This document is a Supplemental Specifications file for road and street construction in Pinellas County, Florida, prepared to accompany the Pinellas County Standard Technical Specifications and FDOT Standard Specifications. The document specifically addresses the Countywide Mast Arms - Group 3 project (P.I.D. No. 004183A) and provides special provisions for survey and layout, and clearing and grubbing activities. The project involves roadway improvements at seven intersections, including signalization upgrades and mast arm replacements, with the work to be completed under a single contract.
The specifications outline detailed requirements for contractors, including mandatory property owner notifications, right-of-way staking, property corner protection, and removal of items conflicting with construction activities. The survey and layout work is to be paid as a single lump sum, and contractors must handle clearing and grubbing, including temporary capping of irrigation systems and removal of landscaping, signs, and lighting. The project is federally funded through the Federal Emergency Management Administration (FEMA) and administered by Pinellas County, with the contract referencing the April 2022 Pinellas County and July 2021 FDOT specifications.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENTAL SPECIFICATIONS
ROAD AND STREET CONSTRUCTION
P.I.D. No. 004183A (004183D, 004183E, 004183F, 004183M, 004183N, 004183O, 001483P)
COUNTYWIDE MAST ARMS – GROUP 3
In Pinellas County, Florida
TO ACCOMPANY PINELLAS COUNTY STANDARD TECHNICAL SPECIFICATIONS FOR
ROADWAY AND RELATED CONSTRUCTION (APRIL 2022 EDITION), AND FLORIDA
DEPARTMENT OF TRANSPORTATION (FDOT) STANDARD SPECIFICATIONS FOR ROAD
AND BRIDGE CONSTRUCTION – DIVISIONS II AND III ONLY (JULY 2021)
SPECIAL PROVISIONS
Section 005-0701 of the Pinellas County Roadway Std. Tech. Specs. Survey and Layout
The specification for Survey, Construction Layout shall be amended to include:
• The right of way shall be staked out with a stake or marker every 100 feet on both sides of the road.
• All property corners and section corners shall be protected through the contract period by the contractor, if a property corner is damaged, they will be restored by a Florida registered Professional Land Surveyor at no additional cost to the County.
PAY ITEM NO. 005-0701, Survey and Layout the work specified under this Section must be one Lump Sum (LS) quantity.
Section 110 of the Pinellas County Road Std Tech. Specs. Clearing and Grubbing
The specification for Clearing and Grubbing shall be amended with the following:
B. Items in County Right-of-Way:
The Contractor must notify in writing all property owners to remove any items (landscaping, signs, lighting, etc.) from the County Right-of-Way that owners wish to salvage a minimum of fourteen
(14) calendar days in advance of construction activities. After the notification period, it is the Contractor’s responsibility to remove said items that conflict with construction activities prior to construction. The Contractor must place a temporary cap on the pipe that feeds into the irrigation system conflicting with construction activities within County Right-of-Way. The price and payment for capping and removal of irrigation systems, and removal of other items must be included in the payment item of Clearing and Grubbing.