TAB 1 - HATS Sequencing Plan.pdf
PDF 891 KB Posted
- Attached to
- Peshawar Existing Consulate Compound HATS Relocation Federal contract opportunity
- Solicitation number
- 19GE5026Q0143
About this file
This document is an architectural floor plan set depicting the phased demolition and renovation of a multi-level building structure. The plan identifies five distinct phases of work, color-coded for visual clarity. Phase 1 (orange) involves roof work including dismantling, removal of sandbags, structural wall removal, and crane setup. Phase 2 (yellow) requires HVAC removal from Level 02. Phase 3 (magenta) entails platform removal from Level 02. Phase 4 (red) specifies HVAC and support container removal. Phase 5 (dark red) covers columns and stair platform removal. A pre-work phase (lime green) documents activities and removal of items furnished by USDI/Contractor, indicating items are to be removed prior to formal demolition commencement.
The plans present detailed floor layouts across multiple levels, with room-by-room breakdowns marked with reference symbols and corresponding notations. The architectural documentation includes both roof plans and multiple floor level plans, showing structural elements, mechanical systems, and spatial configurations. The document is marked "UNCLASSIFIED" and "SENSITIVE BUT UNCLASSIFIED," suggesting federal facility involvement. This appears to be contract documentation for a comprehensive building demolition and renovation project requiring phased execution with specific sequencing of structural, mechanical, and platform removal activities.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ShahSH1 Image
ShahSH1 Snapshot
ShahSH1 Rectangle
ShahSH1 Snapshot
ShahSH1 Rectangle
ShahSH1 Rectangle
ShahSH1 Rectangle
ShahSH1 Rectangle
ShahSH1 Rectangle
ShahSH1 Snapshot
ShahSH1 Rectangle
ShahSH1 Polygon
ShahSH1 Rectangle
ShahSH1 Rectangle
ShahSH1 Rectangle
ShahSH1 Polygon
ShahSH1 Rectangle
ShahSH1 Rectangle
ShahSH1 Text Box
PHASE 1:
Roof Works- Dismantling of Roof, Removal of Sandbags, Removal of corrugated sheet, Tee Wall Removal, Crane Setup
ShahSH1 Text Box
PHASE 2:
HATS Removal from Level-02
ShahSH1 Text Box
PHASE 3:
Platform removal from Level-02
ShahSH1 Text Box
PHASE 4:
HATS and Support Container Removal from Level-01
ShahSH1 Text Box
PHASE 5:
Columns and Stair platform removal
ShahSH1 Text Box PRE-WORK ACTIVITIES - Removal of Items furnished by USG/Contractor.