Attachment18Team_Roles_and_Responsibilities.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- SPRHA1-26-R-1003
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Team Roles and Responsibilities template for the Landing Gear Collaborative Supply Chain Integration II (LG-CSCI2) solicitation. The form requires contractors to identify all team members participating in their proposal and assign them to one or more of three evaluation subfactors: Engineering, Program Management, and Order Fulfillment. For each team member, contractors must provide the company name, business size designation (Large or Small), CAGE Code, and DUNS Number, then mark with an "X" which subfactors that entity will support. Contractors not participating in a particular subfactor will not be evaluated on that subfactor.
The LG-CSCI2 program is a 100% Small Business Set-Aside issued by Defense Logistics Agency (DLA) Aviation at Ogden under solicitation number SPRHA1-26-R-1003. The contract covers approximately 2,800 National Item Identification Numbers (NIINs) for competitive landing gear components supporting USAF aircraft, including both Depot Level Reparables and DLA consumables. The 10-year contract structure includes a 5-year base period plus one 5-year option with a Firm-Fixed-Price contract type and Evaluation Period Adjustments (EPA). Key performance objectives include achieving 95% on-time delivery for DLA-managed parts and 90% for USAF-managed parts, reducing production lead times by a minimum of 25%, and managing strategic raw material purchasing, forging die management, and obsolescence/DMSMS initiatives. Contractors should save the completed Excel file using their company name and submit it as part of their proposal response.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
TEAM LIST, ROLES AND RESPONSIBILITIES -
| Factor One Technical | ||||||
| Team | Sub-factor 1: Engineering | Sub-factor 2: Program Management | Sub-factor 3: Order Fulfillment | Business Size (Large or Small) | Cage Code | DUNS Number |
| (Prime Contractor/Joint Venture) | ||||||
| (Team Member) | ||||||
| (Team Member) | ||||||
| (Team Member) | ||||||
| (Team Member) | ||||||
| (Team Member) | ||||||
| Instructions: Please clarify the roles and responsibilities of each team member (as defined in Section M 2.3.5) participating in your proposal for the LG-CSCI2 solicitation by typing the name of each participating company in the appropriate column in the table above. Then mark an "X" for each subfactor that they will be participating in on this contract. Contractors not participating in a particular sub-factor will not be evaluated for that subfactor. Also include the Business Size, Cage Code, and DUNS Number for each as per the headings in the table. Please save the Excel file as your company name (e.g. ABCInc.xls). See example below. |
| Team | Sub-factor 1: Engineering | Sub-factor 2: Program Management | Sub-factor 3: Order Fulfillment | Business Size (Large or Small) | Cage Code | DUNS Number |
| ABC, Inc. | X | X | X | Small | XXXX | XXXXXXXX |
| XYZ, Inc. | X | X | X | Large | XXXX | XXXXXXXX |
| LMNOP, Inc. | X | Small | XXXX | XXXXXXXX | ||
| HIJK, Inc. | X | Small | XXXX | XXXXXXXX | ||
| (Subcontractor) | ||||||
| (Subcontractor) |
Example
File details come from the government source that posted it. Updated .