This document is an architectural floor plan set depicting the phased demolition and renovation of a multi-level building structure. The plan identifies five distinct phases of work, color-coded for visual clarity. Phase 1 (orange) involves roof work including dismantling, removal of sandbags, structural wall removal, and crane setup. Phase 2 (yellow) requires HVAC removal from Level 02. Phase 3 (magenta) entails platform removal from Level 02. Phase 4 (red) specifies HVAC and support container removal. Phase 5 (dark red) covers columns and stair platform removal. A pre-work phase (lime green) documents activities and removal of items furnished by USDI/Contractor, indicating items are to be removed prior to formal demolition commencement.

The plans present detailed floor layouts across multiple levels, with room-by-room breakdowns marked with reference symbols and corresponding notations. The architectural documentation includes both roof plans and multiple floor level plans, showing structural elements, mechanical systems, and spatial configurations. The document is marked "UNCLASSIFIED" and "SENSITIVE BUT UNCLASSIFIED," suggesting federal facility involvement. This appears to be contract documentation for a comprehensive building demolition and renovation project requiring phased execution with specific sequencing of structural, mechanical, and platform removal activities.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ShahSH1 Image

ShahSH1 Snapshot

ShahSH1 Rectangle

ShahSH1 Snapshot

ShahSH1 Rectangle

ShahSH1 Rectangle

ShahSH1 Rectangle

ShahSH1 Rectangle

ShahSH1 Rectangle

ShahSH1 Snapshot

ShahSH1 Rectangle

ShahSH1 Polygon

ShahSH1 Rectangle

ShahSH1 Rectangle

ShahSH1 Rectangle

ShahSH1 Polygon

ShahSH1 Rectangle

ShahSH1 Rectangle

ShahSH1 Text Box

PHASE 1:

Roof Works- Dismantling of Roof, Removal of Sandbags, Removal of corrugated sheet, Tee Wall Removal, Crane Setup

ShahSH1 Text Box

PHASE 2:

HATS Removal from Level-02

ShahSH1 Text Box

PHASE 3:

Platform removal from Level-02

ShahSH1 Text Box

PHASE 4:

HATS and Support Container Removal from Level-01

ShahSH1 Text Box

PHASE 5:

Columns and Stair platform removal

ShahSH1 Text Box PRE-WORK ACTIVITIES - Removal of Items furnished by USG/Contractor.