EDL5626.pdf

PDF 58 KB Posted

Attached to
Power Supply Solutions (PS2) Federal contract opportunity
Solicitation number
SPRWA1-19-R-0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document outlines a multiple award indefinite delivery indefinite quantity contract opportunity with the Department of the Air Force Materiel Command Lifecycle Management Center for power supply solutions. The contract will have a potential value of $800 million over 10 years and will involve the design, development and manufacture of power supplies ranging from low voltage to 20kVDC for various military aircraft. Awards will include 2 set-aside contracts for small businesses. The solicitation requests responses for 3 initial national stock numbers for power supplies with delivery timeframes ranging from 9 to 24 months after award. First article submissions will be due 18 to 24 months after award. The agency intends to award up to 6 contracts under this opportunity using a best value tradeoff methodology.

Engineering Data List NSN 5626

View the file

Other files for this federal contract opportunity

Other files attached to Power Supply Solutions (PS2), newest first.
File Type Posted
SPRWA1-19-R-0007_0002.pdf PDF
SPRWA119R0007_Question_and_Answer__6.docx DOCX document
SPRWA119R00010001.pdf PDF
SPRWA119R0007_QA__5.docx DOCX document
SPRWA119R0007_QA__4.docx DOCX document
SPRWA119R0007_Q__A__3.docx DOCX document
SPRWA119R0007_Q&A_2.docx DOCX document
SPRWA119R0007_Questions_and_Answers.docx DOCX document
Attachment1FACTSSHEET.docx DOCX document
QA807NSN3624.pdf PDF
EDL3927.pdf PDF
FirstArticleRequirement3624v2.pdf PDF
UpdatedReqDescription3927v4.pdf PDF
FirstArticleRequirement3927.pdf PDF
EDL3624.pdf PDF
PackagingRequirements3624v3.pdf PDF
IUIDChecklist3927.pdf PDF
Attachment3ClientAuthorizationLetter.docx DOCX document
IUIDChecklist3624.pdf PDF
Transportation3624.pdf PDF
UpdatedReqDescription5626v4.pdf PDF
PackagingRequirements5626v3.pdf PDF
CDRLpackage04172019.pdf PDF
Attachment4PricingMatrixv44.xlsx XLSX spreadsheet
Transportation3927.pdf PDF
SPRWA119R0007final.pdf PDF
FirstArticleRequirement5626.pdf PDF
UpdatedReqDescriptionandCDRLA007Continuation3624v6.pdf PDF
SOW05212019wAppendixA.pdf PDF
Attachment2PastPerformanceQuestionnaireDLA.docx DOCX document
QA807NSN3927.pdf PDF
QA807NSN5626.pdf PDF
IUIDChecklist5626.pdf PDF
PackagingRequirements3927v2.pdf PDF
Transportation5626.pdf PDF
Virtual_Industry_Day_Questions_and_Answers.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING DATA LIST

DATE:

30 OCT 2018

REVISION: 1 *HISTORY*

CAGE:

97942

PAGE:

NSN:

6130016645626EW

DATA TECH:

Rohde, David K

END ITEM:

AN/ALQ-184

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACA/

MANUFACTURER NAME:

NORTHROP GRUMMAN SYSTEMS

REFERENCE NUMBER:

578R729H05

NOUN:

POWER SUPPLY

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 97942 578R729 & ACC F S C OUTPUT POWER SUPPLY(

(DUAL LO)

Rohde, David K 30 OCT 2018

H05 ACC 2017C0002-R

NAME: DATE:

L 97942 T857816TS H S C TEST REQUIREMENT

SPECIFICATION FOR 578R729

Rohde, David K 30 OCT 2018

C/O 578R729

NAME: DATE:

L 98752 200415485 C S A GENERAL ENGINEERING

NOTES, ENGINEERING DATA

LIST (

Rohde, David K 30 OCT 2018

NOTES:1,3,4, & 12 APPLY

NAME: DATE:

STANDARD ENGINEERING TEXT

Rohde, David K 30 OCT 2018

For General Engineering Document Notes, see document number 200415485.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

FURNISHED METHOD CODE LEGEND:

Page 1 of 1EDL Version 1Generated by PRPS using Jasper Reports on 29 Jan 2019

File details come from the government source that posted it. Updated .