequat el y power ed and si zed t o cut speci f i ed openi ng wi t h not mor e t han t wo passes of t he saw t hr ough t he j oi nt .
3. 1. 1. 3 Sandbl ast i ng Equi pment
I ncl ude wi t h t he sandbl ast i ng equi pment an ai r compr essor , hose, and l ong- wear i ng vent ur i - t ype nozzl e of pr oper s i ze, shape and openi ng. Do not per mi t t he maxi mum nozzl e openi ng t o exceed 1/ 4 i n. Use a por t abl e ai r compr essor capabl e of pr ovi di ng not l ess t han 150 cf m and mai nt ai ni ng a l i ne pr essur e of not l ess t han 90 psi at t he nozzl e whi l e i n use.
Demonst r at e compr essor capabi l i t y , under j ob condi t i ons, bef or e appr oval .
Use a compr essor equi pped wi t h t r aps t hat mai nt ai n t he compr essed ai r f r ee of oi l and wat er . Use a nozzl e wi t h an adj ust abl e gui de t hat hol ds t he nozzl e al i gned wi t h t he j oi nt appr oxi mat el y 1 i n above t he pavement sur f ace. Adj ust t he hei ght , angl e of i ncl i nat i on and t he s i ze of t he nozzl e t o secur e sat i sf act or y r esul t s.
3. 1. 1. 4 Wat er bl ast i ng Equi pment
I ncl ude wi t h t he wat er bl ast i ng equi pment a t r ai l er - mount ed wat er t ank, pumps, hi gh- pr essur e hose, wand wi t h saf et y r el ease cut of f cont r ol , nozzl e, and auxi l i ar y wat er r esuppl y equi pment . Pr ovi de wat er t ank and auxi l i ar y r esuppl y equi pment of suf f i c i ent capaci t y t o per mi t cont i nuous oper at i ons.
SECTI ON 32 01 19. 61 Page 7
Use a nozzl e wi t h an adj ust abl e gui de t hat hol ds t he nozzl e al i gned wi t h t he j oi nt appr oxi mat el y 1 i n above t he pavement sur f ace. Adj ust t he hei ght , angl e of i ncl i nat i on and t he s i ze of t he nozzl e t o obt ai n sat i sf act or y r esul t s. Use a pr essur e gauge mount ed at t he pump t hat shows t he pr essur e i n psi at whi ch t he equi pment i s oper at i ng.
3. 1. 1. 5 Ai r Compr essor
Use a por t abl e ai r compr essor capabl e of oper at i ng t he sandbl ast i ng equi pment and capabl e of bl owi ng out sand, wat er , dust adher i ng t o s i dewal l s of concr et e, and ot her obj ect i onabl e mat er i al s f r om t he j oi nt s.
Use a compr essor t hat pr ovi des ai r at a pr essur e not l ess t han 90 psi and a mi ni mum r at e of 150 cubi c f t of ai r per mi nut e at t he nozzl es and f r ee of oil.
3. 1. 1. 6 Vacuum Sweeper
Use a sel f - pr opel l ed, vacuum pi ckup sweeper capabl e of compl et el y r emovi ng l oose sand, wat er , j oi nt mat er i al , and debr i s f r om pavement sur f ace.
3. 1. 1. 7 Hand Tool s
Per mi t t he use of hand t ool s, such as br ooms and chi sel s, when appr oved, f or r emovi ng def ect i ve seal ant f r om a cr ack and r epai r i ng or c l eani ng t he cr ack f aces.
3. 1. 2 Seal i ng Equi pment
Use j oi nt seal i ng equi pment of a t ype r equi r ed by t he seal ant manuf act ur er ' s i nst al l at i on i nst r uct i ons. Use equi pment capabl e of i nst al l i ng seal ant t o t he dept hs, wi dt hs and t ol er ances i ndi cat ed. Do not pr oceed wi t h j oi nt seal i ng when mal f unct i ons ar e not ed unt i l t he mal f unct i ons ar e cor r ect ed.
3. 1. 2. 1 Hot - Pour ed Seal i ng Equi pment
Use mobi l e uni t appl i cat or s equi pped wi t h a doubl e- boi l er , agi t at or - t ype ket t l e wi t h an oi l medi um i n t he out er space f or heat t r ansf er f or heat i ng and i nst al l i ng ASTM D6690 j oi nt seal ant mat er i al s; a di r ect - connect ed pr essur e- t ype ext r udi ng devi ce wi t h a nozzl e shaped f or i nser t i ng i n t he j oi nt t o be f i l l ed; posi t i ve t emper at ur e devi ces f or cont r ol l i ng t he t emper at ur e of t he t r ansf er oi l and seal ant ; and a r ecor di ng t her momet er f or i ndi cat i ng t he t emper at ur e of t he seal ant . Use an appl i cat or uni t desi gned so t hat t he seal ant c i r cul at es t hr ough t he del i ver y hose and r et ur ns t o t he i nner ket t l e when not i n use.
3. 1. 2. 2 Col d- Appl i ed, Si ngl e- Component Seal i ng Equi pment
Use equi pment f or i nst al l i ng ASTM D5893/ D5893M si ngl e component j oi nt seal ant s t hat consi st s of an ext r usi on pump, ai r compr essor , f ol l owi ng pl at e, hoses, and nozzl e f or t r ansf er r i ng t he seal ant f r om t he st or age cont ai ner i nt o t he j oi nt openi ng. Use a nozzl e wi t h di mensi ons t hat al l ows t he t i p of t he nozzl e t o ext end i nt o t he j oi nt t o al l ow seal i ng f r om t he bot t om of t he j oi nt t o t he t op. Mai nt ai n t he i ni t i al l y appr oved equi pment i n good wor ki ng condi t i on, ser vi ced i n accor dance wi t h t he suppl i er ' s i nst r uct i ons, and unal t er ed i n any way wi t hout obt ai ni ng pr i or appr oval .
Use l i ned hoses and seal s t o pr event moi st ur e penet r at i on and wi t hst and pumpi ng pr essur es. Use equi pment f r ee of cont ami nat i on f r om pr evi ousl y used or ot her t ype seal ant . Per mi t use of smal l hand- hel d ai r - power ed equi pment
SECTI ON 32 01 19. 61 Page 8
( i . e. , caul k i ng guns) f or smal l appl i cat i ons.
3. 2 SAFETY
Do not pl ace seal ant wi t hi n 25 f t of LOX equi pment , LOX st or age, or LOX pi pi ng. Cl ean j oi nt s i n t hi s ar ea and l eave t hem unseal ed.
I n accor dance wi t h t he pr ovi s i ons of t he Cont r act r espect i ng " Acci dent Pr event i on, " t ake appr opr i at e measur es t o cont r ol wor ker exposur e t o t oxi c subst ances dur i ng t he wor k. Pr ovi de per sonnel pr ot ect i ve equi pment as r equi r ed. Make Mat er i al Saf et y Dat a Sheet s ( Depar t ment of Labor For m OSHA- 20 or compar abl e f or m) avai l abl e on t he s i t e.
Per f or m sandbl ast i ng oper at i ons i n accor dance t o par agr aph ent i t l ed " Abr asi ve Bl ast i ng" of Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS.
3. 3 PREPARATI ON OF JOI NTS
Unl ess ot her wi se i ndi cat ed, r emove exi st i ng mat er i al , saw, c l ean and r eseal j oi nt s. Do not pr oceed wi t h f i nal c l eani ng oper at i ons by mor e t han one wor ki ng day i n advance of seal ant . Cl ean j oi nt s by r emovi ng exi st i ng j oi nt seal i ng compound, bond- br eaker s, di r t , l ai t ance, cur i ng compound, f i l l er , and pr ot r usi ons of har dened concr et e f r om t he s i des and upper edges of t he j oi nt space t o be seal ed and ot her f or ei gn mat er i al wi t h t he equi pment . Do not per mi t c l eani ng pr ocedur es t hat damage j oi nt s or pr evi ousl y r epai r ed pat ches by chi ppi ng or spal l i ng. Remove exi st i ng seal ant t o t he r equi r ed dept h. Pr eci se shape and si ze of exi st i ng j oi nt s var y, and condi t i ons of j oi nt wal l s and edges var y and i ncl ude but ar e not l i mi t ed t o r oundi ng, squar e edges, s l opi ng, chi ps, voi ds, depr essi ons, and pr oj ect i ons.
3. 3. 1 Exi st i ng Seal ant Removal
Cut l oose t he i n- pl ace seal ant f r om bot h j oi nt f aces and t o t he r equi r ed dept h, usi ng t he t r act or - mount ed r out i ng equi pment , concr et e saw, or wat er bl ast er as speci f i ed i n par agr aph EQUI PMENT. The concr et e saw shal l not be used i f i t wi l l wi den t he j oi nt t o a wi dt h gr eat er t han 1 i nch.
Pr ovi de a dept h suf f i c i ent t o accommodat e bl ocki ng medi a and bond br eaker s t hat ar e r equi r ed t o mai nt ai n t he dept h of new seal ant t o be i nst al l ed.
For expansi on j oi nt s, r emove exi st i ng seal ant t o a dept h of not l ess t han t he i ndi cat ed dept h or 1 i n, whi chever i s deeper . When exi st i ng pr ef or med expansi on- j oi nt mat er i al i s mor e t han 1 i n bel ow t he sur f ace of t he pavement , r emove exi st i ng seal ant t o t he t op of t he pr ef or med j oi nt f i l l er . Pr i or t o f ur t her c l eani ng oper at i ons, r emove l oose ol d seal ant r emai ni ng i n t he j oi nt openi ng by bl owi ng wi t h compr essed ai r . Per mi t use of hand t ool s t o r emove seal ant f r om r andom cr acks. Do not per mi t chi ppi ng, spal l i ng, or ot her damage t o t he concr et e. Cl ean pavement sur f ace wi t h vacuum sweeper . Pr ot ect pr evi ousl y c l eaned j oi nt s f r om bei ng cont ami nat ed by subsequent c l eani ng oper at i ons.
3. 3. 2 Sawing
3. 3. 2. 1 Faci ng and Ref aci ng of Joi nt s
Accompl i sh f aci ng and r ef aci ng of j oi nt s usi ng a concr et e saw as speci f i ed i n par agr aph EQUI PMENT t o r emove r esi dual ol d seal ant and a mi ni mum of concr et e f r om t he j oi nt f ace t o pr ovi de exposur e of newl y c l eaned concr et e, and, i f r equi r ed, t o enl ar ge t he j oi nt openi ng t o t he wi dt h and dept h shown on t he dr awi ngs, or t o saw t hr ough sawed and f i l l er - t ype j oi nt s t o l oosen and r emove mat er i al unt i l t he j oi nt i s c l ean and open t o t he f ul l speci f i ed wi dt h and dept h. Pr ovi de exposur e of newl y c l ean concr et e t hr ough
SECTI ON 32 01 19. 61 Page 9 r emoval . Remove bur r s and i r r egul ar i t i es f r om si des of j oi nt f aces.
St i f f en t he bl ade wi t h a suf f i c i ent number of dummy ( used) bl ades or washer s. Cl ean, i mmedi at el y f ol l owi ng t he sawi ng oper at i on, t he j oi nt openi ng usi ng a wat er j et t o r emove saw cut t i ngs and debr i s and adj acent concr et e sur f ace. Pr ot ect adj acent pr evi ousl y c l eaned j oi nt spaces f r om r ecei v i ng wat er and debr i s dur i ng t he c l eani ng oper at i on. The concr et e saw shal l not be used i f i t wi l l wi den t he j oi nt t o a wi dt h gr eat er t han 1 i nch.
a. Joi nt Wi deni ng ( Except Expansi on Joi nt s) : Saw j oi nt s havi ng gr ooves l ess t han 1/ 2 i n wi de and l ess t han 1 i n deep t o a mi ni mum wi dt h of 1/ 2 i n and t o t he mi ni mum dept h of 1 i n or as i ndi cat ed.
3. 3. 2. 2 Ref aci ng of Random Cr acks
Accompl i sh sawi ng of t he cr acks usi ng a power - dr i ven concr et e saw as speci f i ed i n par agr aph EQUI PMENT. Use a saw bl ade 6 i n or l ess i n di amet er t o enabl e t he saw t o f ol l ow t he t r ace of t he cr ack. St i f f en t he bl ade wi t h dummy ( or used) bl ades or washer s. I mmedi at el y f ol l owi ng t he sawi ng oper at i on, c l ean t he cr ack openi ng usi ng a wat er j et t o r emove saw cut t i ngs and debr i s.
3. 3. 3 Fi nal Cl eani ng of Joi nt s
3. 3. 3. 1 Sandbl ast i ng and Wat er bl ast i ng
Fol l owi ng r emoval of exi st i ng seal ant , and sawi ng, and i mmedi at el y bef or e r eseal i ng, c l ean newl y exposed concr et e j oi nt f aces and pavement sur f ace ext endi ng t o a mi mi mum of 1/ 2 i n up t o 2 i n f r om each j oi nt edge by sandbl ast i ng or wat er bl ast i ng unt i l concr et e sur f aces i n t he j oi nt space ar e f r ee of seal ant s, dust , di r t , wat er and ot her f or ei gn mat er i al s t hat pr event bondi ng of new seal ant s t o t he concr et e. Use sand par t i c l es of t he pr oper s i ze and qual i t y f or t he wor k. Per f or m sandbl ast i ng wi t h speci f i ed nozzl es, ai r compr essor , and ot her appur t enant equi pment . Posi t i on nozzl es t o c l ean t he j oi nt f aces. Make at l east t wo passes; one f or each j oi nt f ace. Make as many passes as r equi r ed f or pr oper c l eani ng. I mmedi at el y pr i or t o seal i ng t he j oi nt , bl ow out t he j oi nt spaces wi t h compr essed ai r unt i l compl et el y f r ee of sand, wat er , and dust . I nst al l j oi nt seal ant s t o dr y j oi nt s. Repl ace expansi on j oi nt f i l l er mat er i al damaged i n per f or mi ng t he wor k wi t h new mat er i al s of t he same t ype and di mensi ons as t he exi st i ng mat er i al , or wi t h appr opr i at e bl ocki ng medi a.
3. 3. 4 Bond Br eaker
At t he t i me t he j oi nt s r ecei ve t he f i nal c l eani ng and ar e dr y, i nst al l bond br eaker mat er i al as i ndi cat ed wi t h a st eel wheel or ot her appr oved devi ce.
3. 3. 4. 1 Bl ocki ng Medi a ( Backer Rod) ( Except f or Expansi on Joi nt s)
When t he j oi nt openi ng i s of a gr eat er dept h t han i ndi cat ed f or t he seal ant dept h, pl ug or seal of f t he l ower por t i on of t he j oi nt openi ng usi ng a bl ocki ng medi a/ back- up mat er i al t o pr event t he ent r ance of t he seal ant bel ow t he speci f i ed dept h. Take car e t o ensur e t hat t he bl ocki ng medi a/ backup mat er i al i s pl aced at t he speci f i ed dept h and i s not st r et ched or t wi st ed dur i ng i nst al l at i on.
3. 3. 4. 2 Bond Br eaki ng Tape
Wher e i nser t s or f i l l er mat er i al s cont ai n bi t umen, or t he dept h of t he j oi nt openi ng does not al l ow f or t he use of a backup mat er i al , i nser t a
SECTI ON 32 01 19. 61 Page 10 bond br eaker separ at i ng t ape t o pr event i ncompat i bi l i t y wi t h t he f i l l er mat er i al s and t hr ee- si ded adhesi on of t he seal ant . Bond t he t ape t o t he bot t om of t he j oi nt openi ng t o pr event i t f r om f l oat i ng up i nt o t he new sealant.
3. 3. 5 Rat e of Pr ogr ess of Joi nt Pr epar at i on
Li mi t t he st ages of j oi nt pr epar at i on, i ncl udi ng sandbl ast i ng and wat er bl ast i ng, ai r pr essur e c l eani ng, and pl aci ng of t he back- up mat er i al , t o onl y t hat l i neal f oot age t hat can be seal ed dur i ng t he same day.
3. 3. 6 Di sposal of Debr i s
Sweep pavement sur f ace t o r emove excess j oi nt mat er i al , di r t , wat er , sand, and ot her debr i s by vacuum sweeper s or hand br ooms. Remove t he debr i s i mmedi at el y t o a desi gnat ed ar ea. .
3. 4 PREPARATI ON OF SEALANT
3. 4. 1 Hot - Pour ed Seal ant s
Heat hot - pour ed seal i ng mat er i al s i n accor dance wi t h ASTM D6690 and wi t h saf e heat i ng t emper at ur e r anges r ecommended by t he manuf act ur er . Wi t hdr aw and wast e seal ant t hat has been over heat ed or subj ect ed t o heat i ng f or over 3 hour s or t hat r emai n i n t he appl i cat or at t he end of t he day' s oper at i on. Heat seal ant i n speci f i ed equi pment .
3. 4. 2 Si ngl e- Component , Col d- Appl i ed Seal ant s
I nspect t he ASTM D5893/ D5893M seal ant and cont ai ner s pr i or t o use. Rej ect mat er i al s t hat cont ai n wat er , har d caki ng of any separ at ed const i t uent s, nonr ever si bl e j el l , or mat er i al s t hat ar e ot her wi se unsat i sf act or y. Do not r ej ect seal ant s t hat exhi bi t set t l ement of const i t uent s i n a sof t mass t hat can be r eadi l y and uni f or ml y r emi xed i n t he f i el d wi t h s i mpl e t ool s.
3. 5 I NSTALLATI ON OF SEALANT
3. 5. 1 Ti me of Appl i cat i on
Af t er appr oval of t he t est sect i on, seal j oi nt s i mmedi at el y f ol l owi ng f i nal c l eani ng and pl aci ng of bond br eaker s. Commence seal i ng j oi nt s when wal l s ar e dust f r ee and dr y, and when weat her condi t i ons meet seal ant manuf act ur er ' s i nst r uct i ons. I f t he above condi t i ons cannot be met , or when r ai n i nt er r upt s seal i ng oper at i ons, r ecl ean and per mi t t he j oi nt s t o dr y pr i or t o i nst al l i ng t he seal ant .
3. 5. 2 Seal i ng Joi nt s
Do not i nst al l j oi nt seal ant unt i l j oi nt s t o be seal ed have been i nspect ed and appr oved. I nst al l bond br eaker j ust pr i or t o pour i ng seal ant . Fi l l t he j oi nt s wi t h seal ant f r om bot t om up unt i l j oi nt s ar e uni f or ml y f i l l ed sol i d f r om bot t om t o t op usi ng t he speci f i ed equi pment f or t he t ype of seal ant r equi r ed. Fi l l j oi nt s t o 1/ 8 i n f or ai r f i el d pavement s pl us or mi nus 1/ 16 i n, and 1/ 4 i n f or r oads, st r eet s, and par ki ng l ot s pl us or mi nus 1/ 16 i n, bel ow t op of pavement , and wi t hout f or mat i on of voi ds or ent r apped ai r . For pavement s t hat r ecei ve t r acked vehi c l e t r af f i c , t he seal ant shal l be r ecessed a mi ni mum of 1/ 4 i n bel ow t he pavement sur f ace af t er i t has cur ed or cool ed t o ambi ent t emper at ur e. Do not per mi t gr avi t y met hods or pour i ng pot s t o be used t o i nst al l t he seal ant mat er i al . Except
SECTI ON 32 01 19. 61 Page 11 as ot her wi se per mi t t ed, t ool t he seal ant i mmedi at el y af t er appl i cat i on t o pr ovi de f i r m cont act wi t h t he j oi nt wal l s and t o f or m t he i ndi cat ed seal ant pr of i l e bel ow t he pavement sur f ace. Remove excess seal ant t hat has been i nadver t ent l y spi l l ed on t he pavement sur f ace. Do not per mi t t r af f i c over newl y seal ed pavement unt i l aut hor i zed. When a pr i mer i s r ecommended by t he manuf act ur er , appl y i t evenl y t o t he j oi nt f aces i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons. Check seal ed j oi nt s f r equent l y t o ensur e t hat newl y i nst al l ed seal ant i s cur ed t o a t ack- f r ee condi t i on wi t hi n t he speci f i ed t i me. Pr ot ect new seal ant f r om r ai n dur i ng cur i ng per i od.
3. 6 I NSPECTI ON/ FI ELD QUALI TY CONTROL
3. 6. 1 Joi nt Cl eani ng
I nspect j oi nt s dur i ng t he c l eani ng pr ocess t o cor r ect i mpr oper equi pment and cl eani ng t echni ques t hat damage t he concr et e pavement i n any manner .
Appr ove cl eaned j oi nt s pr i or t o i nst al l at i on of t he separ at i ng or back- up mat er i al and j oi nt seal ant .
3. 6. 2 Sampl i ng Seal ant
Obt ai n a one gal sampl e of each t ype of seal ant on t he pr oj ect f r om mat er i al used f or each 10, 000 l i near f t or l ess of j oi nt s seal ed. St or e sampl es accor di ng t o seal ant manuf act ur er ' s i nst r uct i ons. Ret ai n sampl es unt i l f i nal accept ance of t he wor k.
3. 6. 3 Seal ant Appl i cat i on Equi pment
I nspect t he appl i cat i on equi pment t o ensur e conf or mance t o t emper at ur e r equi r ement s, pr oper pr opor t i oni ng and mi xi ng ( i f t wo- component seal ant ) and pr oper i nst al l at i on. Suspend oper at i ons i f t her e i s evi dences of bubbl i ng, i mpr oper i nst al l at i on, or f ai l ur e t o cur e or set unt i l causes of t he def i c i enci es ar e det er mi ned and cor r ect ed.
3. 6. 4 Joi nt Seal ant
I nspect t he j oi nt seal ant f or pr oper r at e of cur e and set , bondi ng t o t he j oi nt wal l s, cohesi ve separ at i on wi t hi n t he seal ant , r ever si on t o l i qui d, ent r apped ai r and voi ds. Remove seal ant s exhi bi t i ng t hese def i c i enci es pr i or t o t he f i nal accept ance of t he pr oj ect f r om t he j oi nt , wast ed, and r epl ace at no addi t i onal cost t o t he Gover nment . Obt ai n appr oval f or each j oi nt seal i nst al l at i on.
3. 7 ACCEPTANCE
Rej ect seal er t hat f ai l s t o cur e pr oper l y, or f ai l s t o bond t o j oi nt wal l s, or r ever t s t o t he uncur ed st at e, or f ai l s i n cohesi on, or shows excessi ve ai r voi ds, bl i s t er s, sur f ace def ect s, swel l i ng, or ot her def i c i enci es, or i s not pr oper l y r ecessed wi t hi n i ndi cat ed t ol er ances. Remove r ej ect ed seal er and r ecl ean and r eseal j oi nt s. Per f or m r emoval and r eseal wor k pr ompt l y by and at t he expense of t he Cont r act or .
3. 8 CLEAN-UP
Upon compl et i on of t he pr oj ect , r emove unused mat er i al s f r om t he s i t e and l eave t he pavement i n a c l ean condi t i on.
- - End of Sect i on - -
SECTI ON 32 01 19. 61 Page 12
SECTI ON 32 01 19
FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D PAVEMENTS
08/08
PART 1 GENERAL
1. 1 UNI T PRI CES
1. 1. 1 Measurement
Det er mi ne t he quant i t y of each seal i ng i t em t o be pai d f or by act ual measur ement of t he number of l i near f eet of i n- pl ace mat er i al t hat has been appr oved by t he Cont r act i ng Of f i cer .
1. 1. 2 Payment
Payment wi l l be made at t he cont r act uni t bi d pr i ces per l i near f oot f or t he seal i ng i t ems schedul ed. The uni t bi d pr i ces wi l l i nc l ude t he cost of al l l abor , mat er i al s, and t he use of al l equi pment and t ool s r equi r ed t o compl et e t he wor k.
1. 2 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM C1016 ( 2014) St andar d Test Met hod f or Det er mi nat i on of Wat er Absor pt i on of Seal ant Backi ng ( Joi nt Fi l l er ) Mat er i al
ASTM D789 ( 2015) Det er mi nat i on of Rel at i ve Vi scosi t y and Moi st ur e Cont ent of Pol yami de ( PA)
ASTM D5893/ D5893M ( 2016) St andar d Speci f i cat i on f or Col d Appl i ed, Si ngl e Component , Chemi cal l y Cur i ng Si l i cone Joi nt Seal ant f or Por t l and Cement Concr et e Pavement s
ASTM D6690 ( 2015) St andar d Speci f i cat i on f or Joi nt and Cr ack Seal ant s, Hot Appl i ed, f or Concr et e and Asphal t Pavement s
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
COE CRD- C 525 ( 1989) Cor ps of Engi neer s Test Met hod f or Eval uat i on of Hot - Appl i ed Joi nt Seal ant s f or Bubbl i ng Due t o Heat i ng
U. S. GENERAL SERVI CES ADMI NI STRATI ON ( GSA)
FS SS- S- 200 ( Rev E; Am 1; Not i ce 1) Seal ant , Joi nt , Two- Component , Jet - Bl ast - Resi st ant , Col d- Appl i ed, f or Por t l and Cement Concr et e
SECTI ON 32 01 19 Page 1
Pavement
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 03 Pr oduct Dat a
Manuf act ur er ' s Recommendat i ons; G.
Equipment.
SD- 04 Sampl es
Mat er i al s; G.
SD- 06 Test Repor t s
Cer t i f i ed Copi es of t he Test Repor t s; G.
1. 4 QUALI TY ASSURANCE
1. 4. 1 Test Requi r ement s
Test t he j oi nt seal ant and backup or separ at i ng mat er i al f or conf or mance wi t h t he r ef er enced appl i cabl e mat er i al speci f i cat i on. Per f or m t est i ng of t he mat er i al s i n an appr oved i ndependent l abor at or y and submi t cer t i f i ed copi es of t he t est r epor t s f or appr oval 30 days pr i or t o t he use of t he mat er i al s at t he j ob s i t e. Sampl es wi l l be r et ai ned by t he Gover nment f or possi bl e f ut ur e t est i ng shoul d t he mat er i al s appear def ect i ve dur i ng or af t er appl i cat i on. Conf or mance wi t h t he r equi r ement s of t he l abor at or y t est s speci f i ed wi l l not const i t ut e f i nal accept ance of t he mat er i al s.
Fi nal accept ance wi l l be based on t he per f or mance of t he i n- pl ace mat er i al s.
Submi t sampl es of t he mat er i al s ( seal ant , pr i mer i f r equi r ed, and backup mat er i al ) , i n suf f i c i ent quant i t y f or t est i ng and appr oval 30 days pr i or t o t he begi nni ng of wor k. No mat er i al wi l l be al l owed t o be used unt i l i t has been appr oved.
1. 4. 2 Tr i al Joi nt Seal ant I nst al l at i on
Pr i or t o t he c l eani ng and seal i ng of t he j oi nt s f or t he ent i r e pr oj ect , pr epar e a t est sect i on at l east 200 f eet l ong usi ng t he speci f i ed mat er i al s and appr oved equi pment , so as t o demonst r at e t he pr oposed j oi nt pr epar at i on and seal i ng of al l t ypes of j oi nt s i n t he pr oj ect . Fol l owi ng t he compl et i on of t he t est sect i on and bef or e any ot her j oi nt i s seal ed, i nspect t he t est sect i on t o det er mi ne t hat t he mat er i al s and i nst al l at i on meet t he r equi r ement s speci f i ed. I f i t i s det er mi ned t hat t he mat er i al s or i nst al l at i on do not meet t he r equi r ement s, r emove t he mat er i al s, and r ecl ean and r eseal t he j oi nt s at no cost t o t he Gover nment . When t he t est sect i on meet s t he r equi r ement s, i t may be i ncor por at ed i nt o t he per manent wor k and pai d f or at t he cont r act uni t pr i ce per l i near f oot f or seal i ng i t ems schedul ed. Pr epar e and seal al l ot her j oi nt s i n t he manner appr oved f or seal i ng t he t est sect i on.
SECTI ON 32 01 19 Page 2
1. 5 DELI VERY, STORAGE, AND HANDLI NG
I nspect mat er i al s del i ver ed t o t he j ob s i t e f or def ect s, unl oad, and st or e t hem wi t h a mi ni mum of handl i ng t o avoi d damage. Pr ovi de st or age f aci l i t i es at t he j ob s i t e f or mai nt ai ni ng mat er i al s at t he t emper at ur es and condi t i ons r ecommended by t he manuf act ur er .
1. 6 ENVI RONMENTAL REQUI REMENTS
The ambi ent ai r t emper at ur e and t he pavement t emper at ur e wi t hi n t he j oi nt wal l shal l be a mi ni mum of 50 degr ees F and r i s i ng at t he t i me of appl i cat i on of t he mat er i al s. Do not appl y seal ant i f moi st ur e i s obser ved i n t he j oi nt .
PART 2 PRODUCTS
2. 1 SEALANTS
Mat er i al s f or seal i ng cr acks i n t he var i ous paved ar eas i ndi cat ed on t he dr awi ngs shal l be as f ol l ows:
Area Seal i ng Mat er i al
Ar eas t hat wi l l not r ecei ve f uel spi l l age, engi ne bl ast , or heat , such as r oadways, par ki ng ar eas, cur b, and gut t er
ASTM D6690, Type I I and COE CRD- C 525
Ar eas t hat wi l l not r ecei ve f uel spi l l age, engi ne bl ast , or heat , such as r oadways, par ki ng ar eas, cur b, and gut t er
ASTM D6690, Type I I I and COE CRD- C 525
Ar eas t hat wi l l r ecei ve f uel spi l l age, heat , or engi ne bl ast
FS SS- S- 200 Type M and COE CRD- C 525
Ar eas t hat wi l l r ecei ve f uel spi l l age, heat , or engi ne bl ast
FS SS- S- 200 Type H and COE CRD- C 525
Ar eas t hat wi l l not r ecei ve f uel spi l l age, engi ne bl ast , or heat , such as r oadways, par ki ng ar eas, cur b, and gut t er
ASTM D5893/ D5893M
2. 2 PRIMERS
When pr i mer s ar e r ecommended by t he manuf act ur er of t he seal ant , use t hem i n accor dance wi t h t he r ecommendat i on of t he manuf act ur er .
2. 3 BACKUP MATERI ALS
Pr ovi de backup mat er i al t hat i s a compr essi bl e, nonshr i nki ng, nonst ai ni ng, nonabsor bi ng mat er i al , nonr eact i ve wi t h t he j oi nt seal ant . The mat er i al shal l have a mel t i ng poi nt at l east 5 degr ees F gr eat er t han t he pour i ng t emper at ur e of t he seal ant bei ng used when t est ed i n accor dance wi t h ASTM D789. The mat er i al shal l have a wat er absor pt i on of not mor e t han 5
SECTI ON 32 01 19 Page 3 per cent of t he sampl e wei ght when t est ed i n accor dance wi t h ASTM C1016.
Use backup mat er i al t hat i s 25 pl us or mi nus 5 per cent l ar ger i n di amet er t han t he nomi nal wi dt h of t he cr ack.
2. 4 BOND BREAKI NG TAPES
Pr ovi de a bond br eaki ng t ape or separ at i ng mat er i al t hat i s a f l exi bl e, nonshr i nkabl e, nonabsor bi ng, nonst ai ni ng, and nonr eact i ng adhesi ve- backed t ape. The mat er i al shal l have a mel t i ng poi nt at l east 5 degr ees F gr eat er t han t he pour i ng t emper at ur e of t he seal ant bei ng used when t est ed i n accor dance wi t h ASTM D789. The bond br eaker t ape shal l be appr oxi mat el y 1/ 8 i nch wi der t han t he nomi nal wi dt h of t he j oi nt and shal l not bond t o t he j oi nt seal ant .
PART 3 EXECUTI ON
3. 1 EXECUTI NG EQUI PMENT
Machi nes, t ool s, and equi pment used i n t he per f or mance of t he wor k r equi r ed by t hi s sect i on shal l be appr oved bef or e t he wor k i s st ar t ed mai nt ai ned i n sat i sf act or y condi t i on at al l t i mes. Submi t a l i s t of pr oposed equi pment t o be used i n per f or mance of const r uct i on wor k i nc l udi ng descr i pt i ve dat a, 30 days pr i or t o use on t he pr oj ect .
3. 1. 1 Joi nt Cl eani ng Equi pment
3. 1. 1. 1 Tr act or - Mount ed Rout i ng Tool
Pr ovi de a r out i ng t ool , used f or r emovi ng ol d seal ant f r om t he j oi nt s, of such shape and di mensi ons and so mount ed on t he t r act or t hat i t wi l l not damage t he s i des of t he j oi nt s. The t ool shal l be desi gned so t hat i t can be adj ust ed t o r emove t he ol d mat er i al t o var yi ng dept hs as r equi r ed. The use of V- shaped t ool s or r ot ar y i mpact r out i ng devi ces wi l l not be per mi t t ed. Hand- oper at ed spi ndl e r out i ng devi ces may be used t o c l ean and enl ar ge r andom cr acks.
3. 1. 1. 2 Concr et e Saw
Pr ovi de a sel f - pr opel l ed power saw, wi t h wat er - cool ed di amond or abr asi ve saw bl ades, f or cut t i ng j oi nt s t o t he dept hs and wi dt hs speci f i ed or f or r ef aci ng j oi nt s or c l eani ng sawed j oi nt s wher e sandbl ast i ng does not pr ovi de a c l ean j oi nt .
3. 1. 1. 3 Sandbl ast i ng Equi pment
I ncl ude wi t h t he sandbl ast i ng equi pment an ai r compr essor , hose, and l ong- wear i ng vent ur i - t ype nozzl e of pr oper s i ze, shape and openi ng. The maxi mum nozzl e openi ng shoul d not exceed 1/ 4 i nch. The ai r compr essor shal l be por t abl e and capabl e of f ur ni shi ng not l ess t han 150 cf m and mai nt ai ni ng a l i ne pr essur e of not l ess t han 90 psi at t he nozzl e whi l e i n use. Demonst r at e compr essor capabi l i t y , under j ob condi t i ons, bef or e appr oval . The compr essor shal l be equi pped wi t h t r aps t hat wi l l mai nt ai n t he compr essed ai r f r ee of oi l and wat er . The nozzl e shal l have an adj ust abl e gui de t hat wi l l hol d t he nozzl e al i gned wi t h t he j oi nt appr oxi mat el y 1 i nch above t he pavement sur f ace. Adj ust t he hei ght , angl e of i ncl i nat i on and t he s i ze of t he nozzl e as necessar y t o secur e sat i sf act or y r esul t s.
SECTI ON 32 01 19 Page 4
3. 1. 1. 4 Wat er bl ast i ng Equi pment
I ncl ude wi t h t he wat er bl ast i ng equi pment a t r ai l er - mount ed wat er t ank, pumps, hi gh- pr essur e hose, wand wi t h saf et y r el ease cut of f cont r ol , nozzl e, and auxi l i ar y wat er r esuppl y equi pment . Pr ovi de wat er t ank and auxi l i ar y r esuppl y equi pment of suf f i c i ent capaci t y t o per mi t cont i nuous oper at i ons.
The nozzl e shal l have an adj ust abl e gui de t hat wi l l hol d t he nozzl e al i gned wi t h t he j oi nt appr oxi mat el y 1 i nch above t he pavement sur f ace. Adj ust t he hei ght , angl e of i ncl i nat i on and t he s i ze of t he nozzl e as necessar y t o obt ai n sat i sf act or y r esul t s. A pr essur e gauge mount ed at t he pump shal l show at al l t i mes t he pr essur e i n psi at whi ch t he equi pment i s oper at i ng.
3. 1. 1. 5 Hand Tool s
Hand t ool s may be used, when appr oved, f or r emovi ng def ect i ve seal ant f r om a cr ack and r epai r i ng or c l eani ng t he cr ack f aces.
3. 1. 2 Seal i ng Equi pment
3. 1. 2. 1 Hot - Pour ed Seal i ng Equi pment
The uni t appl i cat or s used f or heat i ng and i nst al l i ng ASTM D6690 j oi nt seal ant mat er i al s shal l be mobi l e and shal l be equi pped wi t h a doubl e- boi l er , agi t at or - t ype ket t l e wi t h an oi l medi um i n t he out er space f or heat t r ansf er ; a di r ect - connect ed pr essur e- t ype ext r udi ng devi ce wi t h a nozzl e shaped f or i nser t i ng i n t he j oi nt t o be f i l l ed; posi t i ve t emper at ur e devi ces f or cont r ol l i ng t he t emper at ur e of t he t r ansf er oi l and seal ant ;
and a r ecor di ng t ype t her momet er f or i ndi cat i ng t he t emper at ur e of t he seal ant . The appl i cat or uni t shal l be desi gned so t hat t he seal ant wi l l c i r cul at e t hr ough t he del i ver y hose and r et ur n t o t he i nner ket t l e when not i n use.
3. 1. 2. 2 Two- Component , Col d- Appl i ed, Machi ne Mi x Seal i ng Equi pment
Pr ovi de equi pment used f or pr opor t i oni ng, mi xi ng, and i nst al l i ng FS SS- S- 200 Type M j oi nt seal ant s desi gned t o del i ver t wo semi f l ui d component s t hr ough hoses t o a por t abl e mi xer at a pr eset r at i o of 1 t o 1 by vol ume usi ng pumps wi t h an accur acy of pl us or mi nus 5 per cent f or t he quant i t y of each component . The r eser voi r f or each component shal l be equi pped wi t h mechani cal agi t at i on devi ces t hat wi l l mai nt ai n t he component s i n a uni f or m condi t i on wi t hout ent r appi ng ai r . I ncor por at e pr ovi s i ons t o per mi t t her most at i cal l y cont r ol l ed i ndi r ect heat i ng of t he component s, when r equi r ed. However , i mmedi at el y pr i or t o pr opor t i oni ng and mi xi ng, t he t emper at ur e of ei t her component shal l not exceed 90 degr ees F. Pr ovi de scr eens near t he t op of each r eser voi r t o r emove any f or ei gn par t i c l es or par t i al l y pol ymer i zed mat er i al t hat coul d c l og f l ui d l i nes or ot her wi se cause mi spr opor t i oni ng or i mpr oper mi xi ng of t he t wo component s. Pr ovi de equi pment capabl e of t hor oughl y mi xi ng t he t wo component s t hr ough a r ange of appl i cat i on r at es of 10 t o 60 gal l ons per hour and t hr ough a r ange of appl i cat i on pr essur es f r om 50 t o 1500 psi as r equi r ed by mat er i al , c l i mat i c, or oper at i ng condi t i ons. Desi gn t he mi xer f or t he easy r emoval of t he suppl y l i nes f or c l eani ng and pr opor t i oni ng of t he component s. The mi xi ng head shal l accommodat e nozzl es of di f f er ent t ypes and si zes as may be r equi r ed by var i ous oper at i ons. The di mensi ons of t he nozzl e shal l be such t hat t he nozzl e t i p wi l l ext end i nt o t he j oi nt t o al l ow seal i ng f r om t he bot t om of t he j oi nt t o t he t op. Mai nt ai n t he i ni t i al l y appr oved equi pment i n good wor ki ng condi t i on, ser vi ced i n accor dance wi t h t he suppl i er ' s i nst r uct i ons, and unal t er ed i n any way wi t hout obt ai ni ng pr i or approval.
SECTI ON 32 01 19 Page 5
3. 1. 2. 3 Two- Component , Col d- Appl i ed, Hand- Mi x Seal i ng Equi pment
Mi xi ng equi pment f or FS SS- S- 200 Type H seal ant s shal l consi st of a s l ow- speed el ect r i c dr i l l or ai r - dr i ven mi xer wi t h a st i r r er i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .