Supplemental Schedule of Unit Prices Lost Canyon Ranch Entry Road and Parking.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Lost Canyon Ranch Open Space Roadway Maintenance and Parking Lots
Solicitation number
2025-01
Issued by
Douglas County, Colorado

About this file

The document is a Supplemental Schedule of Unit Prices for the Lost Canyon Ranch Entry Road and Parking project, issued by the Town of the state of Colorado. The project involves roadway maintenance improvements to an existing dirt road and construction of a trailhead parking lot, including grading, class 6 roadbase installation, retaining walls, drainage improvements, concrete walks, and stairs. The unit price schedule provides comprehensive pricing for various construction elements such as earthwork, concrete work, culvert installations, erosion control, and additional alternates like trail maintenance access routes and a second gravel parking lot.

The unit price schedule is structured to allow for additions and deletions of bid items by the owner, with unit costs applicable to quantity changes of 25% or less. The contractor is responsible for determining quantities and completing all items shown on plans and specifications. The bid is to be submitted as a lump sum, with detailed unit costs provided for each construction element, including excavation, roadbase placement, wall installations, concrete work, drainage infrastructure, and erosion control measures. The schedule includes pricing for standard construction items like concrete sidewalks, ADA parking features, curbing, stair railings, and supplemental elements such as riprap, sediment control, and landscape restoration.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supplemental Unit Costs

Contractor:________________________________________________________________
These unit prices are for addition and deletion of bid items by the Owner. The Unit Cost is to be for each item installed and completely finished. Contactor shall determine their own quantities. These items listed are not to be construed as all inclusive. Any item not included should be added and described under Additional Items. Contractor is responsible for all items shown on plans and described in the specifications. The bid is to be lump sum. Unit Costs are to be used for quantity changes of 25% or less.
ITEMUNITUNIT COST
Base Bid:
Earthwork Grading and PlacementCY$
Cut Material (Export Offsite)CY$
6" Class 6 Roadbase PlacementCY$
Keystone Compac (or equal) MSE WallSF$
Keystone Legacy Stone - Hewnstone (or equal) Wall (Parking Lot)SF$
Concrete Stairs (Structural Concrete)CY$
6" Concrete SidewalkSY$
8" Concrete ADA Parking Pad with StripingSY$
ADA Curb Ramp with Cast Iron Detectable Warning DomesLF$
24" Wide, 6" high Curb and GutterLF$
Stair RailingLF$
ADA Parking SignsEA$
18" CMPLF$
48" CMPLF$
18" CMP FESEA$
48" CMP FESEA$
Type L Riprap (Check Dams)CY$
Type L Riprap (Culvert Basin)CY$
Sediment Control Blanket (Coir Mat)SF$
Erosion Control LogLF$
Reinforced Rock BermLF$
Seed and HydromulchSF$
Vehicle Tracking PadEA$
Concrete WashoutEA$
Additional Alternates:
Fill Material (Import From Base Bid Export)CY$
Concrete Wheel StopsEA$
6" Stabilized Crusher Fines Placement (Trail)CY$
Parking Block Boulders (24"-36")EA$
3-Rail Dowel FencingLF$
Additional Items (List):
$
$
$

&"Arial,Regular"&12 &"Arial,Bold"SUPPLEMENTAL SCHEDULE OF UNIT PRICES

SUPPLEMENTAL SCHEDULE OF UNIT PRICES &"Arial,Regular"&10Page &P of &N

File details come from the government source that posted it. Updated .