SUPPLEMENTAL PRICING AND INVOICING INSTRUCTIONS FOR PROJECTS FUNDED BY THE INFLATION REDUCTION ACT OF 2022.docx
Optional Form DOCX document 20 KB Posted
- Attached to
- IRA Bismarck Federal Parking Lot Renovation
- Solicitation number
- 47PJ0025R0032
About this file
This document provides supplemental pricing and invoicing instructions for projects funded by the Inflation Reduction Act (IRA) of 2022, specifically for GSA contracts. The instructions establish a CLIN structure to track spending across three IRA appropriations: low-embodied carbon (LEC) materials, emerging and sustainable technologies, and high-performance green building measures. For LEC materials, separate subCLINs are required to track spending on asphalt, concrete, glass, and steel.
The document outlines that contractors must provide itemized invoices detailing amounts for each CLIN and subCLIN, reflecting the latest Schedule of Values. Expenses that can be included in IRA CLINs encompass material acquisition and transport, labor, overhead, design costs, demolition, disposal, environmental remediation, and commissioning expenses. Specific examples are provided for different scenarios, such as curtain wall installation with IRA-funded glass, road paving with IRA-funded asphalt, and structures using IRA-funded concrete. This guidance is being applied to the Bismarck Federal Parking Lot Renovation project (Solicitation #47PJ0025R0032), which involves replacing a 45,000 sf deteriorating asphalt parking lot with a new low embodied carbon concrete surface and adding perimeter fencing.
View the file
Other versions and copies of OF 2022
Who attaches OF 2022
| Agency | Files |
|---|---|
| General Services Administration Public Buildings Service Region 8 | 2 |
| General Services Administration Public Buildings Service National Capital Region | 1 |
| State | Files |
|---|---|
| Virginia | 4 |
| California | 1 |
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 47PJ0025R0032_0003 .pdf | ||
| Questions v3 Updated.docx | DOCX document | |
| Past Performance Questionaire.pdf | ||
| Solicitation Amendment 47PJ0025R0032_0002.pdf | ||
| Questions and answers amendment 0002 .docx | DOCX document | |
| Questions v1.0.docx | DOCX document | |
| Solicitation Amendment 47PJ0025R0032_0001.pdf | ||
| SOW BMK38 Parking Lot Renovations v3.0_2024 (1).docx | DOCX document | |
| Sol_SBSA_DB_1_Phase_April 2024 (1).pdf | ||
| IRA Project Submittal Form and Data Dictionary PDF.pdf | ||
| AWARD ALLOCATION FORM IRA .xlsx | XLSX spreadsheet | |
| Product Category Rule Concrete.pdf | ||
| Wage Determination .pdf | ||
| 47PJ0025R0032 Generated PDF with TOC.pdf | ||
| Layout Proposal.pdf | ||
| Reps and Certs GC May 2024 .pdf | ||
| Agreement .pdf | ||
| Sample IRA Project Submittal_ Reporting Form.xlsx | XLSX spreadsheet | |
| SOW BMK38 Parking Lot Renovations v2_2024.docx | DOCX document | |
| SAM.gov.pdf | ||
| Interim IRA LEC Material Requirements - used in Pilot May 2023 05162023 (1).pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENTAL PRICING AND INVOICING INSTRUCTIONS FOR PROJECTS FUNDED BY THE INFLATION REDUCTION ACT OF 2022 Revised May 22, 2023
I. Background
GSA must track spending for each of the three appropriations it received under the Inflation Reduction Act of 2022 (IRA) -- for low-embodied carbon (LEC) materials, emerging and sustainable technologies, and high-performance green building measures -- and has established “budget activities” for each of these appropriations. A contract line item number (CLIN) for each of these budget activities will be included in IRA-funded GSA solicitations and contracts, along with corresponding funding codes. In addition, subCLINs will be used to track spending on each of the LEC materials designated for IRA funding -- asphalt, concrete, glass, and steel.
II. IRA Pricing and Invoicing Instructions
Pricing:
· During solicitation, offerors must include separate prices for IRA work under the corresponding IRA CLINs. The CLIN structure will be akin to that shown in Table 1 below.
· During contract performance, modifications must also include separate prices for IRA work.
Invoicing:
· In addition to the information and documentation required in the “Administrative Matters” section of the Construction Agreement, contractors must provide itemized invoices detailing the amounts requested under each CLIN and SubCLIN set forth in the award and should reflect the latest Schedule of Values. See Table 1 for an example.[footnoteRef:1] [1: CLIN numbers may vary by contract.]
Table 1. Sample CLIN Structure
| CLIN & SubCLIN |
| Price |
| CLIN 0001 Non IRA Project Expenditures |
| $ |
| CLIN 0002 IRA Acquisition and installation of low embodied carbon materials |
| $ |
| SubCLIN 0002AA Acquisition and installation of low embodied carbon steel and associated expenses |
| $ |
| SubCLIN 0002AB Acquisition and installation of low embodied carbon asphalt and associated expenses |
| $ |
| SubCLIN 0002AC Acquisition and installation of low embodied carbon glass and associated expenses |
| $ |
| SubCLIN 0002AD Acquisition and installation of low embodied carbon concrete and associated expenses |
| $ |
| CLIN 0003 IRA emerging and sustainable Technologies |
| $ |
| CLIN 0004 IRA high-performance green building measures |
| $ |
III. Items Included in IRA CLINs
Amounts for each IRA CLINs should reflect all expenses necessary to accomplish the purposes of the line item. We have provided a list of possible types of such expenses below; this list is not definitive.
· Expenses of acquiring and transporting products and materials required for IRA-funded work to the construction site;
· Labor, general and administrative expenses, and overhead and profit reasonably attributable to IRA-funded work;
· Material, tool, and equipment expenses required for installation of IRA-funded work;
· Design, submittal and documentation expenses reasonably attributable to IRA-funded work;
· Demolition and disposal expenses reasonably necessary for and attributable to IRA-funded work;
· Expenses necessary to return space to its condition preceding IRA-funded work;
· Environmental remediation expenses required in execution of IRA-funded work; and
· Commissioning expenses reasonably attributable to IRA-funded work.
Depending on the project, examples of expenses that might be included in the low-embodied carbon materials CLIN and subCLINS may include:
· For a curtain wall using IRA-funded glass, purchase and installation of the aluminum mullions that hold the glass in place, attachment of the curtain wall to the floor slabs, and any necessary flashing and sealing.
· For a window using IRA-funded glass, the purchase and installation of the entire window.
· For road paving using IRA-funded asphalt, demolition and removal of the existing pavement; grading and sloping; laying the sub-base, base, and asphalt surface courses; installing butt joints, transitions, and manholes; sealcoating and striping; curbs; and traffic control necessary to divert cars while the lanes are being paved.
· Expenses for restoration of any adjacent laydown areas impacted by the activities described above.
· For structures using IRA-funded concrete, any necessary surface preparation, formwork, and finishing.