This is an Amendment 02 containing questions and answers for RFP ISD_363232_DA regarding a Fire House Generator and ATS Replacement project at Fermi National Accelerator Laboratory.

The Q&A addresses five key technical and scheduling matters: 1) Remote monitoring requirements, specifying three dry contacts for Firus and modbus/backnet output from the controller, 2) Confirmation that the required remote annunciator panel is solely for generator status/operation with no additional specifications, 3) Clarification that no fire alarm monitoring currently exists for the generator, 4) Flexibility on the 60-day completion schedule to accommodate generator lead times of 60-90 days, with vendors required to specify lead times in their proposals, and 5) Notification that existing conduit cannot be reused as it is planned for other purposes.

View the file

Other files

File Type Posted
Amendment 02 to RFP 363232.pdf PDF
Rev Exhibit C updated 013100_ESH_Requirements_FermiForward.pdf PDF
Rev Exhibit H Performance Bond FL-40_FFDG.pdf PDF
Rev Exhibit L SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf PDF
Rev Exhibit B updated 010010_General_Requirements_3_2022 FermiForward.pdf PDF
Rev Exhibit D General Terms and Conditions for Construction (01-2025)_FFDG.pdf PDF
Rev Exhibit K Proposal Certifications Form PUR-466_FFDG.pdf PDF
Rev Exhibit E Construction Insurance Requirements (01-2025)_FFDG.pdf PDF
Rev Exhibit F Bid Bond FL-41_FFDG.pdf PDF
Rev Exhibit G Payment Bond FL-42_FFDG.pdf PDF
Rev Exhibit J Statement and Acknowledgment (SF1413-23)_FFDG.pdf PDF
Amendment 01 to RFP 363232.pdf PDF
2.0 Price Proposal Form.pdf PDF
Exhibit B 010010_General_Requirements_3_2022 (1).pdf PDF
Exhibit D FRA General Terms and Conditions for Construction (03.2024).pdf PDF
Exhibit G Payment Bond FL-42 (Rev 12.22).pdf PDF
Exhibit I Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit N Sample Subcontract.pdf PDF
Exhibit Q Fermilab Site Map-Fire House.pdf PDF
Exhibit A SOW-Fire House Generator and ATS Replacement.pdf PDF
Exhibit H Performance Bond FL-40 (Rev 12.22).pdf PDF
Exhibit K Proposal Certifications Form PUR-466 Rev 1 (10142021).pdf PDF
Exhibit E Construction Insurance Requirements 2024.pdf PDF
Exhibit J Statement and Acknowledgment (Standard Form 1413) (Rev 42013).pdf PDF
Exhibit L Subcontractor Annual Representations and Certifications (SARC) Form SARC (Rev 3).pdf PDF
1.0 Request for Proposal_ISD_363232_DA.pdf PDF
Business Visitor Registration Instructions and Directions.pdf PDF
Summary of Required Solicitation Documents.pdf PDF
Exhibit C 013100_ESH_Requirements_3-2022 -FD.pdf PDF
Exhibit F Bid Bond FL-41 (Rev 12.22).pdf PDF
Exhibit M Davis Bacon Wage Rates IL20240008 Mod 11 2024_1018.pdf PDF
Exhibit O Director Safety Letter.pdf PDF
Exhibit P Fire House Generator-Drawing-Markup and notes.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 02 to RFP ISD_363232_DA Fire House Generator and ATS Replacement

Responses to Prospective Offerors’ Questions

Question 1: It was mentioned during the site-visit that there will need to be remote monitoring and/ or connecting to the existing fire alarm system, and that an email will be provided with further details. We have not yet received any emails with that information. Accordingly, please confirm the remote monitoring wiring that is needed between the annunciator and the main fire alarm system, or please provide wiring details.

Response 1: The remote monitoring wiring needed is three (3) dry contacts for Firus (out of auto, running, trouble alarm). Additionally, either modbus and/or backnet output from the controller (backnet preferred if possible).

Question 2: Per the given SOW, a remote annunciator panel (and e-stop) is to be installed inside the building. Is this annunciator panel for the status and operation of the generator only? Are there specific capabilities or specifications required for this generator annunciator panel that differ from the control panel mounted on the unit?

Response 2: The annunciator panel is just for the status and operation of the generator. There are no extra requirements.

Question 3: What type of system is currently in place for fire alarm monitoring? Most are proprietary systems that we will need to subcontract with the manufacturer to update.

Response 3: Currently there is no fire alarm monitoring for the generator.

Question 4: According to the proposal, the construction schedule requires the project to be completed within 60 calendar days from the NTP. We will not have an exact lead time on the generator until it is purchased after receiving the contract. However, the lead time we typically see on these generators could be as much as 60 - 90 days. Can the construction schedule be modified after the contract is awarded to allow for the time it takes to manufacture and ship the generator?

Response 4: We are looking for work to finish within 60 days of starting, however an increase to account for lead times is acceptable. Please provide lead times in your proposal.

Question 5: Can the existing conduit for the generator power be utilized?

Response 5: There are new plans to repurpose that conduit for something else, so it cannot be re-used for this project.