Attachment F - Additional Text Instructions.pdf

PDF 458 KB Posted

Attached to
SPE60525R0221 Amendment 0011 COG 8 Posts, Camps and Stations
Solicitation number
SPE60525R0221
Issued by

About this file

Attachment G is a federal contract document detailing additional text instructions for a solicitation (SPE60525R0221) for petroleum, oils, and lubricants (POL) product deliveries. The document provides comprehensive guidelines for contractors, covering topics such as supplies to be furnished, delivery conditions, economic price adjustments, invoice submission requirements, and measurement standards for various fuel types across posts, camps, and stations in Idaho, Montana, Oregon, and Washington.

Key provisions include a contract period from October 1, 2025, to September 30, 2028, with deliveries f.o.b. destination. The solicitation is a total small business set-aside, with 35 line items reserved for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and 16 line items set aside for Women-Owned Small Businesses (WOSB). Contractors must comply with specific measurement, documentation, and quality assurance requirements, including using API (American Petroleum Institute) standards for volume corrections, meter calibrations, and shipping documentation. The document provides detailed conversion factors, measurement methods, and instructions for handling various fuel types and delivery scenarios.

View the file

Other files

File Type Posted
SF 30_SPE60525R0221_Amd 0011.pdf PDF
SF 30_SPE60525R0221_Amd 0010.pdf PDF
SF 30_SPE60525R0221_Amd 0009.pdf PDF
ENERGY QAP C16.08-1 Turbine Fuel Aviation (JAA) (JAN 2025).pdf PDF
SF 30_SPE60525R0221_P0008.pdf PDF
ENERGY QAP C16.23-2 MGO MGT (MAY 2025).pdf PDF
SF 30_SPE60525R0221_Amd 0007.pdf PDF
SF 30_SPE60525R0221_Amd 0006.pdf PDF
Attachment - H COG 8 8.12.2025.pdf PDF
SF 30_SPE60525R0221_Amd 0005.pdf PDF
Attachment A - Schedule_004.pdf PDF
Attachment H-COG 8 Line Items 8.12.2025.pdf PDF
SF 30_SPE60525R0221_Amd 0004.pdf PDF
SF-30_SPE60525R0221- Amd_0003.pdf PDF
ENERGY QAP C1.02 GENERALIZED TECHNICAL GUIDANCE (MAR 2025).pdf PDF
Attachment - H.xlsx XLSX spreadsheet
Attachment A - Schedule_003.pdf PDF
SF 30_SPE60525R0221_Amd 0002.pdf PDF
SPE60525R0221_Final.pdf PDF
ENERGY QAP C16.64-1 Turbine Fuel Aviation (JP8) (JAN 2025).pdf PDF
SF 30_SPE60525R0221_Amd 0001.pdf PDF
Attachment H - COG 8 LINE ITEMS.pdf PDF
Attachment H - COG 8 LINE ITEMS.xlsx XLSX spreadsheet
Attachment A - Schedule.pdf PDF
Attachment B - AMPS Role Guide.pdf PDF
Attachment C - Requesting the OET Vendor Role in AMPS Guide.pdf PDF
Attachment E - DLA Energy Quality Provisions C. E QAPS.pdf PDF
SPE60525R0221_Final.pdf PDF
Attachment G - Safety Data Sheet.pdf PDF
Attachment D - PCS OET Vendor Guide.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G

ADDITIONAL TEXT INSTRUCTIONS

NOTE: Offerors are required to complete fill-in areas highlighted in yellow.

NO. TITLE

1. SUPPLIES TO BE FURNISHED (DOMESTIC PC&S)

2. ECONOMIC PRICE ADJUSTMENT – PETROLEUM PRODUCT PRICE, POST, CAMP AND STATIONS)

3. DELIVERY CONDITIONS FOR TRANSPORT TRUCKS, AND TRAILERS AND TANK WAGONS

4. DELIVERY CONDITIONS FOR TANK CARS, BOXCARS, TRUCKS, TRANSPORT TRUCKS,OR

TRUCKS AND TRAILERS (JPTS) (MISSILE FUELS)

5. GENERAL SHIPPING CONDITIONS

6. DETERMINATION OF INVOICE QUANTITY (PC&S)

7. DLA INTERNET BID BOARD SYSTEM (DIBBS) THIS PROVISION ONLY APPLIES TO DLA FUNDED

LINE ITEMS

8. TRANSPORT TRUCK AND/OR TRUCK TRAILER FREE TIME AND DETENTION RATES (PC&S)

9. NOTIFICATION OF CHANGE IN TRANSPORTATION COMPANY (PC&S)

10. DELIVERY AND ORDERING PERIODS

11. DELIVERY CONDITIONS FOR ALL GRADES OF MOTOR GASOLINE AND AVIATION FUELS

12. INVOICE NUMBERING REQUIREMENTS

13. SUBMISSION OF INVOICES FOR PAYMENT (DOMESTIC PC&S)

14. DEFINITIONS

15. ADMINISTRATIVE COST OF TERMINATION FOR CAUSE—COMMERCIAL ITEMS

16. PROTECTION OF GOVERNMENT PROPERTY AND SPILL PREVENTION

17. RELEASE OF PRICES

18. AUTHORIZED NEGOTIATORS

19. WIDE AREA WORKFLOW (WAWF) SUPPLEMENTAL INVOICE SUBMISSION

20. PROPOSAL ACCEPTANCE PERIOD

21. E-MAIL PROPOSALS

22. NOTIFICATION OF TRANSPORTATION COMPANY TO BE UTILIZED IN THE DELIVERY OF

PRODUCT (PC&S)

23. CONVERSION FACTORS

24. EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS)

ADDITIONAL TEXT INSTRUCTIONS INCORPORATED BY FULL TEXT

SUPPPLIES TO BE FURNISHED (DOMESTIC PC&S)

(a) The supplies to be furnished during the period specified in the REQUIREMENTS clause, the delivery points, methods of delivery, and estimated quantities are shown below. The quantities shown are best estimates of required quantities only. Unless otherwise specified, the total quantity ordered and required to be delivered may be greater than or less than such quantities. The Government agrees to order from the Contractor and the Contractor shall, if ordered, deliver during the contract period all items awarded under this contract. The prices paid shall be the unit prices specified in subsequent price change modifications issued in accordance with the ECONOMIC PRICE ADJUSTMENT clause.

(b) All items of this contract call for delivery f.o.b. destination unless the item otherwise specifies. The destination for each item is the point of delivery shown in the particular item.

(c) Written telecommunication (facsimile) is authorized for transmittance of a properly completed order. In an emergency, oral orders may be issued but must be confirmed in writing by an order within 24 hours.

(d) If any gasoline items are included in this document, they may require oxygenated fuel as a result of changes in environmental laws. See the SPECIFICATIONS (CONT'D) (COG 8) contract text for a listing of counties, cities, and townships that require oxygenated gasoline during the period listed.

(e) Offers shall not be submitted for quantities less than the estimated quantities specified below for each line item. Any offers received for less than the full quantity for each line item will be rejected by the Government.

ECONOMIC PRICE ADJUSTMENT - PETROLEUM PRODUCT PRICE , POST, CAMP, AND STATION (PC&S)

(a) Warranties: The Contractor warrants that—

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this contract text; and

(2) The prices to be invoiced hereunder shall be computed daily in accordance with the wording of this contract text.

(b) Definitions: As used throughout this contract text, the term--

(1) Base price means—

(i) The unit price offered for an item and included in the contract award schedule; or

(ii) During any subsequent program year, either the effective contract price as of the start of the subsequent program year, or the price agreed upon as of the start of the subsequent program year.

(2) Base reference price means the reference price for an item as published on March 3, 2025. In the event one or more applicable reference prices are not (or were not) published on the date shown, then the term base reference price means the reference price for an item as published on the date nearest in time prior to the date shown.

(3) Reference price means that published reference price or combination of published reference prices for price adjustment of individual items by product, market area, and publication as specified in (f) below.

(4) Date of delivery means—

(i) For tanker or barge deliveries.

(A) Free on board (f.o.b.) origin: The date and time vessel commences loading.

(B) F.o.b. destination: The date and time vessel commences discharging.

(ii) For all other types of deliveries: The date product is received on a truck-by-truck basis.

(5) Published means issued in either printed or electronic format by the service designated to be employed as an escalator, unless otherwise specifically stated. In the event of a conflict between the price set forth in the print version and those set forth in the electronic version for the same date, the electronic version shall prevail unless otherwise specified in (c) below.

(c) Adjustments: Contract price adjustments shall be provided via notification through contract modifications and/or posting to the web page under the heading Vendor Resources and then Product Price Adjustments to reflect any price change pursuant to this contract text.

(1) Calculations: The prices payable hereunder shall be determined by adjusting the award price by the same number of cents, or fraction thereof, that the daily reference price increases or decreases, per like unit of measure. All arithmetical calculations, including the final adjusted unit price, shall be carried to six decimal places.

Oil price information service (OPIS): For all items employing OPIS, the reference price in effect on the date of delivery shall be the end of day OPIS rack average effective (6:00 p.m. timestamp) that day. In the event there is no price published for date of delivery, then it shall be the item’s reference price that was last in effect.

Other publications: Except for items employing OPIS, the reference price in effect on the date of delivery shall be that item's preselected reference price that is in effect the date of delivery. In the event there is no price published for date of delivery, then it shall be the item’s reference price that was last in effect.

(2) Revision of published reference price: In the event—

(i) Any applicable reference price is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the reference price consistently and substantially failed to reflect market conditions— the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustments hereunder. The contract shall be modified to reflect such substitute effective on the date the reference price was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), Disputes, of the Contract Terms And Conditions - Commercial Items clause of this contract.

(3) Failure to deliver: Notwithstanding any other wording of this contract text, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the Contract Terms And Conditions - Commercial Items clause of this contract in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(4) Upward ceiling on economic price adjustment: The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment texts shall not exceed ____350%________ percent (%) of the of the base price in any applicable program year, except as provided below.

If at any time the Contractor has reason to believe that within the near future a price adjustment under the wording of this contract text will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with an appropriate explanation and documentation as required by the Contracting Officer.

If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(d) Examination of records: The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the wording of this contract text.

(e) Final invoice: The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this contract text.

(f) Publications. The following publication(s) is (are) used: See Attachment G – DLA Energy Quality Provisions C-E

QAPS.

ITEMS METHOD OF DELIVERY ESTIMATED QUANTITY

Attachment A – The Schedule contains a description of requirements for the items/supplies to be acquired.

Please note there are some line items that has seasonal escalators that will be changed twice a year by DLA Energy around May and November.

DELIVERY CONDITIONS FOR TRANSPORT TRUCKS, TRUCKS AND TRAILERS, AND TANK WAGONS

IMPORTANT NOTE on EPA TESTING OF UNDERGROUND TANKS. If the "volumetric" method is used for annual EPA testing of underground tanks, the "topping off" of tanks for this test is outside the scope of DLA Energy requirements contracts.

(a) F.O.B. ORIGIN. On items calling for delivery at Contractor's refinery, terminal, or bulk plant f.o.b.

transport truck, truck and trailer, or tank wagon—

(1) Supplies ordered hereunder shall be delivered, at Contractor's expense, into equipment specified in the Schedule.

(2) Unless otherwise specified in the Schedule, all deliveries shall be made on the day specified in the delivery order unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that the Contractor shall have received the order at least 48 hours prior to the day so specified.

(b) F.O.B. DESTINATION. On items calling for delivery f.o.b. destination by means of transport truck, truck and trailer, or tank wagon--

(1)Where the Schedule provides for multiple drop deliveries, the Contractor may be required to deliver into more than one storage tank. Where truck and trailer is the method of delivery specified, the Contractor may, at its option, make delivery by transport truck. In the case of deliveries in Alaska, where truck and trailer or transport truck is the method of delivery specified, the Contractor may, at its option, make delivery by tank wagon.

(2) Unless otherwise specified in the Schedule, all deliveries shall be made on the day specified in the delivery order unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that the Contractor shall have received the order at least 48 hours prior to the day so specified.

(3) When delivery is made by tank wagon, such wagon shall be equipped with pump, meter, and a minimum of 100 feet (30 meters) of hose. Where delivery is made by transport truck or truck and trailer, such delivery equipment shall be equipped with a minimum of 15 feet of hose.

(4) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility, the Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.

(5) Unless otherwise provided in the Schedule, free time for unloading trucks, transport trucks, or trucks and trailers shall be unlimited.

(6) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility—

(i) The Contractor shall provide properly maintained delivery equipment and properly trained delivery personnel to reasonably assure that delivery can be made without damage to vegetation and asphalt pavement adjacent to storage facilities being filled. The Contractor’s delivery personnel who have not exercised reasonable care and delivery equipment that is poorly maintained may be refused entrance to the installation by the installation Commander.

(ii) The Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.

DELIVERY CONDITIONS FOR TANK CARS, BOXCARS, TRUCKS, TRANSPORT TRUCKS, OR TRUCKS AND

TRAILERS (JPTS) (MISSILE FUELS)

(a) On items calling for delivery at Contractor's refinery, terminal, or bulk plant f.o.b. tank car, boxcar, truck, transport truck, or truck and trailer--

(1) Supplies ordered hereunder shall be delivered, at Contractor's expense, into equipment specified in the Schedule.

(2) Unless otherwise specified in the Schedule, all deliveries shall be made upon the day specified in the order provided that the Contractor shall have received the order at least 48 hours prior to the day so specified.

(3) All packaged or drummed material to be delivered f.o.b. boxcar, or truck shall be loaded (braced and blocked where necessary) by the Contractor as follows:

(i) RAIL SHIPMENTS IN CONTINENTAL UNITED STATES AND ALASKA.

(A) In accordance with the LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS contract text.

(B) To the extent there is no conflict between the standards mentioned in paragraph (a) of the LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS contract text, when a freight advantage to the Government would result, the Contractor will load boxcars to maximum capacity, including multiple tiering.

(ii) TRUCK SHIPMENTS IN THE UNITED STATES. In accordance with ICC Regulations and best commercial practices.

(iii) RAIL SHIPMENTS AND TRUCK SHIPMENTS - OVERSEAS, POSSESSIONS AND TERRITORIES. In accordance with best commercial practices and local regulations, or as indicated in the Schedule.

(4) Except for supplies delivered f.o.b. boxcar or truck, title to the supplies delivered, and risk of loss thereof, shall pass from the Contractor to the Government when the supplies pass into the receiving conveyance. Title to supplies delivered f.o.b. boxcar or truck, and risk of loss thereof, shall pass from the Contractor to the Government at the time the car or truck is released to, and accepted by, the carrier.

(b) On items calling for delivery f.o.b. destination by means of tank car, boxcar, truck, transport truck, or , truck and trailer--

(1) Supplies ordered hereunder shall be delivered, all transportation charges paid, to the destination and by means of the transportation equipment specified in the Schedule or, if no specific destination is indicated in the Schedule, to the destination specified in the order. (For activities listed in DLA Energy Handbook 4525.1 as last revised, the shipping addresses stated herein shall apply.) Delivery shall be accomplished at Contractor's expense into Government storage or into the type of receiving equipment otherwise specified in the Schedule or in the order, except for--

(i) Delivery by tank car which shall be accomplished by spotting the car alongside the unloading manifold connection at the specified destination;

(ii) Delivery by boxcar which shall be accomplished at the specified destination as follows:

(A) If such activity has a railroad siding, by spotting the car alongside the unloading platform or elsewhere at such destination as may be designated by the receiving activity;

or

(B) If such activity does not have a railroad siding at the unloading platform of the railroad siding serving such activity, and if the freight tariff provides for free pickup and delivery service, delivery shall be made to the activity specified in the order;

(iii) Delivery by truck which shall be accomplished by spotting the truck at the unloading platform at the specified destination and by placing the drummed or packaged supplies at the tailgate of the truck; and

(2) Unless otherwise specified in the Schedule, all deliveries by tank car or boxcar shall be made within 24 hours from the time specified in the order, provided that such order shall have been received by the Contractor at least 120 hours prior to the time so specified; all other deliveries, except as hereinafter indicated, shall be made on the day specified in the delivery order and unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that such order shall have been received by the Contractor at least 48 hours prior to the days so specified. Delivery by transport truck or truck and trailer shall be made at the specific time specified in the order, provided that such order shall have been received by the Contractor at least 24 hours prior to the specific time such delivery is required to be made.

(3) The Contractor shall not be required to deliver by transport truck or truck and trailer a quantity less than a full load nor into more than one storage tank.

(4) Where delivery is made by transport truck or truck and trailer, such delivery equipment shall be equipped with a minimum of 15 feet of hose.

(5) When delivery is made by transport truck or truck and trailer to a Government facility--

(i) The Contractor shall provide properly maintained delivery equipment and properly trained delivery personnel to reasonably assure that delivery can be made without damage to vegetation and asphalt pavement adjacent to storage facilities being filled. The Contractor's delivery personnel who have not exercised reasonable care and delivery equipment which is poorly maintained, may be refused entrance to the installation by the installation Commander.

(ii) The Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.

(6) Unless otherwise provided in the Schedule, free time for unloading trucks, transport trucks, or trucks and trailers shall be unlimited.

(7) Except for supplies delivered by tank car, boxcar or truck, title to supplies delivered, and risk of loss thereof, shall pass from the Contractor to the Government when the supplies pass into the receiving facilities. Title to supplies delivered by tank car or boxcar, and risk of loss thereof, shall pass from the Contractor to the Government at the time the car is released by the carrier for unloading. Title to supplies delivered by truck, and risk of loss thereof, shall pass from the Contractor to the Government when the drummed or packaged supplies are removed from the truck.

GENERAL SHIPPING CONDITIONS

(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:

"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks, and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE

AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION OFFICE)

in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND TITLE OF

CONTRACTOR'S DESIGNATED REPRESENTATIVE)."

(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.

(c) Conveyances required for shipments shall be furnished or designated by the Government. The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES. Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.

(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels and jet lubricating oil and 60 mesh or finer in the case of reciprocating engine oil.

Strainers shall be located as near the loading point as practicable. Contractor shall furnish and periodically inspect and clean such strainers and repair same, if necessary, keeping a written record thereof.

(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. Such seals will be furnished by the Contractor. Seal numbers will be indicated on shipping documents.

(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.

(g) FOR TANK CARS ONLY.

(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.

(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.

(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.

(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments. Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.

(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.

(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.

(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.

(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.

(m) Custody of product delivered to tanker or barge, and risk f loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.

(n) The Contractor shall be held accountable for demurrage charges arising from delay(s) in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.

(o) The following subparagraphs only apply to barges and tankers.

(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.

(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival. Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours notice for barges and 72 hours notice for tankers will require verbal approval of the Contractor, confirmed in writing.

(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --

(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.

(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available. If the vessel is not moored in its proper turn with other vessels, laytime will commence at 6:00 A.M. on the date the Government vessel’s turn occurred.

(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph

(ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.

(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until loading of the barge or tanker is completed and hoses have been removed.

(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:

(A) FOR BARGES: One hour for each 2,000 barrels of product to be loaded.

(B) FOR TANKERS: Thirty-six hours for load of full vessel cargo. When partial vessel cargoes are to be loaded, the 36 hours will be prorated based on quantities loaded by each supplier. The 36 hours includes allowances for routine events that occur in the loading process, such as cushioning and topping off of vessel tanks.

(vi) Hoses and loading arms for loading shall be furnished, connected, and disconnected by the Contractor.

(2) INCREASES TO BASIC ALLOWED LAYTIME.

(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be loaded do not permit loading, basic allowed laytime shall be increased by the duration of the delay.

(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.

(iii) After laytime commences, when vessels are required to dock at anchorage due to vessel delays such as vessel inspection and inerting, laytime credit will be allowed for transit time from anchors away at anchorage until first line ashore berthing, not to exceed 2 hours.

(iv) If regulations of the owner or operator of the vessel prohibit loading at any time after laytime has commenced, time so lost shall be added to basic allowed laytime.

(v) If, for any reason, the Contractor is delayed in loading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.

(vi) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.

(vii) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.

(3) PAYMENT OF DEMURRAGE. For all hours of laytime which elapse in excess of the basic allowed laytime for loading provided for by paragraph (1) above, or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:

(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.

(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.

DETERMINATION OF INVOICE QUANTITY (PC&S)

(a) QUANTITY. The quantity of supplies furnished under this contract shall be determined as follows:

(1) F.O.B. DESTINATION.

(i) DELIVERIES BY TANKER OR BARGE.

(A) On items requiring delivery on an f.o.b. destination basis by tanker or barge, the quantity shall be determined on the basis of--

(1) Calibrated meters on the receiving tank system; or

(2) Receiving tank measurements.

(B) All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

(ii) DELIVERIES BY RAIL TANK CAR.

(A) On items requiring delivery on an f.o.b. destination basis by rail tank car, the quantity of supplies furnished under this contract shall be determined (at the Government’s option) on the basis of--

(1) Calibrated meter on the receiving tank system;

(2) Weigh, using calibrated scales at the receiving location; or

(3) Receiving tank measurements.

(B) All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

(iii) DELIVERIES BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON.

(A) If the narrative requires a tank wagon (which is always equipped with a meter), that meter shall be used to determine quantity at time of delivery. The quantity shall be read directly from the meter. On items requiring delivery on a f.o.b. destination basis by tank truck or truck and trailer, quantity shall be determined in the following order of preference:

(1) Calibrated meter on the receiving tank system

(2) Calibrated meter on the conveyance

(3) Weight using calibrated scales at the receiving location.

(4) Loading rack meter ticket. The ticket must be generated at the time of loading and be based on a calibrated loading rack meter. The loading rack ticket shall be mechanically annotated with the gross and net gallons (or gross and net liters), the observed and corrected API gravity (or density), and the temperature at which the product was measured.

(5) Receipt tank measurements (as identified in the Schedule).

(B) All quantities, other than delivery by tank wagon, shall be converted, either mechanically or manually, to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

(C) If a loading rack meter ticket is used to determine quantity for a biodiesel blend, the quantity shall be converted to net (volume corrected) gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius). The Contractor shall prepare separate loading rack meter tickets for the diesel portion and for the biodiesel blend stock B100 (the industry designation for pure biodiesel), hereinafter referred to as the B100 portion of the load. The B100 loading rack meter shall be recorded at gross (ambient) temperature when the loading meter is not capable of providing a net (volume corrected) quantity. The total shall be the sum of the net diesel and gross B100. When the B100 loading rack meters are capable of providing a net (volume corrected) quantity, the total receipt quantity shall be the sum of the net diesel and the net B100.

(2) F.O.B. ORIGIN. All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

(i) DELIVERIES INTO TANKER OR BARGE. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tanker or barge, the quantity shall be determined (at the Contractor's option) on the basis of--

(A) Calibrated meter; or

(B) Shipping/shore tank measurement.

(ii) DELIVERIES INTO RAIL TANK CAR. On items requiring delivery at the Contractor’s refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor’s option) on the basis of--

(A) Certified loading rack meter;

(B) Weight, using calibrated scales; or

(C) Certified capacity tables for the rail tank car.

(iii) DELIVERIES BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON.

(A) On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor's option) on the basis of--

(1) Calibrated loading rack meter;

(2) Weight, using calibrated scales; or

(3) Certified capacity tables of the conveyance loaded.

(B) WATER BOTTOMS.

(1) Every delivery must be free of all water bottoms prior to discharge; and

(2) The Contractor is responsible for their removal and disposal.

(b) MEASUREMENT RESTRICTIONS. All methods of measurements described in this contract text are subject to government safety and environmental restrictions, foreign or domestic. Such restrictions may prohibit, or render ineffective, a particular method in some cases.

(c) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the United States, other technically equivalent national or international standards may be used. Certified capacity tables shall mean capacity tables prepared by an independent inspector or any independent surveyor to the aforementioned measurement and calibration standards. In addition, the following specific standards will be used as applicable:

(1) API MPMS Chapter 11.1, Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils (this chapter is an adjunct to ASTM D 1250, IP 200 and ISO 91- 1). Either the 2004 or 1980 version of the standard may be used. Either the printed tables (an adjunct to the 1980 version) or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine and the 2004 version of the standard will be the referee method.

(i) For crude oils, JP4, and Jet B, use Volume I, Tables 5A and 6A; Volume VII, Tables 53A and 54A; or Volume IV, Tables 23A and 24A.

(ii) For lubricating oils, use Volume XIII, Tables 5D and 6D; Volume XIV, Tables 53D and 54D; or Tables 23D and 24D (2004 version).

(iii) For all other fuels and fuel oils, use Volume II, Tables 5B and 6B; Volume VII, Tables 53B and 54B; or Volume V, Tables 23B and 24B.

(iv) For chemicals/additives, use Volume III, Table 6C (or Volume IX, Table 54C) or volume correct in accordance with the product specification.

(v) Volume XII, Table 52, shall be used to convert cubic meters at 15 degrees Celsius to barrels at 60 degrees Fahrenheit. Convert liters at 15 degrees Celsius to cubic meters at 15 degrees Celsius by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be used.

(vi) As an option to (c)(1)(v), liters may be converted to gallons using Table F1.09A (see below). If this option is used, it must be agreed upon by both parties and shall remain in effect for the duration of the contract. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.

(vii) If the original measurement is by weight and quantity is required by U.S. gallons, then--

(A) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.

(B) Volume XII of the adjunct to ASTM D 1250, Table 58, shall be used to convert metric tons to U.S.

gallons at 60 degrees Fahrenheit.

(2) API MPMS Chapter 4, Proving Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 6 months, whichever is more frequent. A meter calibration log/calibration certificates shall be maintained which, as a minimum, contains--

(i) Number/name of each meter;

(ii) Calibration frequency;

(iii) Date of the last calibration;

(iv) Due date for next calibration;

(v) Name and signature of the person performing the calibration;

(vi) Traceability to master meter/prover used for calibration; and

(vii) Calibration report number.

Each meter shall be marked with the date of the last calibration and due date for the next calibration. All calibration meter recordings and logs/certificates shall be kept on file and made available upon request. All calibration records (including logs or certificates) shall be retained on file for a period of three years.

(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter. Outside the U.S., use of tank shell correction factor is not required unless its use is a customary practice for custody transfer.

TABLE F1.09-2A

CONVERSION FACTOR TABLE

Density @ 15°C

Gallons @ 60°F to Liters @ 15°C, Multiply by

Liters @ 15°C to Gallons @ 60°F, Multiply by

0.723 – 0.768 3.78286

0.264350

0.769 – 0.779

3.78309

0.264334

0.780 – 0.798

3.78334

0.264317

0.799 – 0.859

3.78356

0.264301

0.860 – 0.964

3.78381

0.264284

0.965 – 1.074

3.78405

0.264267

(d) SHIPPING DOCUMENTATION. The following information shall be mechanically annotated on the contractor’s shipping document (such as a truck’s metered ticket) when the document is used to determine quantity under this contract: gross and net quantity (gallons or liters, as required), observed and corrected API gravity/density, and the temperature (Fahrenheit or Celsius) at which the product was measured.. The following exceptions apply:

(1) Where government documents are the sole basis for payment, such as DD Form 250/250-1s, the information is not required.

(2) Where conveyances with temperature-compensating meters are used, the shipping document shall only be annotated with the corrected API gravity/density, the net quantity, and a statement that a temperature-compensating meter was used to determine net quantity.

(3) Where volume correction for temperature is not required in accordance with Paragraph (a)(1)(iii)(B) above, the shipping document shall be only be annotated with the API gravity (or density), gross quantity, and a statement that volume correction was not required.

(e) RIGHT TO REPRESENTATIVE. For f.o.b. origin deliveries, the Government has the right to have a representative present to witness the measurement of quantity. For f.o.b. destination deliveries, the Contractor has the right to have a representative present to witness the delivery and measurement of quantity.

(f) DISCREPANCIES . For f.o.b. destination deliveries utilizing volume corrected loading rack meter tickets to determine quantity:

(1) The quantities shown on the shipping document (volume corrected loading rack meter tickets) will be accepted as the quantity received, provided that any differences between that quantity and the Government’s receipt tank measurement at destination does not exceed one half of one percent (0.5%) of the amount on the shipping document.. If the difference is greater than one half of one percent (0.5%), the quantity determined by the Government using receipt tank measurements at destination will be used for acceptance and payment provided receipt tank measurements are identified in the Schedule as an approved quantity determination method for that line item. Quantity measurements using the methods specified in section (a)(1)(iii)(A) (1-3) above will be used for acceptance and payment regardless of any discrepancy with a loading rack meter ticket.

(2) If, the Government’s receipt tank quantity measurement varies by more than one half of one percent (0.5%) from the Contractor’s quantity measurement, the parties may conduct a joint investigation) of the variation in order to identify the cause of the discrepancy. Any quantity discrepancy that cannot be settled by the parties and results in a dispute shall be resolved under the Disputes provisions of the contract.

DLA INTERNET BID BOARD SYSTEM (DIBBS)

(THIS TEXT ONLY APPLIES TO DLA FUNDED LINE ITEMS.)

(a) Contractor Registration. Contractors must register in DIBBS to obtain a login account at https://www.dibbs.bsm.dla.mil. The login account will allow a contractor to register a primary and alternate email address for notifications. Contractors are strongly encouraged to establish a group email address for the primary email address for the contractor’s authorized point of contacts. The registered email addresses will be the only email used by the government to make notifications.

(b) All contractors must have an active System for Award Management (SAM) account, http://www.sam.gov in order to register for DIBBS.

(c) The Contractor shall use DIBBS to receive orders. DLA Energy will not be using DIBBS receipt of quotes capability. All quotations, proposals, bids shall be submitted in accordance with the terms and conditions of the solicitation.

(d) Preparation and Transmission of Orders

(1) The Government may issue an order for a specific delivery or a series of deliveries (e.g., several deliveries during a week). The Government may also elect to issue an order covering a longer period (including monthly orders) and make periodic calls against these orders designating specific delivery dates, times, and quantities.

(2) Only a DLA Energy warranted Contracting Officer can issue an order, either orally or in writing, against a contract. An oral order issued by the warranted Contracting Officer shall provide the required advance notice to the Contractor and the following information: Interim order number; contract number; item number; ceiling price; quantity;

delivery location; and the required delivery and/ or service date.

(i) For all product orders, the Contractor will receive an electronically signed written order via DIBBS, within 24 hours or one business day after the warranted Contracting Officer issues an oral order.

(ii) For all service orders, the Contractor will receive an electronically signed written order via DIBBS, within five business days after issuing the oral order.

(iii) Interim order number is subject to change once the electronically signed written order is received by the contractor. The order number on the written order will take precedence over the interim order number, if different.

https://www.dibbs.bsm.dla.mil/ http://www.sam.gov/

(iv) Regardless of the unit price cited on the written order, the office designated to make payments on the written order will pay the applicable unit price in effect under the terms and conditions of the contract.

(v) Once the order has been issued, an email will be sent to the Contractor to provide notice that the order is available on the contract-specific web page. The order will also be submitted to the payment office.

(3) Calls against previously issued orders must be confirmed in writing within 24 hours or one business day via email message. The email confirmation will reference the previously issued order number and item number and designate specific delivery location, dates, and quantity to be delivered against that order.

(4) The Contractor’s nonreceipt of a written or electronic confirmation of an oral order or oral call against a written or electronic order does not relieve the Contractor from its obligation to perform in accordance with the oral order or oral call against a written or electronic order. The Contractor should contact the DLA Energy Contracting Officer if problems are experienced with receipt of the electronic or written confirmation.

TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND DETENTION RATES (PC&S)

(a) Upon arrival of Contractor's transport truck or truck and trailer, the receiving activity shall promptly designate the tanks into which the load is to be discharged. Free time will commence when the discharge hose is connected to the receiving line at the delivery point and will end when discharge is completed. The Contractor shall be paid for detention beyond free time for delays caused by the Government. A minimum of one hour free time is required.

(1) Free time for unloading a transport truck or truck and trailer (includes one hour minimum plus any additional time): _______________________________________________.

(2) Rate for detention beyond free time: ____________________________________________________.

The above will not be considered in the evaluation of offers for award except that a free time of less than one hour may render an offer unacceptable. Notwithstanding the above, the Government is entitled to at least as much free time as is allowed by the common carrier or that the Contractor normally allows its regular commercial customers, whichever is greater. Free time only applies to single-drop deliveries (it is not applicable to multiple-drop tank truck/truck and trailer deliveries or any tank wagon deliveries).

(b) Notwithstanding the above, the Government will not pay more in detention rates than the actual rate charged by the common carrier or the rate the Contractor normally charges its regular commercial customers, whichever is lower.

Detention costs will be the sole responsibility of the activity incurring them and are only allowable on single drop deliveries (they are not allowable on multiple drop tank truck/truck and trailer deliveries or any tank wagon deliveries. Invoices for detention costs will be submitted by the Contractor directly to the activity receiving the product. These provisions are applicable to DLA-owned/capitalized as well as non-DLA-owned/noncapitalized products.

(c) UNLESS THE OFFEROR OTHERWISE INDICATES IN PARAGRAPHS (a)(1) AND (a)(2) ABOVE, FREE TIME WILL BE CONSIDERED UNLIMITED AND DETENTION COSTS WILL NOT BE CHARGEABLE.

NOTIFICATION OF CHANGE IN TRANSPORTATION COMPANY (PC&S)

(a) In the performance of this contract, the Contractor agrees not to utilize transportation companies that have been debarred or suspended, are ineligible for receipt of contracts with Government agencies, are in receipt of a notice of proposed debarment or ineligibility from any Government agency, or are otherwise ineligible under Federal programs.

Substitution of a new transportation company is subject to review by the Contracting Officer for use under this contract.

(b) If the Contractor changes transporters after award, the Contractor shall provide the Contracting Officer with the following information on alternative or new transportation company(ies) being utilized in the transportation of supplies under this contract.

Na…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .