ATTACHMENT_3_-_Price_Proposal_Workbook_2018-06-08_(Protected).xlsx
XLSX spreadsheet 35 KB Posted
- Solicitation number
- SPE600-17-R-0505
- Issued by
-
Defense Logistics Agency Energy
About this file
Attachment 3 Price Proposal Workbook
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 WORKSHEET
| COMPANY & LOCATION: | PROPOSAL VERSION NO.: |
| PREPARER NAME: | DATE PREPARED: |
| CLIN | SERVICES/DELIVERABLE | PWS Section | Quantity Unit | Monthly Unit price | Total Price (Monthly Unit Price x 48) | ||
| CLIN 0001 - Perform all sevices & provide deliverables in accordance with PWS Sections 5.1, 5.2, 5.3, and 5.4 | 48 months | $0.00 | $0.00 | ||||
| Project Management | Included in CLIN0001 48 Month Services Pricing (above) | ||||||
| 0001 | N/A | Project Management Plan (including Technical Approach and Master schedule) | 5.1.1.-5.1.3 | ||||
| Health and Safety Plan | 5.1.4. | ||||||
| Contractor’s Progress, Status and Management Report | 5.1.5. | ||||||
| Post-Award Meeting | 5.1.6. | ||||||
| Project Management Review Meetings | 5.1.7. | ||||||
| Annual Review Meetings | 5.1.8. | ||||||
| Regulatory Support Meetings | 5.1.9. | ||||||
| Public Meetings | 5.1.10. | ||||||
| Permits | 5.1.11. | ||||||
| Coordination of Activities (e.g. worksite activities, waste management, and laboratory/analytical services) | 5.1.12.-5.1.14. | ||||||
| Environmental Remediation Systems Operation and Maintenance | |||||||
| 0001 | N/A | Contractor Transition: Initial | 5.2.1. | ||||
| Operations and Maintenance | 5.2.2. | ||||||
| Systems Sampling and Analysis | 5.2.3. | ||||||
| Contractor Transition: Closing | 5.2.4. | ||||||
| Monitoring and Reporting of Environmental Conditions | |||||||
| 0001 | N/A | Monitoring and Reporting | 5.3. | ||||
| Data Management | |||||||
| 0001 | N/A | Document Repository | 5.4.1. | ||||
| Spatial Data Requirements - Utility Decommissioning | 5.4.2. | ||||||
| Geographical Information Systems and Data Management Services | 5.4.3. | ||||||
| Contractor Manpower Reporting | 5.4.4. | ||||||
| Labor, Equipment, and Materials | |||||||
| 0001 | N/A | All Labor, Equipment, and Materials for the Site needed to perform CLIN 0001 | 5.1.-5.4. | ||||
| CLIN 0002 - Perform all services & provide deliverables when ordered by the Contracting Officer at | |||||||
| pricing stated in the Reference Items and in accordance with PWS Sections 5.5. and 5.6. | 5.5. & 5.6. | See CLIN 0002 WORKSHEET (Reference Item List) | |||||
| Instructions to Complete Form: Offeror must fill out all cells shaded in green. Other cells are locked for editing. Offeror must identify all assumptions and exceptions in Section I of Technical Management Proposal. | |||||||
| Note: Total Price does not include discretionary elements of Solicitation including 1) Optional 6-month Task Order to extend contract and 2) CLIN 0002 services. |
&"-,Bold"CLIN 0001 WORKSHEET FOR SPE600-17-R-0505
&9Page &P of &N
CLIN 0002 WORKSHEET
| COMPANY & LOCATION: | PROPOSAL VERSION NO.: |
| PREPARER NAME: | DATE PREPARED: |
| REFERENCE ITEM | ITEM DESCRIPTION | |||||
| (Elements 5.5 and 5.6) | 48-MONTHS ESTIMATED QUANTITY | UNIT | UNIT PRICE | Total Price (48-Months Estimated Quantity x Unit Price) | ||
| SERVICES | ||||||
| 001 | Archeologist price per hour | 8 | EA | $0.00 | $0.00 | |
| 002 | Asbestos Site Supervisor or Safety Officer price per hour | 16 | EA | $0.00 | $0.00 | |
| 003 | Asbestos worker price per hour | 16 | EA | $0.00 | $0.00 | |
| 004 | Biologist/Botanist 1 price per hour | 48 | EA | $0.00 | $0.00 | |
| 005 | Biologist/Botanist 2 price per hour | 32 | EA | $0.00 | $0.00 | |
| 006 | Buyer price per hour | 480 | EA | $0.00 | $0.00 | |
| 007 | Certified Industrial Hygenist price per hour | 8 | EA | $0.00 | $0.00 | |
| 008 | Chemist 1 price per hour | 160 | EA | $0.00 | $0.00 | |
| 009 | Chemist 2 price per hour | 400 | EA | $0.00 | $0.00 | |
| 010 | Chemist 3 price per hour | 320 | EA | $0.00 | $0.00 | |
| 011 | Cost Accountant price per hour | 480 | EA | $0.00 | $0.00 | |
| 012 | Drafter (including CAD, hardware & software) price per hour | 960 | EA | $0.00 | $0.00 | |
| 013 | Drill Rig Operator price per hour | 8 | EA | $0.00 | $0.00 | |
| 014 | Engineer 1 (Staff) price per hour | 960 | EA | $0.00 | $0.00 | |
| 015 | Engineer 2 (Project) price per hour | 480 | EA | $0.00 | $0.00 | |
| 016 | Engineer 3 (Senior) price per hour | 320 | EA | $0.00 | $0.00 | |
| 017 | Environmental Scientist 1 price per hour | 480 | EA | $0.00 | $0.00 | |
| 018 | Environmental Scientist 2 price per hour | 480 | EA | $0.00 | $0.00 | |
| 019 | Environmental Scientist 3 price per hour | 320 | EA | $0.00 | $0.00 | |
| 020 | Environmental Technician price per hour | 480 | EA | $0.00 | $0.00 | |
| 021 | Geologist 1 price per hour | 960 | EA | $0.00 | $0.00 | |
| 022 | Geologist 2 price per hour | 480 | EA | $0.00 | $0.00 | |
| 023 | Geologist 3 price per hour | 320 | EA | $0.00 | $0.00 | |
| 024 | Health and Safety Officer price per hour | 8 | EA | $0.00 | $0.00 | |
| 025 | Heavy equipment mechanic price per hour | 32 | EA | $0.00 | $0.00 | |
| 026 | Heavy equipment operator price per hour | 64 | EA | $0.00 | $0.00 | |
| 027 | Hydrogeologist 1 price per hour | 128 | EA | $0.00 | $0.00 | |
| 028 | Hydrogeologist 2 price per hour | 64 | EA | $0.00 | $0.00 | |
| 029 | Laborer price per hour | 960 | EA | $0.00 | $0.00 | |
| 030 | Project Manager price per hour | 128 | EA | $0.00 | $0.00 | |
| 031 | QA/QC Officer price per hour | 64 | EA | $0.00 | $0.00 | |
| 032 | Remediation System Operator price per hour | 8 | EA | $0.00 | $0.00 | |
| 033 | Secretary price per hour | 480 | EA | $0.00 | $0.00 | |
| 034 | Site Labor Foreman price per hour | 128 | EA | $0.00 | $0.00 | |
| 035 | Toxicologist 1 price per hour | 64 | EA | $0.00 | $0.00 | |
| 036 | Toxicologist 2 price per hour | 64 | EA | $0.00 | $0.00 | |
| 037 | Toxicologist 3 price per hour | 64 | EA | $0.00 | $0.00 | |
| 038 | Traffic Control Engineer price per hour | 96 | EA | $0.00 | $0.00 | |
| DRILLING, WELL INSTALLATION, AND OTHER GEOLOGIC SERVICES | ||||||
| 039 | MONITORING WELL INSTALLATION, Mobilization Cost | 8 | EA | $0.00 | $0.00 | |
| 040 | Monitoring Well, Price per 2" diameter MW up to 10 feet | 20 | EA | $0.00 | $0.00 | |
| 041 | Monitoring Well, Cost per foot of 2" MW from 11 to 20 feet | 200 | EA | $0.00 | $0.00 | |
| 042 | Monitoring Well, Cost per foot of 2" MW from 21 to 60 feet | 200 | EA | $0.00 | $0.00 | |
| 043 | Monitoring Well, Cost per foot of 2" MW from 61 to 150 feet | 200 | EA | $0.00 | $0.00 | |
| 044 | Monitoring Well, Price per 4" diameter MW up to 10 feet | 16 | EA | $0.00 | $0.00 | |
| 045 | Monitoring Well, Cost per foot of 4" MW from 11 to 20 feet | 160 | EA | $0.00 | $0.00 | |
| 046 | Monitoring Well, Cost per foot of 4" MW from 21 to 60 feet | 160 | EA | $0.00 | $0.00 | |
| 047 | Monitoring Well, Cost per foot of 4" MW from 61 to 150 feet | 160 | EA | $0.00 | $0.00 | |
| 048 | Monitoring Well, Price per 6" diameter recovery well up to 10 feet | 4 | EA | $0.00 | $0.00 | |
| 049 | Monitoring Well, Cost per foot of 6" recovery well from 11 to 20 feet | 40 | EA | $0.00 | $0.00 | |
| 050 | Monitoring Well, Cost per foot of 6" recovery well from 21 to 60 feet | 40 | EA | $0.00 | $0.00 | |
| 051 | Monitoring Well, Cost per foot of 6" recovery well from 61 to 150 feet | 40 | EA | $0.00 | $0.00 | |
| 052 | Monitoring Well, Install flush mount box for 2-in to 6-in well | 20 | EA | $0.00 | $0.00 | |
| 053 | Monitoring Well, Install above grade (4x4) monitoring well casing and four bollards | 20 | EA | $0.00 | $0.00 | |
| 054 | WELL DECOMMISSIONING, Mobilization Cost | 4 | EA | $0.00 | $0.00 | |
| 055 | Decommission 2" dia. vertical well, grout in place, cost per foot | 16 | EA | $0.00 | $0.00 | |
| 056 | Decommission 4" dia. vertical well, grout in place, cost per foot | 8 | EA | $0.00 | $0.00 | |
| 057 | Decommission 6" dia. vertical well, grout in place, cost per foot | 4 | EA | $0.00 | $0.00 | |
| 058 | Decommission 2" dia. vertical well, overdrill and grout, cost per foot | 16 | EA | $0.00 | $0.00 | |
| 059 | Decommission 4" dia. vertical well, overdrill and grout, cost per foot | 8 | EA | $0.00 | $0.00 | |
| 060 | Decommission 6" dia. vertical well, overdrill and grout, cost per foot | 4 | EA | $0.00 | $0.00 | |
| 061 | WELL DEVELOPMENT including all equipment and supplies, per day | 12 | EA | $0.00 | $0.00 | |
| 062 | WELL INSPECTION - Down Hole Camera Inspection, vertical well, to include report of findings, per Half Day | 4 | EA | $0.00 | $0.00 | |
| 063 | CPT (Cone Penetration Testing), Mobilization for price per day | 4 | EA | $0.00 | $0.00 | |
| 064 | CPT BORING, price per boring up to 10 feet | 20 | EA | $0.00 | $0.00 | |
| 065 | CPT BORING, cost per foot from 11 to 20 feet | 200 | EA | $0.00 | $0.00 | |
| 066 | CPT BORING, cost per foot from 21 to 60 feet | 200 | EA | $0.00 | $0.00 | |
| 067 | CPT BORING, cost per foot greater than 60 feet | 200 | EA | $0.00 | $0.00 | |
| 068 | DPT (Direct Push Technology) or Geoprobe, Mobilization price per day | 4 | EA | $0.00 | $0.00 | |
| 069 | DPT BORING, price per boring up to 10 feet | 20 | EA | $0.00 | $0.00 | |
| 070 | DPT BORING, cost per foot from 11 to 20 feet | 200 | EA | $0.00 | $0.00 | |
| 071 | DPT BORING, cost per foot from 21 to 60 feet | 200 | EA | $0.00 | $0.00 | |
| 072 | DPT BORING, cost per foot greater than 60 feet | 200 | EA | $0.00 | $0.00 | |
| 073 | SOIL & GAS SURVEY - Mobilization cost | 8 | EA | $0.00 | $0.00 | |
| 074 | SOIL & GAS SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, DPT Rig, including report of findings | 4 | EA | $0.00 | $0.00 | |
| 075 | SOIL & GAS SURVEY - Price per unit (10 points/unit) - 5 to 15 feet depth, DPT Rig, including report of findings | 4 | EA | $0.00 | $0.00 | |
| 076 | SOIL & GAS SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, hand auger, including report of findings | 4 | EA | $0.00 | $0.00 | |
| 077 | SOIL & GAS SURVEY - Price per unit (10 points/unit) - 5 to 15 feet depth, hand auger, including report of findings | 4 | EA | $0.00 | $0.00 | |
| 078 | SOIL BORING - Mobilization cost | 8 | EA | $0.00 | $0.00 | |
| 079 | SOIL BORING - Price (per boring) up to 10 feet | 40 | EA | $0.00 | $0.00 | |
| 080 | SOIL BORING - Cost per foot from 11 to 20 feet | 400 | EA | $0.00 | $0.00 | |
| 081 | SOIL BORING - Cost per foot from 21 to 60 feet | 800 | EA | $0.00 | $0.00 | |
| 082 | SOIL BORING WITH UVOST - Continuous sampling (by foot) | 800 | EA | $0.00 | $0.00 | |
| 083 | SURVEY - Boring/Well location survey (price per 10) | 16 | EA | $0.00 | $0.00 | |
| 084 | SURVEY - Physical Survey price per half day (includes surveyor, crew, and equipment) | 12 | EA | $0.00 | $0.00 | |
| 085 | SURVEY - Geophysical/GPR Survey to include in report of findings, Price per Half Day | 4 | EA | $0.00 | $0.00 | |
| 086 | UTILITY CLEARANCE - Geophysical/GPR Survey, Price per unit (10,000 linear feet) to include in report of findings | 16 | EA | $0.00 | $0.00 | |
| MISCELLANEOUS | ||||||
| 087 | Absorbent pads, booms, disposable safety materials - 1 LOT | 800 | EA | $0.00 | $0.00 | |
| 088 | Brass Long-shank monitoring well locks Keyed alike, price per 10 | 12 | EA | $0.00 | $0.00 | |
| 089 | Disposal, Hazardous (for VOCs) per gallon | 40 | EA | $0.00 | $0.00 | |
| 090 | Disposal, Hazardous (for heavy metals) per gallon | 80 | EA | $0.00 | $0.00 | |
| 091 | Disposal, Hazardous (for VOCs) per Drum | 4 | EA | $0.00 | $0.00 | |
| 092 | Disposal, Hazardous (for heavy metals) per Drum | 4 | EA | $0.00 | $0.00 | |
| 093 | Disposal, Non-hazardous soil, per Ton | 4 | EA | $0.00 | $0.00 | |
| 094 | Camera, Digital (Nikon SRF or equivalent) price per day | 4 | EA | $0.00 | $0.00 | |
| 095 | Digitial Photographic documentation - Electronic Submittal to DLA | 12 | EA | $0.00 | $0.00 | |
| 096 | Disposable Bailers price per unit | 160 | EA | $0.00 | $0.00 | |
| 097 | Disposable Tubing (3/8-in, 500ft) | 32 | EA | $0.00 | $0.00 | |
| 098 | Drum, 55-Gallon DOT Approved, Steel or Plastic | 80 | EA | $0.00 | $0.00 | |
| 099 | Dump Truck, 5-7 CY with operator, price per day | 8 | EA | $0.00 | $0.00 | |
| 100 | Contractor's processing and payment of various permits and fees (i.e. applications, regulatory assessments, easements, right of entry, utilities), per $1000 value | 96 | EA | $0.00 | $0.00 | |
| 101 | Encore Sample Container or equivalent | 240 | EA | $0.00 | $0.00 | |
| 102 | Excavator delivery | 4 | EA | $0.00 | $0.00 | |
| 103 | Excavator, minimum 19,000-lbs up to 25,000-lbs, price per day | 20 | EA | $0.00 | $0.00 | |
| 104 | Excavator, Mini-excavator (3500 lb) delivery | 4 | EA | $0.00 | $0.00 | |
| 105 | Excavator, Mini-excavator (3500 lb) price per day | 20 | EA | $0.00 | $0.00 | |
| 106 | Field gas chromatograph price per day | 4 | EA | $0.00 | $0.00 | |
| 107 | Flame Ionization Detector price per day | 160 | EA | $0.00 | $0.00 | |
| 108 | Frac Tank (double walled 20,000 gallon capacity) price per month | 4 | EA | $0.00 | $0.00 | |
| 109 | Frac Tank delivery charge | 4 | EA | $0.00 | $0.00 | |
| 110 | Subcontract Tank Cleaning (Frac Tank) - 1 each | 4 | EA | $0.00 | $0.00 | |
| 111 | Generator (4000 watt) price per day | 80 | EA | $0.00 | $0.00 | |
| 112 | HDPE fittings (flanged and welded fittings and valves) - 1 LOT | 800 | EA | $0.00 | $0.00 | |
| 113 | HDPE piping (1.5-in to 2-in diameter) per 10 feet | 80 | EA | $0.00 | $0.00 | |
| 114 | Hydroseeding - per 100 sf (includes all labor and materials using standard seed mixes) | 504 | EA | $0.00 | $0.00 | |
| 115 | Lawn mower, walk-behind, rental price per day | 192 | EA | $0.00 | $0.00 | |
| 116 | Monitoring well skimming sock 1.5"x2', 20 per pack, including installation materials up to 70 ft | 8 | EA | $0.00 | $0.00 | |
| 117 | Oil/Water interface probe price per day | 160 | EA | $0.00 | $0.00 | |
| 118 | Oxygen Analyzer / Explosimeter Combustible Gas Monitor price per day | 160 | EA | $0.00 | $0.00 | |
| 119 | Photoionization Detector price per day | 240 | EA | $0.00 | $0.00 | |
| 120 | Pickup Truck (1/2 ton) price per day including fuel | 320 | EA | $0.00 | $0.00 | |
| 121 | Power tools or other small equipment not otherwise specified (auger, pumps, meters, consumables, etc.), purchase of 1 LOT | 48 | EA | $0.00 | $0.00 | |
| 122 | PVC Piping, 1" or 2" diameter, price per foot | 400 | EA | $0.00 | $0.00 | |
| 123 | PVC Piping, 4" diameter, price per foot | 200 | EA | $0.00 | $0.00 | |
| 124 | PVC Piping, 6" diameter, price per foot | 40 | EA | $0.00 | $0.00 | |
| 125 | PVC fittings - 1 LOT | 200 | EA | $0.00 | $0.00 | |
| 126 | Pressure washer (gas or electric) rental price per day | 48 | EA | $0.00 | $0.00 | |
| 127 | Radon Survey Meter price per day | 20 | EA | $0.00 | $0.00 | |
| 128 | Roll-Off Container with liner and cover, Delivery and monthly rental, 20 CY, price per bin | 16 | EA | $0.00 | $0.00 | |
| 129 | Rough Terrain/Off-Road Utility Vehicle (e.g. Gator) price per day | 20 | EA | $0.00 | $0.00 | |
| 130 | Silt Fence price per 50 feet (Installed) | 400 | EA | $0.00 | $0.00 | |
| 131 | Skid steer rental price per day | 20 | EA | $0.00 | $0.00 | |
| 132 | Straw Bale, including installation | 400 | EA | $0.00 | $0.00 | |
| 133 | Straw Wattle (8.5"x25' or equivalent), includes installation | 800 | EA | $0.00 | $0.00 | |
| 134 | Super Silt Fence price per 50 feet, includes installation | 8 | EA | $0.00 | $0.00 | |
| 135 | Supplies, Field Activity (Consumables such as PPE, wooden stakes, spray paint, flagging tape, wire, etc.) - 1 LOT | 576 | EA | $0.00 | $0.00 | |
| 136 | Supplies, Sampling/Monitoring, (Consumables such as gloves, DI water, bailer cording, etc.) - 1 LOT | 576 | EA | $0.00 | $0.00 | |
| 137 | Tedlar Bags price per dozen | 4 | EA | $0.00 | $0.00 | |
| 138 | Temporary Berms or Spill Containment (12'x50'), each | 4 | EA | $0.00 | $0.00 | |
| 139 | Temporary restroom & sink, delivery, installed, with service price per week | 16 | EA | $0.00 | $0.00 | |
| 140 | Traffic control 1 truck and 1 laborer price per day | 96 | EA | $0.00 | $0.00 | |
| 141 | Troll 9500 Water Quality Meter w/100 feet of cable or equivalent, price per week | 40 | EA | $0.00 | $0.00 | |
| 142 | Utility truck price per day | 80 | EA | $0.00 | $0.00 | |
| 143 | Vacuum truck (70 BBL) with operator price per half day | 64 | EA | $0.00 | $0.00 | |
| 144 | Water level meter price per day | 320 | EA | $0.00 | $0.00 | |
| 145 | Water tank (single walled 2,500 gallon) price per month | 8 | EA | $0.00 | $0.00 | |
| 146 | Water Tank delivery charge | 8 | EA | $0.00 | $0.00 | |
| 147 | Water truck with operator price per day | 40 | EA | $0.00 | $0.00 | |
| 148 | Well Caps (2-in and 4-in) | 160 | EA | $0.00 | $0.00 | |
| REPORTS AND RESPONSE | ||||||
| 149 | INVENTORY/ASSESSMENT REPORT, Lump Sum Price, (assume less 20 hours LOE, basic figures/photos, and includes all preparation, duplication, and distribution) | 32 | EA | $0.00 | $0.00 | |
| 150 | TRIP REPORT-Response to Off-Site Location (less than 50 miles from Site), 1 Traveler per Day including Trip Report, no lodging or airfare required | 32 | EA | $0.00 | $0.00 | |
| 151 | TRIP REPORT - Response to Off-Site Location (more than 50 & up to 125 miles from Site), 1 Traveler per Day, no lodging or airfare required | 32 | EA | $0.00 | $0.00 | |
| 152 | TRIP REPORT - Response to Off-Site Location (more than 50 & up to 125 miles from Site), 1 Traveler, 2-Day Per Diem, lodging 1 night, no airfare required | 24 | EA | $0.00 | $0.00 | |
| 153 | TRIP REPORT - Response to Off-Site Location (more than 50 & up to 125 miles from Site), 1 Traveler, 3-Day Per Diem, lodging 2 nights, no airfare required | 24 | EA | $0.00 | $0.00 | |
| 154 | TRIP REPORT - Response to Off-Site Location (more than 50 & up to 125 miles from Site), 1 Traveler, 3-Day Per Diem, lodging 2 nights, roundtrip airfare required including Trip Report | 4 | EA | $0.00 | $0.00 | |
| 155 | TRIP REPORT - Excess (per traveler, per day) including Email Update | 128 | EA | $0.00 | $0.00 | |
| 156 | WORK PLAN OR REPORT, Lump Sum Price, (less than 20 hours LOE, basic figures/photos, and includes all preparation, duplication, and distribution) | 80 | EA | $0.00 | $0.00 | |
| ANALYTICAL TESTING | ||||||
| 157 | ASTM D1298 API gravity liquid Petroleum Products | 40 | EA | $0.00 | $0.00 | |
| 158 | CA-WET (STLC - extraction only) | 16 | EA | $0.00 | $0.00 | |
| 159 | EPA 1631 (Mercury (low level)) | 4 | EA | $0.00 | $0.00 | |
| 160 | EPA 6010/7470/7471 (CCR Metals Title 22 - 6010/7470/7471) | 240 | EA | $0.00 | $0.00 | |
| 161 | EPA 1010 (Ignitability) | 32 | EA | $0.00 | $0.00 | |
| 162 | EPA 1311 (TCLP - extraction only) | 32 | EA | $0.00 | $0.00 | |
| 163 | EPA 1311 (TCLP - Full) | 32 | EA | $0.00 | $0.00 | |
| 164 | EPA 1311/6010B/C/7471A (TCLP Metals) | 32 | EA | $0.00 | $0.00 | |
| 165 | EPA 1311/8270C/D (TCLP SVOCs) | 32 | EA | $0.00 | $0.00 | |
| 166 | EPA 1664 (N-Hexane Extractable Material) | 16 | EA | $0.00 | $0.00 | |
| 167 | EPA 300.0 (Anions (SO4, NO2, NO3, Cl)) | 160 | EA | $0.00 | $0.00 | |
| 168 | EPA 350.1 (Ammonia Nitrogen) | 160 | EA | $0.00 | $0.00 | |
| 169 | EPA 353.2 (Nitrate-Nitrite) | 160 | EA | $0.00 | $0.00 | |
| 170 | EPA 365.3 (TKN) | 160 | EA | $0.00 | $0.00 | |
| 171 | EPA 365.3 (Total Phosphorous) | 8 | EA | $0.00 | $0.00 | |
| 172 | EPA 410.4 (COD) | 8 | EA | $0.00 | $0.00 | |
| 173 | EPA 601 (VOCs, Purgeable Halocarbons) | 8 | EA | $0.00 | $0.00 | |
| 174 | EPA 6010 (Individual metal) | 80 | EA | $0.00 | $0.00 | |
| 175 | EPA 602 (VOCs, Purgeable Aromatics) | 8 | EA | $0.00 | $0.00 | |
| 176 | EPA 6020 (Individual metal ) | 80 | EA | $0.00 | $0.00 | |
| 177 | EPA 604 (Phenols) | 8 | EA | $0.00 | $0.00 | |
| 178 | EPA 608 (Oranochlorine Pesticides and PCBs) | 8 | EA | $0.00 | $0.00 | |
| 179 | EPA 610 (Polynuclear Aromatic Hydrocarbons) | 8 | EA | $0.00 | $0.00 | |
| 180 | EPA 612 (Chlorinated Hydrocarbons) | 8 | EA | $0.00 | $0.00 | |
| 181 | EPA 821-R-02-012 TM 2019.0 (Fish Toxicity, 96-hour static renewal Bioassays) or equivalent | 16 | EA | $0.00 | $0.00 | |
| 182 | EPA 7196A/7199 (Hexavalent Chromium) | 16 | EA | $0.00 | $0.00 | |
| 183 | EPA 7470 / 7471 (Mercury) | 16 | EA | $0.00 | $0.00 | |
| 184 | EPA 8015B/C (Extractables) | 240 | EA | $0.00 | $0.00 | |
| 185 | EPA 8015B/C (Purgeables) with silica gel cleanup | 240 | EA | $0.00 | $0.00 | |
| 186 | EPA 8021 (Aromatic VOCs) | 240 | EA | $0.00 | $0.00 | |
| 187 | EPA 8041 (Phenols) | 8 | EA | $0.00 | $0.00 | |
| 188 | EPA 8081/A (Organochlorine Pesticides (OCP)) | 4 | EA | $0.00 | $0.00 | |
| 189 | EPA 8121 (Chlorinated Hydrocarbons) | 8 | EA | $0.00 | $0.00 | |
| 190 | EPA 8151A (Chlorinated Herbicides ) | 4 | EA | $0.00 | $0.00 | |
| 191 | EPA 8260B/5035 (VOCs 8260B/5035 +Oxy+TPHG) | 240 | EA | $0.00 | $0.00 | |
| 192 | EPA 8260B/C (VOCs (BTEX/MTBE/Naphthalene)) | 48 | EA | $0.00 | $0.00 | |
| 193 | EPA 8260B/C | 48 | EA | $0.00 | $0.00 | |
| 194 | EPA 8270C/D or 625 (SVOCs) | 48 | EA | $0.00 | $0.00 | |
| 195 | EPA 8270C/D SIM (PAH-SIM) | 48 | EA | $0.00 | $0.00 | |
| 196 | EPA 8310 (PAH) | 8 | EA | $0.00 | $0.00 | |
| 197 | EPA 8440 (Total Recoverable Petroleum Hydrocarbons (TRPHs)) | 16 | EA | $0.00 | $0.00 | |
| 198 | EPA 9023 (Extractable Organic Halides (TOX)) | 4 | EA | $0.00 | $0.00 | |
| 199 | EPA 9045 (pH) | 4 | EA | $0.00 | $0.00 | |
| 200 | EPA ZHE/8260B/C (TCLP VOCs) | 32 | EA | $0.00 | $0.00 | |
| 201 | Oil & Grease SGT-HEM | 64 | EA | $0.00 | $0.00 | |
| 202 | Oil Viscosity per ASTM D7152 - 11(2016) | 64 | EA | $0.00 | $0.00 | |
| 203 | SM 4500 S2- / 9030 (Sulfide) | 4 | EA | $0.00 | $0.00 | |
| 204 | SM 4500CN-C OR 335.4 (Cyanide (standard)) | 4 | EA | $0.00 | $0.00 | |
| 205 | SM 4500CN-C OR I (Cyanide (LOW LEVEL= 1 ug/L LOD)) | 4 | EA | $0.00 | $0.00 | |
| 206 | SM2130B (Turbidity) | 4 | EA | $0.00 | $0.00 | |
| 207 | SM2320B (Alkalinity) | 4 | EA | $0.00 | $0.00 | |
| 208 | SM2540C/D (Total Solids, Suspended and Settleable) | 4 | EA | $0.00 | $0.00 | |
| 209 | SM4500-NH3 (Ammonia) | 4 | EA | $0.00 | $0.00 | |
| 210 | SM4500-NH3 (Total Kjeldahl Nitrogen (TKN)) | 4 | EA | $0.00 | $0.00 | |
| 211 | SM5210 (BOD) | 4 | EA | $0.00 | $0.00 | |
| 212 | SM5310 B/C/D (TOC ) | 4 | EA | $0.00 | $0.00 | |
| 213 | SM5520B/G (Oil and Grease) | 4 | EA | $0.00 | $0.00 | |
| 214 | SM5540 (Surfactant) | 4 | EA | $0.00 | $0.00 | |
| 215 | TO-15 (VOCs) in Air, including summa can rental | 64 | EA | $0.00 | $0.00 | |
| 216 | TO-17 (VOCs) in Air, with sorbent tubes | 64 | EA | $0.00 | $0.00 | |
| Total Price of Reference Items 001-216 | $0.00 | |||||
| Instructions to Complete Form: Offeror must fill out all cells shaded in green. Other cells are locked for editing. Offeror must identify all assumptions and exceptions in Section I of Technical Management Proposal. |
&"-,Bold"REFERENCE ITEM LIST
SPE600-17-R-0505
Professional Services, Remedial System O&M, Data Management, and Facility Groundwater Monitoring DFSP Point Loma, San Diego, California
&9Page &P of &N
File details come from the government source that posted it.