About this file
This is a pricing template for submitting As-Built Production Unit Cost proposals in response to the Self-Propelled Howitzer-Modernization (SPH-M) Mobile Tactical Cannon (MTC) Request for Prototype Proposal. Offerors are required to submit cost responses in Base Year 2026 U.S. Dollars for three production quantity ranges: 1-24 MTC systems, 25-36 MTC systems, and 37-48 MTC systems. The cost breakdown must include Direct Labor Cost, Direct Material Cost, Direct Subcontract Cost, Overhead Cost, G&A Cost, and Profit/Fee for each quantity range, with totals calculated for each tier. This cost volume serves as an evaluation criterion as defined in the RPP section 4.2.4 and will be used for competitive technical evaluation by Project Manager Howitzer Systems (PM HS) within the Department of the Army.
The template is marked as UNCLASSIFIED with Distribution Statement A for public release. As part of the final Proposal-Based Learning (P-BL) development, offerors should delete the cover page sheet upon submission and provide only the Title Page and P-BL sheets. Responses to this draft Request for Prototype Proposal were requested by February 16, 2026, with the final RPP anticipated for release in the Second Quarter of Fiscal Year 2026. The Government intends to award one contract to a single vendor for a 155mm self-propelled howitzer solution to replace towed M777 howitzers, initially for Stryker Brigade Combat Teams.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Page
UNCLASSIFIED
| Item Description: | As-Built Production Unit Cost Volume |
| Cover Page |
Distribution Statement A – Approved for Public Release; distribution unlimited
(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)
As part of the P-BL development, delete this sheet and submit only the "Title Page" and "P-BL" sheets.
1. Introduction
Tab 1. Instructions Nothing to input, informational only.
Tab 2. Production Unit Cost Insert the required information in the blue highlighted cells. The offeror will submit responses in Base Year (BY) 2026 U.S. Dollars (USD) for the given production quantity ranges for the As-built Production Configuration. This cost volume will be used for Evaluation as defined in RPP section 4.2.4
2. Production Unit Cost
Total Cost-Price Summary
Form Instructions: Insert the required information in the blue highlighted cells. The offeror will submit responses in Base Year (BY) 2026 U.S. Dollars (USD) for the given production quantity ranges for the As-built Production Configuration. This cost volume will be used for Evaluation as defined in RPP section 4.2.4
| Category Description | 1-24 | ||
| MTC systems | 25-36 | ||
| MTC systems | 37-48 |
MTC systems
| Direct Labor Cost | |||
| Direct Material Cost | |||
| Direct Subcontract Cost | |||
| Overhead Cost | |||
| G&A Cost | |||
| Profit/Fee | |||
| Total Price | $ - | $ - | $ - |