Amendment 0006.pdf
PDF 61 KB Posted
- Solicitation number
- SPE60320R0517
- Issued by
-
Defense Logistics Agency Energy
About this file
This amendment modifies a solicitation for bulk petroleum services at Naval Air Station Joint Reserve Base Dallas/Fort Worth, Texas. The contractor will provide refueling services and maintenance of refueling vehicles and equipment on base. The amendment provides updated answers to technical questions, revises requirements for listing contractor vehicles and equipment, updates the wage determination, and modifies various sections of the performance work statement and its appendices related to refueling operations and maintenance. Negotiations for the firm-fixed price contract are scheduled to open on February 22, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF1449 Conformed 5-10-21.pdf | ||
| Amendment 0009.pdf | ||
| QA.pdf | ||
| Amendment 0008.pdf | ||
| Amendment 0007.pdf | ||
| WD 2015-5231 Rev 16 12-21-20.pdf | ||
| PWS January 06 2021 with Changes.pdf | ||
| SF1449 Conformed 1-28-21.pdf | ||
| Amendment 0005.pdf | ||
| SF1449 Conformed Oct 1 2020.pdf | ||
| Attachment VI-DLA Form 2019.pdf | ||
| SF1449 Conformed Sept 22 2022.pdf | ||
| Amendment 0004.pdf | ||
| Technical QA.pdf | ||
| PWS Sept 22 2020.pdf | ||
| Contracting QA.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Attachment II PPQ.pdf | ||
| Attachment VII QAPs.pdf | ||
| Attachment V WD.pdf | ||
| Attachment VI Form 19.3.pdf | ||
| Attachment I PWS.pdf | ||
| QAP E0002 E1.11.pdf | ||
| QAP E0007 E35.pdf | ||
| Attachment IV PP References.pdf | ||
| QAP E0003 E22.pdf | ||
| QAP E0004 E28.pdf | ||
| Attachment III PP Consent Form.pdf | ||
| SF1449.pdf | ||
| QAP E0005 E29.pdf | ||
| QAP E0001 E1.01.pdf | ||
| QAP E0006 E30.01.pdf |
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE603 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60320R0517
X
2020 JUL 15
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 3 PAGES
SPE60320R0517 - 0006
The purpose of Amendment 0006 is to perform the following:
Revise answer to the Technical Question #1 and provide an updated copy of the RFP.
Q #1: For Volume I, is item ii Contractor Furnished Vehicles a separate submission in addition to the Technical Management Proposal or can this be integrated into Sub-Factor 8 of the Technical Proposal? If it is a separate submission, is the 2-page limit in addition to the 80 pages for the Technical Proposal?
Answer: There is no page limit for Contractor Furnished Vehicles. Please see changes listed in Volume I, Paragraph ii Contractor Furnished Vehicles listed under Addendum to FAR 52.212-1 under Section L of the RFP.
Revise volume I, paragraph ii Contractor Furnished Vehicles, listed under Addendum to FAR 52.212-1 under Section L of the RFP to read: “Contractor Furnished Vehicles (No Page Limit)- Offerors shall include in its technical proposal the make, model, manufacture date, capabilities (relevant to the PWS), specifications, and maintenance/inspection records (oil changes, meter calibration certifications, tire changes, mileage, hours of operation, filter changes, and accident history) of Contractor-furnished vehicles and equipment. Offerors shall also include contingency plans for major/minor breakdowns or unavailability of Contractor-furnished equipment such as vehicles, pantographs, and/or hose carts that ensure no disruption of support or inability to meet the contract requirements. These contingency plans must include plans for varying quantities of unavailable equipment; such as one refueler out of service; two refuelers out of service; three to four or more, etc.”
Revise volume III, Wage Determination, listed under Addendum to FAR 52.212-1 under Section L of the RFP to: “Wage Determination (See Section J, Attachments, Wage Determination No: 2015-5231, Revision No: 16, Dated: 12/21/2020.
Pursuant to FAR 52.222-41 Service Contract Labor Standards (Aug 2018), all pricing must be reflective of current wage rates and fringe benefits which are effective or will be effective during any period in which the contract is being performed.”
Remove typographical error from Sub-factor 7 Training, listed under Addendum to FAR 52.212-2 under Section M of the RFP to read: “Technical, managerial, and operational details to ensure contractor personnel have requisite skills and associated training to accomplish all government requirements. The proposal must provide procedures to be implemented to ensure all contractor personnel are qualified and certified to accomplish all required tasks. The proposal must identify required courses and frequencies for maintaining personnel competence and method of documentation and certification.”
Revise PWS sections: C-1.6, C-1.7.1, C-1.7.2.2, C-1.7.3.1, C-1.7.4.1, C-1.8.1, C-1.8.2, C-1.8.2.1, C-1.8.5.1, C-1.9, C-1.11, C-1.12, C-2.4.1, C-2.4.2, C-2.8, C-2.8.4, C-2.8.5, Appendix A-Table 1, Appendix A-Table 3, Appendix A-Table 5, Appendix A-Table 6, Appendix B.
Negotiations will open on February 22, 2021.
All other terms and conditions remain the same.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES
SPE60320R0517 - 0006
SECTION J - LIST OF ATTACHMENTS
List of Attachments
File Name Description ATTACH_PWS_January_6
__2021_with_changes PWS Ja
ATTACH_SF1449_Confor med_1_28_21
SF1449
ATTACH_WD_2015_5231
_Rev_16_Dated_12_21_20
WD 2015
File details come from the government source that posted it. Updated .