Appendix E - Milestone Pricing Summary.xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- Self-Propelled Howitzer-Modernization (SPH-M) Mobile Tactical Cannon (MTC) Draft #2 and Industry Day Slides/Q&A Federal contract opportunity
- Solicitation number
- SPH-M_MTC_2
- Issued by
- Department of the Army
About this file
This is a Milestone Pricing Summary template for the Self-Propelled Howitzer-Modernization (SPH-M) Mobile Tactical Cannon (MTC) Request for Prototype Proposal (RPP) No. W912CH-26-R-A017, Revision 001, dated February 19, 2026. The template is designed to capture milestone-based pricing across multiple deliverable categories including prototype MTC system deliveries (quantities 1-3 at various timeframes from 60 to 450 days post-award), cannon/breech assemblies for proof gun stands, ammunition storage cells, training systems, and test ammunition (HE projectiles, training projectiles, primers, and propelling charges across three increments). The spreadsheet organizes milestones across four separate files to accommodate up to 75+ milestones and includes columns for milestone number (WBS), description, SOW reference, proposed milestone price, percent of total proposed price, due date, contract type (Base or Option), cost share allocation, and USG share allocation.
The Summary tab displays all milestones with pricing currently showing placeholder values ($ - and ERROR:#DIV/0! entries), indicating this is a blank template awaiting contractor input. Additional milestone categories include Table F service payment schedules covering system engineering deliverables (Cyber Risk Management Framework, System Overview, Bill of Materials, Armor Suitability Report), fire control and network integration completions (tactical radio integration, position/navigation/timing, fire mission data processing, command and control applications, vehicle fire control emulator, human-machine interface), supply chain documentation, test and soldier evaluation support services, prototype production planning, and comprehensive training deliverables. Optional unfunded milestones address technical data packages for modular system interfaces, lightweight CAD models, targeted subsystems, and subsystem development options (fire control system, cannon assembly, human-machine interfaces, electrical power generation, ammunition handling, cannon mount and recoil systems, cannon pointing system, wheels and tires, armor, fire suppression systems, and climate control systems).
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
| Appendix E |
| Milestone Pricing Summary |
| RPP No. W912CH-26-R-A017 |
| Revision Number: 001 |
| Date: 19 Feb 2026 |
DISTRIBUTION STATEMENT A: Approved for Public Release; distribution unlimited.
Instructions
Please see the instructions at the top of each tab in this workbook.
Summary 4. Milestone Schedule
Summary 4. Milestone Schedule
Form Instructions: No Input Required. Sheet is linked to Tab 4. Milestone Schedule - File 1, 2, 3, and 4.
Milestone Number
| (WBS) | Milestone |
| Description | SOW |
| Reference | Proposed |
| Milestone Price | Percent of |
Total Proposed
| Price | Due Date | Contract | ||||||||||
| Type | Cost | |||||||||||
| Share ($) | USG | |||||||||||
| Share ($) | Identify if Milestome is Base or Option | |||||||||||
| Table A: Prototype MTC system delivery | Qty 1 - 60 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Base | ||
| Table A: Prototype MTC system delivery | Qty 2 - 360 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Option | ||
| Table A: Prototype MTC system delivery | Qty 2 - 390 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 1 - 420 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 120 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 150 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 3 - 300 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Projectile - 300 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Projectile - 300 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table D: Training System | Qty 2 - 420 days after award - Base | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table D: Training System | Qty 2 - 270 days after award - UM | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 1 HE Projectiles | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 2 HE Projectiles | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 3 HE Projectiles | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 1 Training Projectiles | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 1 Primers | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 2 Primers | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 3 Primers | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 1 Propelling Charges | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 2 Propelling Charges | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 3 Propelling Charges | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F: Service Payment Schedule | Completion of Start of Work Meeting, Deliver Program Integrted Master Schedule (CDRL A019) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Base | ||
| Table F: Service Payment Schedule | Ammunition Ballistics Data (CDRL A002) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Option | ||
| Table F: Service Payment Schedule | Complete PMR (0 of 8 available) at $ each - provide total in column E and add each pricing in column C after first $ | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F: Service Payment Schedule | Integration & Technical Support (monthly) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - System Engineering | Delivery of Cyber Risk Management Framework Artifacts (CDRL A031) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - System Engineering | Delivery of System Overview (A001) New Draft FIR CDRL, Indentured Bill of Materials (CDRL A003), Armor suitability Report (CDRL A026) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (a) Completion of Tactical Radio Integration | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (b) Completion of Position/Navigation/Timing Device | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (c ) Fire Mission Data Processing integration | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (d) Completion of Command and Control Applications Integration | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (e )Development of Vehicle Fire Control Emulator | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (f) Submit Graphical Human Machine Interface | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Supply Chain | Delivery of EDFP & OMIT Data (CDRL A009) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Supply Chain | Delivery of Availability Assessment (CDRL A032) & Supply Chain Market Checklist (CDRL A034) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Test & Soldier Evaluation | Deliver Critical Crew Drill Report (CDRL A012), Health Hazard Assessment Report (CDRL A013), Safety Assessment Report (CDRL A014) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Test & Soldier Evaluation | Deliver System Safety Hazard Analysis Report (CDRL A015), Failure Mode Effects and Critical Analysis (CDRL A023), Transportability Report (CDRL A024), Petroleum Oils and Lubricant List (CDRL A025) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Test & Soldier Evaluation | Test Support Services (est. 18 Months) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Test & Soldier Evaluation | MTC Soldier Evaluation Support (est. 12 Months) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Prototype Production | Deliver Production Capability Plan (CDRL A018) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 1st Operation and Crew Level training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 2nd Operation and Crew Level training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 3rd Operation and Crew Level training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 4th Operation and Crew Level Training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Completion of 1st Cannon/Breech/Muzzle Brake Assembly training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Completion of 2nd Cannon/Breech/Muzzle Brake Assembly training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Completion of 1st Operator and Field Maintainer training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Base | ||
| Table F - Training | Completion of 2nd Operator and Field Maintainer training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Option | ||
| Table F - Training | Completion of 3rd Operator and Field Maintainer training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 1st vehicle familiarization training event | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 2nd vehicle familiarization training event | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 1: Technical Data -Modular System Interfaces | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 2: Technical Data - Lightweight CAD Model | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (a) Fire Control System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (b) Cannon Assembly | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (c) Human-Machine Interfaces | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (d) Electrical Power Generation Storage and Distribution System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (e ) Ammunition Handling System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (f) Canon Mount and Reoil System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (g) Cannon Pointing System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (h) Wheel and Tire Assembly | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (i) Armor | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (j) Integrated Fire Suppression System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | (k) Climate Control Systems | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| 0 | 0 | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| 0 | 0 | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| 0 | 0 | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| 0 | 0 | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| 0 | 0 | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| 0 | 0 | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Total Proposed Price | $ - | ERROR:#DIV/0! | $ - | $ - | ||||||||
| check | check |
4. Milestone Schedule-File 1
Milestone Schedule
Form Instructions: Insert the required information in the blue highlighted cells. Copied from Tab 4. Milestone Schedule from the individual Milestone Pricing Excel file proposal spreadsheet for Milestones 1 -25, as needed.
Milestone Number
| (WBS) | Milestone |
| Description | SOW |
| Reference | Proposed |
| Milestone Price | Percent of |
Total Proposed
| Price | Due Date | Contract | |||||||
| Type | Cost | ||||||||
| Share ($) | USG | ||||||||
| Share ($) | Identify if Milestome is Base or Option | ||||||||
| Table A: Prototype MTC system delivery | Qty 1 - 60 days after award | $ - | 0.00% | $ - | $ - | Base | |||
| Table A: Prototype MTC system delivery | Qty 2 - 360 days after award | $ - | 0.00% | $ - | $ - | Option | |||
| Table A: Prototype MTC system delivery | Qty 2 - 390 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 1 - 420 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 120 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 150 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 3 - 300 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Projectile - 300 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Projectile - 300 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table D: Training System | Qty 2 - 420 days after award - Base | $ - | 0.00% | $ - | $ - | ||||
| Table D: Training System | Qty 2 - 270 days after award - UM | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 1 HE Projectiles | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 2 HE Projectiles | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 3 HE Projectiles | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 1 Training Projectiles | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 1 Primers | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 2 Primers | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 3 Primers | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 1 Propelling Charges | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 2 Propelling Charges | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 3 Propelling Charges | $ - | 0.00% | $ - | $ - | ||||
| Total Proposed Price | $ - | 0.00% | $ - | $ - | |||||
| check | check |
4. Milestone Schedule-File 2
Milestone Schedule
Form Instructions: Insert the required information in the blue highlighted cells. Copied from Tab 4. Milestone Schedule from the individual Milestone Pricing Excel file proposal spreadsheet for Milestones 26 -50, as needed.
Milestone Number
| (WBS) | Milestone |
| Description | SOW |
| Reference | Proposed |
| Milestone Price | Percent of |
Total Proposed
| Price | Due Date | Contract | |||||||
| Type | Cost | ||||||||
| Share ($) | USG | ||||||||
| Share ($) | Identify if Milestome is Base or Option | ||||||||
| Table F: Service Payment Schedule | Completion of Start of Work Meeting, Deliver Program Integrted Master Schedule (CDRL A019) | $ - | 0.00% | $ - | $ - | Base | |||
| Table F: Service Payment Schedule | Ammunition Ballistics Data (CDRL A002) | $ - | 0.00% | $ - | $ - | Option | |||
| Table F: Service Payment Schedule | Complete PMR (0 of 8 available) at $ each - provide total in column E and add each pricing in column C after first $ | $ - | 0.00% | $ - | $ - | ||||
| Table F: Service Payment Schedule | Integration & Technical Support (monthly) | $ - | 0.00% | $ - | $ - | ||||
| Table F - System Engineering | Delivery of Cyber Risk Management Framework Artifacts (CDRL A031) | $ - | 0.00% | $ - | $ - | ||||
| Table F - System Engineering | Delivery of System Overview (A001) New Draft FIR CDRL, Indentured Bill of Materials (CDRL A003), Armor suitability Report (CDRL A026) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (a) Completion of Tactical Radio Integration | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (b) Completion of Position/Navigation/Timing Device | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (c ) Fire Mission Data Processing integration | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (d) Completion of Command and Control Applications Integration | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (e )Development of Vehicle Fire Control Emulator | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (f) Submit Graphical Human Machine Interface | $ - | 0.00% | $ - | $ - | ||||
| Table F - Supply Chain | Delivery of EDFP & OMIT Data (CDRL A009) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Supply Chain | Delivery of Availability Assessment (CDRL A032) & Supply Chain Market Checklist (CDRL A034) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Test & Soldier Evaluation | Deliver Critical Crew Drill Report (CDRL A012), Health Hazard Assessment Report (CDRL A013), Safety Assessment Report (CDRL A014) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Test & Soldier Evaluation | Deliver System Safety Hazard Analysis Report (CDRL A015), Failure Mode Effects and Critical Analysis (CDRL A023), Transportability Report (CDRL A024), Petroleum Oils and Lubricant List (CDRL A025) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Test & Soldier Evaluation | Test Support Services (est. 18 Months) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Test & Soldier Evaluation | MTC Soldier Evaluation Support (est. 12 Months) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Prototype Production | Deliver Production Capability Plan (CDRL A018) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 1st Operation and Crew Level training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 2nd Operation and Crew Level training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 3rd Operation and Crew Level training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 4th Operation and Crew Level Training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Completion of 1st Cannon/Breech/Muzzle Brake Assembly training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Completion of 2nd Cannon/Breech/Muzzle Brake Assembly training | $ - | 0.00% | $ - | $ - | ||||
| Total Proposed Price | $ - | 0.00% | $ - | $ - | |||||
| check | check |
4. Milestone Schedule-File 3
Milestone Schedule
Form Instructions: Insert the required information in the blue highlighted cells. Copied from Tab 4. Milestone Schedule from the individual Milestone Pricing Excel file proposal spreadsheet for Milestones 51 -75, as needed.
Milestone Number
| (WBS) | Milestone |
| Description | SOW |
| Reference | Proposed |
| Milestone Price | Percent of |
Total Proposed
| Price | Due Date | Contract | |||||||
| Type | Cost | ||||||||
| Share ($) | USG | ||||||||
| Share ($) | Identify if Milestome is Base or Option | ||||||||
| Table F - Training | Completion of 1st Operator and Field Maintainer training | $ - | 0.00% | $ - | $ - | Base | |||
| Table F - Training | Completion of 2nd Operator and Field Maintainer training | $ - | 0.00% | $ - | $ - | Option | |||
| Table F - Training | Completion of 3rd Operator and Field Maintainer training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 1st vehicle familiarization training event | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 2nd vehicle familiarization training event | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 1: Technical Data -Modular System Interfaces | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 2: Technical Data - Lightweight CAD Model | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (a) Fire Control System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (b) Cannon Assembly | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (c) Human-Machine Interfaces | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (d) Electrical Power Generation Storage and Distribution System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (e ) Ammunition Handling System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (f) Canon Mount and Reoil System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (g) Cannon Pointing System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (h) Wheel and Tire Assembly | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (i) Armor | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (j) Integrated Fire Suppression System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | (k) Climate Control Systems | $ - | 0.00% | $ - | $ - | ||||
| $ - | 0.00% | $ - | $ - | ||||||
| $ - | 0.00% | $ - | $ - | ||||||
| $ - | 0.00% | $ - | $ - | ||||||
| $ - | 0.00% | $ - | $ - | ||||||
| $ - | 0.00% | $ - | $ - | ||||||
| $ - | 0.00% | $ - | $ - | ||||||
| Total Proposed Price | $ - | 0.00% | $ - | $ - | |||||
| check | check |