This is a post-award allocation form template for an IRA (Inflation Reduction Act) project focused on the Bismarck Federal Parking Lot Renovation. The form includes sections for general project information, owner/contractor details, scope of work, and a detailed cost breakdown using MasterFormat CSI divisions with specific emphasis on low embodied carbon materials, including concrete, steel, glass, and asphalt.
The bid tabulation portion shows partial pricing comparisons between an Independent Government Estimate (IGE) and multiple contractors, with detailed line items for divisions 00-08, totaling approximately $4,185.00 for IGE and $4,310.00 for Contractor B. The project involves replacing a 45,000 square foot deteriorating asphalt parking lot with a low embodied carbon concrete surface and installing a perimeter fence. The project is being managed by the GSA Public Buildings Service Region 8.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Information
POST AWARD ALLOCATION FORM IRA
| PROJECT NAME | ||||
| BUILDING NAME | ||||
| BUILDING ADDRESS | BUILDING NUMBER | |||
| ESTIMATED | ||||
| START DATE | PERIOD OF PERFORMANCE DAYS | |||
| SOLICITATION # | DELIVERY METHOD | Design Bid Build |
| OWNER INFORMATION | CONTRACTOR INFORMATION | ||
| OWNER | |||
| COMPANY NAME | CONTRACTOR COMPANY NAME | ||
| OWNER | |||
| CONTACT NAME | CONTRACTOR CONTACT NAME | ||
| ADDRESS | ADDRESS | ||
| OWNER | |||
| PHONE | CONTRACTOR PHONE | ||
| OWNER | |||
| CONTRACTOR EMAIL |
| SCOPE OF WORK |
| TEXT |
| MATERIALS AND SERVICES NOT INCLUDED |
| TEXT |
| ASSUMPTIONS |
| TEXT |
| NET ZERO CONTRIBUTIONS |
| TEXT |
Masterformat CSI
PBS MASTERFORMAT CSI
| Masterformat | |||
| CSI | System Elements (Trade Work) | Self Performed/ | |
| Subcontracted? | Amount |
| Div. 00 | Design Services - for Design Build | |
| Div. 00A | High Performing Green Buildings | |
| Div. 00B | Emerging and Sustainable Technologies | |
| Div. 01 | General Requirements (Please Include Jobsite Overhead) | |
| Div. 02 | Existing Conditions | |
| Div. 03 | Concrete | 0 |
| Div. 03A | Low Embodied Carbon Concrete | |
| Div 03.B | Non LEC Concrete | |
| Div. 04 | Masonry | |
| Div. 05 | Metals | 0 |
| Div. 05A | Low Embodied Carbon Steel | |
| Div 05.B | Non LEC Metals | |
| Div. 06 | Wood, Plastics, Composites | |
| Div. 07 | Thermal and Moisture Protection | |
| Div. 08 | Openings | 0 |
| Div. 08A | Low Embodied Carbon Glass | |
| Div 05.B | Non LEC Openings | |
| Div. 09 | Finishes | |
| Div. 10 | Specialties | |
| Div. 11 | Equipment | |
| Div. 12 | Furnishings | |
| Div. 13 | Special Construction | |
| Div. 14 | Conveying Equipment | |
| Div. 21 | Fire Suppression | |
| Div. 22 | Plumbing | |
| Div. 23 | Heating, Ventilating, and Air Conditioning (HVAC) | |
| Div. 26.1 | Electrical | |
| Div. 26.2 | Lighting | |
| Div. 27 | Communications | |
| Div. 28.1 | Electronic Safety | |
| Div. 28.2 | Electronic Security (TI - Non-BSAC) | |
| Div. 31 | Earthwork | |
| Div. 32 | Exterior Improvements | 0 |
| Div. 32.A | LEC Asphalt | |
| Div. 32.B | Rest of Exterior Improvements | |
| Div. 33 | Utilities | |
| Div. 34 | Transportation | |
| Div. 35 | Waterway and Marine Construction | |
| Div. 40 | Process Integration | |
| Div. 41 | Material Processing and Handling Equipment | |
| Div. 42 | Process Heating, Cooling and Drying Equipment | |
| Div. 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | |
| Div. 44 | Pollution and Waste Control Equipment | |
| Div. 45 | Industry Specific Manufacturing Equipment | |
| Div. 46 | Water and Wastewater Equipment | |
| Div. 48 | Electrical Power Generation | |
| Subtotal | Trade Cost | $0.00 |
| General Conditions | ||
| Insurances (General Liability, Subcontractor Performance, Builders Risk Program) | ||
| Payment and Performance Bond |
| Subtotal | Estimated Cost of Work | $0.00 |
| Overhead | ||
| Profit | ||
| ERROR:#NAME? | $0.00 |
Bid Tabulation
| PBS BID TABULATION FORM | ||||||
| Company Name: | Project No.: | |||||
| Project Name: | ||||||
| Location: | ||||||
| Architect: | Independent Government Estimate (IGE) | 0 | CONTRATOR B | CONTRACTOR C | CONTRACTOR D |
| Bid Date: | |||||||||||||
| BID QUANTITIES | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | |||
| Ref # | Item Description | Qty. | UNIT | ||||||||||
| Div. 00 | Design Services - for Design Build | 500 | $500.00 | 500 | $500.00 | $ - | $ - | $ - | |||||
| Div. 01 | General Requirements (Please Include Jobsite Overhead) | 900 | $900.00 | 1000 | $1,000.00 | $ - | $ - | $ - | |||||
| Div. 02 | Existing Conditions | 600 | $600.00 | 600 | $600.00 | $ - | $ - | $ - | |||||
| Div. 03 | Concrete | 210 | $210.00 | 200 | $200.00 | $ - | $ - | $ - | |||||
| Div. 03A | Low Embodied Carbon Concrete | 200 | $200.00 | 200 | $200.00 | $ - | $ - | $ - | |||||
| Div 03.B | Non LEC Concrete | 4.5 | $45.00 | 5 | $50.00 | $ - | $ - | $ - | |||||
| Div. 04 | Masonry | 5 | $50.00 | 6 | $60.00 | $ - | $ - | $ - | |||||
| Div. 05 | Metals | 6 | $60.00 | 5 | $50.00 | $ - | $ - | $ - | |||||
| Div. 05A | Low Embodied Carbon Steel | 1.4 | $280.00 | 1.5 | $300.00 | $ - | $ - | $ - | |||||
| Div 05.B | Non LEC Metals | 500 | $500.00 | 500 | $500.00 | $ - | $ - | $ - | |||||
| Div. 06 | Wood, Plastics, Composites | 1.25 | $250.00 | 1.25 | $250.00 | $ - | $ - | $ - | |||||
| Div. 07 | Thermal and Moisture Protection | 590 | $590.00 | 600 | $600.00 | $ - | $ - | $ - | |||||
| Div. 08 | Openings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 05A | Low Embodied Carbon Glass | $ - | $ - | $ - | $ - | $ - | |||||||
| Div 05.B | Non LEC Openings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 09 | Finishes | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 10 | Specialties | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 11 | Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 12 | Furnishings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 13 | Special Construction | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 14 | Conveying Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 21 | Fire Suppression | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 22 | Plumbing | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 23 | Heating, Ventilating, and Air Conditioning (HVAC) | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 26.1 | Electrical | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 26.2 | Lighting | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 27 | Communications | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 28.1 | Electronic Safety | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 28.2 | Electronic Security (TI - Non-BSAC) | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 31 | Earthwork | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32 | Exterior Improvements | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32.A | LEC Asphalt | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32.B | Rest of Exterior Improvements | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 33 | Utilities | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 34 | Transportation | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 35 | Waterway and Marine Construction | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 40 | Process Integration | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 41 | Material Processing and Handling Equipment | $ - | $ - | ||||||||||
| Div. 42 | Process Heating, Cooling and Drying Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | $ - | $ - | ||||||||||
| Div. 44 | Pollution and Waste Control Equipment | $ - | $ - | ||||||||||
| Div. 45 | Industry Specific Manufacturing Equipment | $ - | $ - | ||||||||||
| Div. 46 | Water and Wastewater Equipment | $ - | $ - | ||||||||||
| Div. 48 | Electrical Power Generation | $ - | $ - | ||||||||||
| $4,185.00 | $4,310.00 | ||||||||||||
| $426.69 | $426.69 | ||||||||||||
| $4,611.69 | $4,736.69 |
image1.png
File details come from the government source that posted it. Updated .