SF 30_SPE60525R0221_Amd 0006.pdf

PDF 226 KB Posted

Attached to
SPE60525R0221 Amendment 0011 COG 8 Posts, Camps and Stations
Solicitation number
SPE60525R0221
Issued by

About this file

This document is a Standard Form 30 (SF 30) Amendment 0006 for DLA Energy's COG 8 Solicitation SPE60525R0221. The amendment provides updates to Attachment H – COG 8 Line Items, dated 8.12.2025, with specific changes including:

  • BRP (Base Replenishment Price) for line item 0054 updated to $3.107700
  • Mode changes for line items 0092 and 0121
  • Escalator ID for line item 0104 modified from ODSEAT2U to ODSEAT2UR

Offerors are required to complete the SF 30, Blocks 15A through C, and submit the form with their proposal by August 13, 2025 at 4:30 pm (EST) at Fort Belvoir, VA. All other terms and conditions remain unchanged from the previous solicitation version.

View the file

Other files

File Type Posted
SF 30_SPE60525R0221_Amd 0011.pdf PDF
SF 30_SPE60525R0221_Amd 0010.pdf PDF
SF 30_SPE60525R0221_Amd 0009.pdf PDF
ENERGY QAP C16.08-1 Turbine Fuel Aviation (JAA) (JAN 2025).pdf PDF
SF 30_SPE60525R0221_P0008.pdf PDF
ENERGY QAP C16.23-2 MGO MGT (MAY 2025).pdf PDF
SF 30_SPE60525R0221_Amd 0007.pdf PDF
Attachment - H COG 8 8.12.2025.pdf PDF
SF 30_SPE60525R0221_Amd 0005.pdf PDF
SF 30_SPE60525R0221_Amd 0004.pdf PDF
Attachment A - Schedule_004.pdf PDF
Attachment H-COG 8 Line Items 8.12.2025.pdf PDF
Attachment - H.xlsx XLSX spreadsheet
Attachment A - Schedule_003.pdf PDF
ENERGY QAP C1.02 GENERALIZED TECHNICAL GUIDANCE (MAR 2025).pdf PDF
SF-30_SPE60525R0221- Amd_0003.pdf PDF
SF 30_SPE60525R0221_Amd 0002.pdf PDF
SPE60525R0221_Final.pdf PDF
ENERGY QAP C16.64-1 Turbine Fuel Aviation (JP8) (JAN 2025).pdf PDF
SF 30_SPE60525R0221_Amd 0001.pdf PDF
Attachment H - COG 8 LINE ITEMS.xlsx XLSX spreadsheet
Attachment H - COG 8 LINE ITEMS.pdf PDF
Attachment G - Safety Data Sheet.pdf PDF
SPE60525R0221_Final.pdf PDF
Attachment D - PCS OET Vendor Guide.pdf PDF
Attachment E - DLA Energy Quality Provisions C. E QAPS.pdf PDF
Attachment B - AMPS Role Guide.pdf PDF
Attachment C - Requesting the OET Vendor Role in AMPS Guide.pdf PDF
Attachment A - Schedule.pdf PDF
Attachment F - Additional Text Instructions.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF

CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS

DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE NARRATIVE

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.2R

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

PAGE OF PAGES

1 3

6. ISSUED BY

DLA Energy CODE SPE605 7. ADMINISTERED BY (If other than Item 6)

5. PROJECT NUMBER (If applicable)

3.28

CODE

Attn: Georgia Dotson 8725 John J. Kingman Rd, STE 3930 Ft Belvoir, VA 22060

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

SPE60525R0221

9B. DATED (SEE ITEM 11)

07/22/2025

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER

7012632725

3. EFFECTIVE DATE

08/13/2025

1. CONTRACT ID CODE

This Amendment 0006 is hereby issued against COG 8 Solicitation SPE60525R0221. Offerors are required to complete SF 30, Blocks 15A. through C., Page 1 only, and submit the form with your proposal by August 13, 2025 at 4:30 pm (EST) Fort Belvoir, VA local time.

The purpose of this SF 30 Amendment 0006 is to provide responses to offeror questions as follows:

1. Added an updated Attachment H – COG 8 Line Items, dated 8.12.2025, which supersedes all previous versions.

-Updated:

0054 – BRP on Attachment H to $3.107700

0092 – Mode on Attachment H to TT 0104- Escalator ID from ODSEAT2U to ODSEAT2UR 0121- Mode on Attachment H to TTWP

All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .