Summary of Required Solicitation Documents.pdf

PDF 152 KB Posted

Attached to
Fire House Generator and ATS Replacement
Solicitation number
ISD_363232_DA
Issued by

About this file

This is a Summary of Required Solicitation Documents outlining the technical and business proposal requirements for a Fire House Generator and ATS Replacement project at Fermi National Accelerator Laboratory. The technical proposal requires offerors to demonstrate capabilities in four key areas: carpentry (5 years), painting/epoxying (5 years), excavating/paving (5 years), and generator installation/commissioning (5 years). Offerors must provide three relevant project examples completed within the past 10 years.

The document specifies seven key personnel positions with minimum experience requirements, including Project Manager, Project Superintendent, Safety Coordinator, Pipe Fitting Foreman, Excavation Foreman, Electrical Foreman, and Generator Technician. The business proposal requires a firm fixed price, bid guarantee of 20% (not exceeding $3 million), completed SARC form, PUR-466 certifications, and additional documentation including safety records (OSHA 300A logs), insurance certificates, and corporate safety plans. All key personnel must have relevant industry experience ranging from 3-5 projects of similar scope and various required certifications including OSHA and NFPA training courses.

View the file

Other files

File Type Posted
Rev Exhibit B updated 010010_General_Requirements_3_2022 FermiForward.pdf PDF
Rev Exhibit D General Terms and Conditions for Construction (01-2025)_FFDG.pdf PDF
Rev Exhibit K Proposal Certifications Form PUR-466_FFDG.pdf PDF
Amendment 02 to RFP 363232.pdf PDF
Rev Exhibit C updated 013100_ESH_Requirements_FermiForward.pdf PDF
Rev Exhibit H Performance Bond FL-40_FFDG.pdf PDF
Rev Exhibit L SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf PDF
QandA_RFP 363232.pdf PDF
Rev Exhibit E Construction Insurance Requirements (01-2025)_FFDG.pdf PDF
Rev Exhibit F Bid Bond FL-41_FFDG.pdf PDF
Rev Exhibit G Payment Bond FL-42_FFDG.pdf PDF
Rev Exhibit J Statement and Acknowledgment (SF1413-23)_FFDG.pdf PDF
Amendment 01 to RFP 363232.pdf PDF
Exhibit A SOW-Fire House Generator and ATS Replacement.pdf PDF
Exhibit H Performance Bond FL-40 (Rev 12.22).pdf PDF
Exhibit K Proposal Certifications Form PUR-466 Rev 1 (10142021).pdf PDF
Exhibit E Construction Insurance Requirements 2024.pdf PDF
Exhibit J Statement and Acknowledgment (Standard Form 1413) (Rev 42013).pdf PDF
Exhibit L Subcontractor Annual Representations and Certifications (SARC) Form SARC (Rev 3).pdf PDF
2.0 Price Proposal Form.pdf PDF
Exhibit B 010010_General_Requirements_3_2022 (1).pdf PDF
Exhibit D FRA General Terms and Conditions for Construction (03.2024).pdf PDF
Exhibit G Payment Bond FL-42 (Rev 12.22).pdf PDF
Exhibit I Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit N Sample Subcontract.pdf PDF
Exhibit Q Fermilab Site Map-Fire House.pdf PDF
1.0 Request for Proposal_ISD_363232_DA.pdf PDF
Business Visitor Registration Instructions and Directions.pdf PDF
Exhibit C 013100_ESH_Requirements_3-2022 -FD.pdf PDF
Exhibit F Bid Bond FL-41 (Rev 12.22).pdf PDF
Exhibit M Davis Bacon Wage Rates IL20240008 Mod 11 2024_1018.pdf PDF
Exhibit O Director Safety Letter.pdf PDF
Exhibit P Fire House Generator-Drawing-Markup and notes.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF REQUIRED SOLICITATION DOCUMENTS

PART 1: TECHNICAL PROPOSAL (RESPONSES TO TECHNICAL EVALUATION CRITERIA)

Offerors shall respond to the following technical criteria:

1) Offeror shall provide information that clearly demonstrates how each requirement (sub-criterion below) will be met and/or has the following capabilities.

A) Having at least five (5) years of carpentry experience in the remodeling industry.

B) Having at least five (5) years of painting and epoxying experience.

C) Having at least five (5) years of Excavating/Paving experience.

D) Having at least five (5) years of Generator Installation/Commissioning experience

2) Current/Past Experience

Offeror shall provide information to facilitate FRA’s consideration of its corporate experience. FRA is most interested in examples of real work with actual results of the offeror in performing requirements similar to those of this solicitation in terms of size, scope, and complexity. Thus, offeror shall provide at least three (3) project experiences completed within the past ten (10) years that are of similar type, size, scope, and complexity as described in the solicitation documents.

3) Personnel Experience

Key Personnel Experience will be evaluated to determine the degree of and relevance of experience the Key Personnel possess related to the subject requirements. Evaluation of experience will factor in the length and degree of experience in the relevant technical areas. Please note that, as a condition of contract award and performance, should the contractor wish to substitute proposed Key Personnel in their proposal (or during performance, if after award), the replacement staff must possess education and/or experience equivalent to or exceeding that of the individual(s) being replaced, subject to the approval of the FRA, prior to performance.

Key Personnel must have, as a minimum, the following experience:

A) Project Manager: Five (5) years of construction industry experience, completed three (3) projects of similar size/scope, and completed the 30-hour OSHA Training Course.

B) Project Superintendent: Five (5) years of construction industry experience, completed five (5) projects of similar size/scope, and completed the 30-hour OSHA Training Course.

C) Safety Coordinator (or company safety officer): Five (5) years of industry experience, with five

(5) projects that encompass a similar scope.

D) Pipe Fitting Foreman: Five (5) years of industry experience, with five (5) projects that encompass a similar scope, 30 hour OSHA Training Course, NFPA Training Course

E) Excavation Foreman: Five (5) years of industry experience, with five (5) projects that encompass a similar scope, 30 hour OSHA Training Course, NFPA Training Course

F) Electrical Foreman: Five (5) years of industry experience, with five (5) projects that encompass a similar scope, 30-hour OSHA Training Course, NFPA 70E Training Course

G) Generator Technician: Five (5) years of industry experience, with five (5) projects that encompass a similar scope, NFPA 70E Training Course

PART 2 – BUSINESS PROPOSAL

1) Price Proposal Form

The proposed pricing shall be a firm fixed price for the work. The Price Proposal Form is required to be completed and signed.

2) Bid Guarantee/Bond

The offeror shall provide a bid guarantee in the amount of not less than 20 percent (not to exceed $3 million) of the proposal price. Failure to furnish a bid guarantee in the proper form and amount, by the time set for the due date of the offers, may be cause for rejection of the offer. The bid guarantee shall be in the form of a firm commitment, such as a bond, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds, or notes of the United States.

3) Subcontractor Annual Representations & Certifications (SARC), Form SARC

The successful Offeror’s submittal of this completed form will be incorporated in the resultant subcontract. If an offering entity is a joint venture, association, consortia, or partnership, each member entity must submit an individual Representations and Certifications Form.

4) Proposal Certifications, Form PUR-466

All appropriate sections are required to be completed and signed by a company official.

5) Other Documents

The following documents are required to be submitted with the proposal:

• Fermilab Subcontractor Injury & Illness Data Questionnaire (completed and signed).

• Construction Environmental, Safety & Health Certification (CESHC), which can be found in

Exhibit C – 013100 on pg. 36-38 of the pdf (completed and signed).

• The National Council on Compensation Insurance (NCCI) Workers Compensation

Experience Rating form for the past three years.

• Occupational and Safety Health Administration (OSHA) 300 A Form logs for the past three years.

• Corporate Safety and Health Plan (if your company’s plan has not already been accepted by

FRA).

• Sample Certificate of Insurance.

SUMMARY OF REQUIRED SOLICITATION DOCUMENTS
PART 2 – BUSINESS PROPOSAL