Attachment18Team_Roles_and_Responsibilities.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- SPRHA1-26-R-1003
- Issued by
-
Defense Logistics Agency Aviation
About this file
This file is an Excel template for proposing team roles and responsibilities for the Landing Gear Collaborative Supply Chain Integration II (LG-CSCI2) solicitation (SPRHA1-26-R-1003). The template requires contractors to identify all participating team members, including prime contractors and subcontractors, and designate their involvement across three technical evaluation subfactors: Engineering, Program Management, and Order Fulfillment. For each team member, proposers must provide the company name, business size classification (Large or Small), CAGE Code, and DUNS Number, then mark with an "X" the subfactors in which that organization will participate. The instructions specify that only contractors participating in particular subfactors will be evaluated for those subfactors. The template includes an example demonstrating the required format, with sample entries showing how to populate company names, mark participation across all three subfactors, and include supporting data such as business size and identifying codes. Proposers are instructed to save the completed file using their company name as the filename.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
TEAM LIST, ROLES AND RESPONSIBILITIES -
| Factor One Technical | ||||||
| Team | Sub-factor 1: Engineering | Sub-factor 2: Program Management | Sub-factor 3: Order Fulfillment | Business Size (Large or Small) | Cage Code | DUNS Number |
| (Prime Contractor/Joint Venture) | ||||||
| (Team Member) | ||||||
| (Team Member) | ||||||
| (Team Member) | ||||||
| (Team Member) | ||||||
| (Team Member) | ||||||
| Instructions: Please clarify the roles and responsibilities of each team member (as defined in Section M 2.3.5) participating in your proposal for the LG-CSCI2 solicitation by typing the name of each participating company in the appropriate column in the table above. Then mark an "X" for each subfactor that they will be participating in on this contract. Contractors not participating in a particular sub-factor will not be evaluated for that subfactor. Also include the Business Size, Cage Code, and DUNS Number for each as per the headings in the table. Please save the Excel file as your company name (e.g. ABCInc.xls). See example below. |
| Team | Sub-factor 1: Engineering | Sub-factor 2: Program Management | Sub-factor 3: Order Fulfillment | Business Size (Large or Small) | Cage Code | DUNS Number |
| ABC, Inc. | X | X | X | Small | XXXX | XXXXXXXX |
| XYZ, Inc. | X | X | X | Large | XXXX | XXXXXXXX |
| LMNOP, Inc. | X | Small | XXXX | XXXXXXXX | ||
| HIJK, Inc. | X | Small | XXXX | XXXXXXXX | ||
| (Subcontractor) | ||||||
| (Subcontractor) |
Example
File details come from the government source that posted it. Updated .