SF1449 Conformed 1-28-21.pdf

PDF 1 MB Posted

Attached to
SPE60320R0517 - NAS JRB DALLAS/FT. WORTH, TX - SOLICITATION
Solicitation number
SPE60320R0517
Issued by

About this file

This solicitation requests offers for government-owned, contractor-operated operational, maintenance, management and ground refueling/defueling services at NAS JRB Dallas/Fort Worth, Texas. The services include providing storage facilities and petroleum products under a firm-fixed-price contract from December 2021 through November 2025 with an option to extend through November 2030. Offerors must submit pricing on a monthly basis and comply with quality assurance provisions, reporting requirements, and other standard contract clauses. The solicitation is designated for small business and includes subcontracting plans.

View the file

Other files

File Type Posted
SF1449 Conformed 5-10-21.pdf PDF
Amendment 0009.pdf PDF
QA.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
WD 2015-5231 Rev 16 12-21-20.pdf PDF
PWS January 06 2021 with Changes.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
SF1449 Conformed Oct 1 2020.pdf PDF
Attachment VI-DLA Form 2019.pdf PDF
SF1449 Conformed Sept 22 2022.pdf PDF
Amendment 0004.pdf PDF
Technical QA.pdf PDF
PWS Sept 22 2020.pdf PDF
Contracting QA.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Attachment II PPQ.pdf PDF
Attachment VII QAPs.pdf PDF
Attachment V WD.pdf PDF
Attachment VI Form 19.3.pdf PDF
Attachment I PWS.pdf PDF
QAP E0002 E1.11.pdf PDF
QAP E0007 E35.pdf PDF
Attachment IV PP References.pdf PDF
QAP E0003 E22.pdf PDF
QAP E0004 E28.pdf PDF
Attachment III PP Consent Form.pdf PDF
SF1449.pdf PDF
QAP E0005 E29.pdf PDF
QAP E0001 E1.01.pdf PDF
QAP E0006 E30.01.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 0081496019

1. REQUISITION NUMBER

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

SPE603-20-R-0517

5. SOLICITATION NUMBER

2020 JUL 15

6. SOLICITATION ISSUE

DATE

Salman Shahid

a. NAME b. TELEPHONE NUMBER (No Collect calls)

Phone: 571-767-9332

2020 AUG 24

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY CODE SPE603

DLA ENERGY

BULK PETROLEUM SERVICES

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

USA

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

8 (A)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

493190NAICS:

SIZE STANDARD:

11. DELIVERYFOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/ CODE

OFFEROR

FACILITY

CODE

TELEPHONE NO.

18a. PAYMENT WILL BE MADE BY CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See Schedule

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED

SEE SCHEDULE

7. FOR SOLICITATION

INFORMATION CALL:

SEE SCHEDULE

03:00 PM

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE ADDENDUM

EDWOSB

32a. QUANTITY IN COLUMN 21 HAS BEEN

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED

COMPLETE PARTIAL FINAL

STANDARD FORM 1449 (REV. 2/2012) BACK

36. PAYMENT

PARTIAL FINAL

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY

42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42b. RECEIVED AT (Location)

SPE603-20-R-0517

NAS JRB DALLAS FT. WORTH, TX

Contents

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SECTION E – INSPECTION AND ACCEPTANCE

52.246-4 INSPECTION OF SERVICES-FIXED PRICE (AUG 1996)

E-0001 E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION OF SERVICES (DLA ENERGY JAN 2012) ... 9

E-0002 E1.11 QUALITY CONTROL PLAN (DLA ENRGY MAR 2000)

E-0003 E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENGERY APR 2016) E-0004 E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY DEC 2011)

E-0005 E29 INITIAL ON-STATION INSPECTION (DLA ENERGY MAR 1997)

E-0006 E30.01 DESIGNATION OF QUALITY REPRESENTATIVE (DLA ENERGY MAR 1981)

E-0007 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)

SECTION F- DELIVERIES OF PERFORMANCE

52.242-15 STOP WORK ORDER (AUG 1989)

F-0001 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY APR 2014)

F-0002 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA ENERGY DEC 1991)

SECTION G-CONTRACT ADMINISTRATION DATA

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD MANAGEMENT (OCT 2018) 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)

G-0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY JAN 2017)

G-0003 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)

G-0004 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)

SECTION H-SPECIAL CONTRACT REQUIREMENTS

H-0001 H11 GUARD SERVICE (DLA ENERGY MAR 1982)

H-0002 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY JAN 2012)

H-0003 H51.01 INSURANCE REQUIREMENTS (AARD) (DLA ENERGY JAN 2012)

H-0004 H51.03 INSURANCE REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS (DLA ENERGY JAN 2012) ..20

SECTION I-CONTRACT CLAUSES

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)

52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018)

ADDENDUM 1 TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS (OCT 2018)-52.243-1

CHANGES- FIXED PRICE (AUG 1987) ALT I (APR 1984)

52.243-1 CHANGES- FIXED PRICE (AUG 1987) ALT I (APR 1984)

ADDENDUM 2 TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS (OCT 2018)- 52.215-8

ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMANT (OCT 1997)

52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMANT (OCT 1997)

52.212-5 CONTRCT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—

COMMERCIAL ITEMS (MAR 2020)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (MAY 2011)

52.228-5 INSURANCE- WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

52.232-17 INTEREST (MAY 2014)

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013) 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)

52.237-3 CONTINUITY OF SERVICES (JAN 1991)

52.242-13 BANKRUPTCY (JUL 1995)

52.245-1 GOVERNMENT PROPERTY (JAN 2017)

52.245-9 USE AND CHARGE (APR 2012)

52.251-1 GOVERNMENT SUPPLY SOURCES (APR 2012)

245.102 POLICY. (DEVIATION 2020-O0004)

252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (DEVIATION 2020-O0004)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

52.202-1 DEFINITIONS (NOV 2013) (INCORPORATED BY REFERENCE)

52.203-3 GRATUITIES (APR 1984) (INCORPORATED BY REFERENCE)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMBER FIBER CONTENT PAPER (MAY 2011)

(INCORPORATED BY REFERENCE)

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018) (INCORPORATED BY REFERENCE)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011) (INCORPORATED BY

REFERENCE)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2018)

(INCORPORATED BY REFERENCE)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018) (INCORPORATED BY REFERENCE) 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016) (INCORPORATED BY

REFERENCE)

52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019) (INCORPORATED BY REFERENCE) 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015) (INCORPORATED BY REFERENCE) 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017) (INCORPORATED BY REFERENCE)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHIL

DRIVING (AUG 2011) (INCORPORATED BY REFERENCE)

52.212-2 INSTRUCTIONS TO OFFERORS- COMMERCIAL ITEMS (JUN 2020) (INCORPORATED BY

REFERENCE)

52.233-1 DISPUTES (MAY 2014)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT-RELATED FELONIES

(DEC 2008)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)

252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)

252.204-7004 LEVEL I ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (FEB 2019)

252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (OCT 2016) 252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR REPORTED CYBER INCIDENT

INFORMATION (OCT 2016)

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016) 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (MAY 2016)

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)—BASIC (MAY 2019)

252.223-7006 PROHIBITION ON STORAGE, TREATMENT, AND DISPOSAL OF TOXIC OR HAZARDOUS MATERIALS—BASIC

(SEP 2014)

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)

252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS (DOD CONTRACTS) (JUN 2013) 252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY (APR 2012)

252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (DEVIATION 2020-

O0004)(FEB 2020)

252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)

252.246-7004 SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OPERATIONS (OCT 2010) ..74

252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA—BASIC (FEB 2019)

52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015)

52.233-9001 DISPUTES – AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (DEC 2016)

I-0001 I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DLA ENERGY JUNE 2009)

I-0002 I102.02 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT -- PAYROLL TAX ADJUSTMENT (DLA

ENERGY JAN 2012)

I-0003 I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY JAN 2012)

I-0004 I116.01 LIABILITY FOR FUEL SPILLS (DLA ENERGY JAN 2012)

I-0005 I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY AUG 2017)

I-0006 I122 USE OF FACILITIES (DLA ENERGY APR 2009)

I-0007 I123 TITLE TO FACILITIES (DLA ENERGY JUL 1991)

I-0008 I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012)

I-0009 I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) IMPLEMENTATION (SEP 2009)

SECTION J- ATTACHMENTS

SECTION K- REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS OR

RESPONDENTS

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (SEP 2007)

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JULY 2016)

52.204-20 PREDECESSOR OF OFFEROR (JULY 2016)

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR

EQUIPMENT (AUG 2020)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE

SERVICES OR EQUIPMENT (AUG 2020)

52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-REPRESENTATION (NOV 2015)

52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELIQUENT TAX LIABILITY OR A FELONY CONVICTION

UNDER ANY FEDERAL LAW (FEB 2016)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS-COMMERCIAL ITEMS (MAR 2020)

52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) ALT I (SEPT 2015)

52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (MAR 2015) 252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (NOV 2011) 252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (OCT 2016) 252.204-7016 COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES—REPRESENTATION (DEC 2019) 252.209-7998 REPRESENTATION REGARDING CONVICTION OF A FELONY CRIMINAL VIOLATION UNDER ANY FEDERAL

OR STATE LAW (MAR 2012) (DEVIATION 2012-O0007)

252.209-7999 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW DEVIATION 2012-00004) {JAN 2012)

252.225-7974 REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME. (DEVIATION 2020- O0005)

K-0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)

K-0002 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)

SECTION L- INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

FAR 52.212-1 INSTRUCTIONS TO OFFERORS –COMMERCIAL ITEMS (OCT 2018)

52.216-1 TYPE OF CONTRACT (APR 1984)

FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)

52.237-1 SITE VISIT (APR 1984)

FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATIONS (FEB 1999) (INCORPORATED BY

REFERENCE)

252.215-7008 ONLY ONE OFFER (JUL 2019) (INCORPORATRED BY REFERENCE)

52.252-6 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

L-0001 L82 WAGE DETERMINATION (DLA ENERGY FEB 2009)

L-0002 L198 PREPROPOSAL CONFERENCE (SERVICES) (DLA ENERGY JUL 2018)

SECTION M-EVALUATION FACTORS FOR AWARD

52.212-2 EVALUATION- COMMERCIAL ITEMS (OCT 2014)

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

M-0001 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997)

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

The services to be furnished during the period specified herein and the unit prices are as follows:

The Contractor shall provide Government-Owned, Contractor-Operated (GOCO) operational, maintenance, management and ground refueling/defueling services in support of NAS JRB DALLAS FT. WORTH, TX.

CONTRACT LINE ITEM 0001 (BASE): CONUS GOCO Alongside Aircraft Refueling, V20000042:

(FIRM-FIXED PRICE)

The Contractor shall provide services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the anticipated period December 1, 2021 through November 30, 2025.

PLACE OF PERFORMANCE: NAS JRB DALLAS FT. WORTH, TX.

The offered price per month for performing these services at the location(s) above is $__________________

ITEM NO. SUPPLIES/SERVICES QUANTITY U/O

0001 MUCG 48 Months

CONTRACT LINE ITEM 0002 (OPTION): CONUS GOCO Alongside Aircraft Refueling, V20000042:

(FIRM-FIXED PRICE)

The Contractor shall provide services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the anticipated period December 1, 2025 through November 30, 2030.

PLACE OF PERFORMANCE: NAS JRB DALLAS FT. WORTH, TX

The offered price per month for performing these services at the location(s) above is $__________________

ITEM NO. SUPPLIES/SERVICES QUANTITY U/O

0002 MUCG 60 Months

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

The Performance Work Statement is hereby incorporated by reference as if fully set forth herein. Refer to Attachment I.

SECTION E – INSPECTION AND ACCEPTANCE

52.246-4 INSPECTION OF SERVICES-FIXED PRICE (AUG 1996)

(a) Definition: “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may --

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may –

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default.

(End of Clause)

QUALITY ASSURANCE PROVISIONS (QAPS) LISTED IN THIS SECTION ARE INCORPORATED IN

FULL TEXT UNDER ATTACHMENT VIII OF THIS SOLICITATION

E-0001 E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION OF SERVICES

(DLA ENERGY JAN 2012)

E-0002 E1.11 QUALITY CONTROL PLAN (DLA ENRGY MAR 2000)

E-0003 E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENGERY APR

2016) E-0004 E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY DEC 2011)

E-0005 E29 INITIAL ON-STATION INSPECTION (DLA ENERGY MAR 1997)

E-0006 E30.01 DESIGNATION OF QUALITY REPRESENTATIVE (DLA ENERGY MAR 1981)

E-0007 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)

SECTION F- DELIVERIES OF PERFORMANCE

52.242-15 STOP WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either –

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for

Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if --

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

F-0001 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY APR 2014)

THIS CONTRACT TEXT ONLY APPLIES TO DLA FUNDED LINE ITEMS.

(a) Contractor Registration. Contractors must register in DIBBS to obtain a login account at https://www.dibbs.bsm.dla.mil. The login account will allow a contractor to register a primary and alternate email address for notifications. Contractors are strongly encouraged to establish a group email address for the primary email address for the contractor’s authorized point of contacts. The registered email addresses will be the only email used by the government to make notifications.

(b) All contractors must have an active System for Award Management (SAM) account, http://www.sam.gov in order to register for DIBBS.

(c) The Contractor shall use DIBBS to receive orders. DLA Energy will not be using DIBBS receipt of quotes capability. All quotations, proposals, bids shall be submitted in accordance with the terms and conditions of the solicitation.

(d) Preparation and Transmission of Orders

(1) The Government may issue an order for a specific delivery or a series of deliveries (e.g., several deliveries during a week). The Government may also elect to issue an order covering a longer period (including monthly orders) and make periodic calls against these orders designating specific delivery dates, times, and quantities.

(2) Only a DLA Energy warranted Contracting Officer can issue an order, either orally or in writing, against a contract. An oral order issued by the warranted Contracting Officer shall provide the required advance notice to the Contractor and the following information: Interim order number; contract number; item number; ceiling price; quantity; delivery location; and the required delivery and/ or service date.

(i) For all product orders, the Contractor will receive an electronically signed written order via DIBBS, within 24 hours or one business day after the warranted Contracting Officer issues an oral order.

(ii) For all service orders, the Contractor will receive an electronically signed written order via DIBBS, within five business days after issuing the oral order.

(iii) Interim order number is subject to change once the electronically signed written order is received by the contractor. The order number on the written order will take precedence over the interim order number, if different.

https://www.dibbs.bsm.dla.mil/ http://www.sam.gov/

(iv) Regardless of the unit price cited on the written order, the office designated to make payments on the written order will pay the applicable unit price in effect under the terms and conditions of the contract.

(v) Once the order has been issued, an email will be sent to the Contractor to provide notice that the order is available on the contract-specific web page. The order will also be submitted to the payment office.

(3) Calls against previously issued orders must be confirmed in writing within 24 hours or one business day via email message. The email confirmation will reference the previously issued order number and item number and designate specific delivery location, dates, and quantity to be delivered against that order.

(4) The Contractor’s nonreceipt of a written or electronic confirmation of an oral order or oral call against a written or electronic order does not relieve the Contractor from its obligation to perform in accordance with the oral order or oral call against a written or electronic order. The Contractor should contact the DLA Energy Contracting Officer if problems are experienced with receipt of the electronic or written confirmation.

F-0002 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA ENERGY

DEC 1991)

During the contract period, 1 December 2021 through 30 November 2025, the Contractor shall provide petroleum storage facilities and services at the following location:

SECTION G-CONTRACT ADMINISTRATION DATA

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

(a) Method of payment.

(1) All payments by the Government under this contract, shall be made by electronic funds transfer (EFT), except as provided in paragraph (a)(2) of this clause. As used in this clause, the term “EFT” refers to the funds transfer and may also include the payment information transfer.

(2) In the event the Government is unable to release one or more payments by EFT, the Contractor agrees to either--

(i) Accept payment by check or some other mutually agreeable method of payment; or

(ii) Request the Government to extend the payment due date until such time as the Government can make payment by EFT (but see paragraph (d) of this clause).

(b) Contractor's EFT information. The Government shall make payment to the Contractor using the EFT information contained in the System for Award Management (SAM). In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to the SAM.

(c) Mechanisms for EFT payment. The Government may make payment by EFT through either the Automated Clearing House (ACH) network, subject to the rules of the National Automated Clearing House Association, or the Fedwire Transfer System. The rules governing Federal payments through the ACH are contained in 31 CFR part 210.

(d) Suspension of payment. If the Contractor's EFT information in the SAM is incorrect, then the Government need not make payment to the Contractor under this contract until correct EFT information is entered into the SAM; and any invoice or contract financing request shall be deemed not to be a proper invoice for the purpose of prompt payment under this contract. The prompt payment terms of the contract regarding notice of an improper invoice and delays in accrual of interest penalties apply.

(e) Liability for uncompleted or erroneous transfers.

(1) If an uncompleted or erroneous transfer occurs because the Government used the Contractor's EFT information incorrectly, the Government remains responsible for--

(i) Making a correct payment;

(ii) Paying any prompt payment penalty due; and

(iii) Recovering any erroneously directed funds.

(2) If an uncompleted or erroneous transfer occurs because the Contractor's EFT information was incorrect, or was revised within 30 days of Government release of the EFT payment transaction instruction to the Federal Reserve System, and--

(i) If the funds are no longer under the control of the payment office, the Government is deemed to have made payment and the Contractor is responsible for recovery of any erroneously directed funds; or

(ii) If the funds remain under the control of the payment office, the Government shall not make payment, and the provisions of paragraph (d) of this clause shall apply.

(f) EFT and prompt payment. A payment shall be deemed to have been made in a timely manner in accordance with the prompt payment terms of this contract if, in the EFT payment transaction instruction released to the Federal Reserve System, the date specified for settlement of the payment is on or before the prompt payment due date, provided the specified payment date is a valid date under the rules of the Federal Reserve System.

(g) EFT and assignment of claims. If the Contractor assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Contractor shall require as a condition of any such assignment, that the assignee shall register separately in the SAM and shall be paid by EFT in accordance with the terms of this clause. Notwithstanding any other requirement of this contract, payment to an ultimate recipient other than the Contractor, or a financial institution properly recognized under an assignment of claims pursuant to Subpart 32.8, is not permitted. In all respects, the requirements of this clause shall apply to the assignee as if it were the

Contractor. EFT information that shows the ultimate recipient of the transfer to be other than the Contractor, in the absence of a proper assignment of claims acceptable to the Government, is incorrect EFT information within the meaning of paragraph (d) of this clause.

(h) Liability for change of EFT information by financial agent. The Government is not liable for errors resulting from changes to EFT information made by the Contractor's financial agent.

(i) Payment information. The payment or disbursing office shall forward to the Contractor available payment information that is suitable for transmission as of the date of release of the EFT instruction to the Federal Reserve System. The Government may request the Contractor to designate a desired format and method(s) for delivery of payment information from a list of formats and methods the payment office is capable of executing.

However, the Government does not guarantee that any particular format or method of delivery is available at any particular payment office and retains the latitude to use the format and delivery method most convenient to the Government. If the Government makes payment by check in accordance with paragraph (a) of this clause, the Government shall mail the payment information to the remittance address contained in the SAM.

(End of Clause)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING

REPORTS (DEC 2018)

(a) Definitions. As used in this clause—

“Contract financing payment” means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.

(1) Contract financing payments include—

(i) Advance payments;

(ii) Performance-based payments;

(iii) Commercial advance and interim payments;

(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress Payments;

(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232-25, Prompt Payment, is used.

(2) Contract financing payments do not include—

(i) Invoice payments;

(ii) Payments for partial deliveries; or

(iii) Lease and rental payments.

“Electronic form” means any automated system that transmits information electronically from the initiating system to affected systems.

“Invoice payment” means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.

(1) Invoice payments include—

(i) Payments for partial deliveries that have been accepted by the Government;

(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;

(iii) For purposes of subpart 32.9 only, all payments made under the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, and the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(iv) Interim payments under a cost-reimbursement contract for services when Alternate I of the clause at 52.232-25, Prompt Payment, is used.

(2) Invoice payments do not include contract financing payments.

“Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract or task or delivery order.

“Receiving report” means the data prepared in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense Federal Acquisition Regulation Supplement.

(b) Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.

(c) Submit payment requests and receiving reports to WAWF in one of the following electronic formats:

(1) Electronic Data Interchange.

(2) Secure File Transfer Protocol.

(3) Direct input through the WAWF website.

(d) The Contractor may submit a payment request and receiving report using methods other than WAWF only when—

(1) The Contractor has requested permission in writing to do so, and the Contracting Officer has provided instructions for a temporary alternative method of submission of payment requests and receiving reports in the contract administration data section of this contract or task or delivery order;

(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);

(3) DoD makes payment on a contract or task or delivery order for rendered health care services using the TRICARE Encounter Data System; or

(4) The Governmentwide commercial purchase card is used as the method of payment, in which case submission of only the receiving report in WAWF is required.

(e) Information regarding WAWF is available at https://wawf.eb.mil/.

(f) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(End of clause)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall— https://wawf.eb.mil/ http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm#252.232-7003 http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm#252.232-7003

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

NOT APPLICABLE

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

INVOICE 2-in-1 (SERVICES ONLY)

(iii) For customary progress payments based on costs incurred, submit a progress paymentrequest.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SL4701 Issue By DoDAAC SPE603 Admin DoDAAC** SPE603 Inspect By DoDAAC SE5N0R; Extension REFUEL Ship To Code N/A Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) SPE603; Extension REFUEL Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

NOT APPLICABLE

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

DLA Energy Help Desk Email: bsme.helpdesk@dla.mil (phone) (800)446-4950

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)

mailto:bsme.helpdesk@dla.mil

Each invoice submitted for payment under this contract shall be identified by an individual invoice number.

The number shall not be duplicated on subsequent invoices. Duplicate invoice numbers or invoices that do not include numbers may be rejected.

G-0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY JAN

2017)

Remittances shall be mailed only at the Government’s option or where an exception to payment by Electronic Funds Transfer (EFT) applies. (See the PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT or the PAYMENT BY ELECTRONIC FUNDS TRANSFER - OTHER THAN SYSTEM FOR AWARD MANAGEMENT clause.)

Offeror shall indicate below the complete mailing address (including the nine-digit zip code) to which remittances should be mailed if such address is other than that shown in Block 15a (Standard Form (SF) 33) for noncommercial items or Block 17a (SF 1449) for commercial items. In addition, if offeror did not incorporate its nine-digit zip code in the address shown in Block 15a of the SF 33 or in Block 17a of the SF 1449, the offeror shall enter it below:

(a) Payee Name (Contractor): | | | | | | | | | | | | | | | | | | | | | | | | |

(DO NOT EXCEED 25 CHARACTERS)

(b) Check Remittance Address:

(DO NOT EXCEED 30 CHARACTERS PER LINE)

(c) Narrative Information (special instructions).

(DO NOT EXCEED 153 CHARACTERS)

G-0003 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)

The Property Administrator for product handled under the terms of the contract will be designated by the Director, Defense Logistics Agency Energy (DLA Energy).

G-0004 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)

(a) The Defense Fuel Region to which reference is made herein is the DLA Energy Americas East.

(b) The Defense Fuel Office to which reference is made herein is the DLA Energy Americas East.

(c) The Commander of the Defense Fuel Region or his designee, appointed above, is the authorized representative of the Commander, Defense Logistics Agency Energy (DLA Energy).

SECTION H-SPECIAL CONTRACT REQUIREMENTS

H-0001 H11 GUARD SERVICE (DLA ENERGY MAR 1982)

(a) In the event the Government requires guard service and/or other protective services or facilities not otherwise provided by the Contractor pursuant to the terms of this contract, the Government shall have the right--

(1) To provide such service; or

(2) To require the Contractor to provide such guard service; and/or

(3) To require the Contractor to provide such other protective services or facilities.

(b) The actual cost of providing said services or facilities under (2) and/or (3) above will be for the account of the Government and will be recognized by a modification to this contract.

H-0002 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA

ENERGY JAN 2012)

(a) Immediately upon the discovery of a petroleum spill, leak, or seepage involving Defense Logistics Agency Energy (DLA Energy) owned product, the Contractor shall notify, by telephone, (1) the Quality Representative,

(2) the designated Defense Energy Region, and (3) the Administrative Contracting Officer (ACO). In addition, if the said spill, leak, or seepage has reached, or if it might possibly reach, navigable waters, the Contractor shall immediately notify the Coast Guard by telephone (800) 424-8802, the appropriate Federal and State officials designated in State laws, and the ACO.

(b) Immediately upon discovery of a petroleum spill, leak, or seepage, the Contractor shall take all practicable measures available to contain and prevent further spreading of such spill, leak, or seepage. Measures taken by the Contractor will be in compliance with all local, State, and Federal laws and regulations.

(c) Any Contractor whose terminal stores product exclusively for DLA Energy use shall prepare and submit an approved Spill Prevention Control and Countermeasure Plan, Oil Pollution Prevention Operations Manual, and Oil Spill Contingency Plan, as applicable. These documents shall be submitted to the ACO and the Defense Energy Region specified in the DESIGNATION OF THE DEFENSE ENERGY REGION contract text of this solicitation as soon as practicable after contract award, but no later than 60 days after award notification. The Contingency Plan shall include, but not be limited to, (1) Contractor in-house capability and facilities, or (2) the preselection of a local agency, cooperative, or firm capable of and willing to provide cleanup services of this nature.

(d) The Contractor shall be responsible for maintaining current telephone numbers of the agencies cited herein and in the Contingency Plan upon commencement of the contract period.

H-0003 H51.01 INSURANCE REQUIREMENTS (AARD) (DLA ENERGY JAN 2012)

(a) The General Liability Workmen's Compensation and Automobile Liability Insurance to be procured and maintained by the Contractor pursuant to the wording of the INSURANCE - WORK ON A GOVERNMENT INSTALLATION contract text shall provide at least the following minimum coverage:

GENERAL LIABILITY INSURANCE.

Bodily Injury.........................................................................................AT LEAST $500,000 per person Property Damage...................................................................................AT LEAST $ 50,000 per occurrence Workmen's Compensation.....................................................................AT LEAST $100,000 except in states with exclusive monopolistic funds which do not permit the writing of workmen's compensation by private carriers (Nevada, North Dakota, Ohio, Oregon, Washington, West Virginia, and Wyoming).

AUTOMOBILE LIABILITY INSURANCE.

Bodily Injury.........................................................................................AT LEAST $200,000 per person AT LEAST $500,000 per occurrence Property Damage...................................................................................AT LEAST $ 20,000 per accident

(b) Within 30 days from the date of award, or upon request by the Contracting Officer, the Contractor shall submit the required certificates of insurance to the Contracting Officer.

H-0004 H51.03 INSURANCE REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS

(DLA ENERGY JAN 2012)

(a) The General Liability Worker's Compensation and Automobile Liability Insurance to be procured and maintained by the Contractor and any subcontractors pursuant to the wording of the INSURANCE - WORK ON A GOVERNMENT INSTALLATION contract text shall provide at least the following minimum coverage:

GENERAL LIABILITY INSURANCE

Bodily Injury......................................................................................... AT LEAST $100,000 per person AT LEAST $1,000,000 per occurrence Property Damage...............................................................................… AT LEAST $1,000,000 per occurrence Worker's Compensation..................................................................…... AT LEAST $100,000 except in states with exclusive monopolistic funds which do not permit the writing of workmen's compensation by private carriers (Nevada, North Dakota, Ohio, Oregon, Washington, West Virginia, and Wyoming).

(Longshore and Harbor Workers' Compensation must also be provided when applicable.)

AUTOMOBILE LIABILITY INSURANCE.

Bodily Injury.........................................................................................AT LEAST $200,000 per person AT LEAST $500,000 per occurrence Property Damage..............................................................................….AT LEAST $ 20,000 per occurrence

(b) Prior to the commencement of work hereunder, at the request of the Contracting Officer, the Contractor shall submit the required certificates of insurance to the Contracting Officer.

SECTION I-CONTRACT CLAUSES

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(JUN 2016)

(a) Definitions. As used in this clause--

“Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.

“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

“Safeguarding” means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .