Pt. Loma O&M Appendix C Forms
View the file
Other files for this federal contract opportunity
Show all 50
DFSP Point Loma, CA Environmental Remediation Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX C
Forms
Daily Readings Flow Meter Data - 2015
System OM Checklist – Weekly - 2015
Liquid Level Gauging Sheets – Weekly - 2015
Liquid Level Gauging Sheets – Monthly - 2015
Liquid Level Gauging Sheets – Semiannual - 2015
Connection 220 Wastewater Sample Log
Chain of Custody – System Sampling
Calibration Sheet – pH Meter Transmitter
Calibration Sheet – Oil Water Meter
Calibration Sheet - blank
Calibration Log - PID
Groundwater Sample Log
Chain of Custody – Groundwater Sampling
Equipment Service – Quality Control
Waste Acceptance Form
Monthly Container Inspection - SPCC
APPENDIX C, Forms (Continued)
Monthly Containment or After Storm Inspection - SPCC
Monthly Pipe – Valve Inspection - SPCC
Monthly Tank Inspection - SPCC
Annual Tank Inspection - SPCC
Emergency Response Plan – Slug Plan
DFSP Point Loma Recovery System Flow Meter, Flow Totalizer, Hour Meter and Pulse Counter Data
Location ID Instrument Units Date Time Meter Reading Liquid Level (ft) Comments/Notes/Tech
Main Compound TP-03 FQI-0081 gal
Main Compound TP-03 PLC screen Hr:Min
RO Compound R/O 1 Perm flow 1 gal
RO Compound R/O 2 Perm flow 2 gal
HW-01 Vault HW-01-m Flow meter gal
HW-01 (main PLC) HW-01-hr PLC screen Hr:Min
Sump A total fluids TP-A FI-0084 gal DTP: DTW:
Sump A (main PLC) TP-A hr PLC screen Hr:Min
Sump A product PTP-A Flow meter gal
Sump A Prod (PLC) PTP-A hr PLC screen Hr:Min
Sump B TP-B FI-0085 gal DTP: DTW:
Sump B (main PLC) TP-B hr PLC screen Hr:Min
Sump B product PTP-B Flow meter gal
Sump B Prod (PLC) PTP-B hr PLC screen Hr:Min
Cmpnd 1, SPAWAR Trans Pump Flow meter gal
Cmpnd 1, SPAWAR Trans Pump PLC screen Hr:Min
10MW-17, Cmpnd 1 10MW-17 Pulse counter Pulse
10MW-20, Cmpnd 1 10MW-20 Pulse counter Pulse
10MW-14,vault in lot 10MW-14 Pulse counter Pulse
VEX-02 VEX-02 Pulse counter Pulse
VEX-03 VEX-03 Pulse counter Pulse
VEX-04 VEX-04 Pulse counter Pulse
Remediation Cmpnd Influent Tank Flow meter gal
Remediation Cmpnd Conn 220 Flow meter gal
Remediation Cmpnd conn FOR Flow meter gal
DFSP Point Loma Weekly RRS O and M Task CHECKLIST
TASK DATE/TIME
COMPLETE By (init) READINGS/NOTES/ISSUES:
South SUMP A SKIMMER (clean, sample, %, belt adj) South SUMP A WATER/PRODUCT LEVEL (gauge & bail) South SUMP A HOIST & WINCH CHECK (lube as req'd) South SUMP A PANEL & PLATFORM CLEANING South SUMP A LEVEL PROBE CLEANING
North SUMP B SKIMMER (clean, sample, %, belt adj) North SUMP B WATER/PRODUCT LEVEL (gauge & bail) North SUMP B HOIST & WINCH CHECK (lube as req'd) North SUMP B PANEL & PLATFORM CLEANING South SUMP B LEVEL PROBE CLEANING
HORIZONTAL WELL VAULT CLEANOUT
HORIZONTAL WELL PUMP CHECKOUT
CARROLL ST VAULT CLEANOUT
CARROLL ST HW-01 SAMPLE (note pressure & % product) CARROLL ST SPAWAR SAMPLE (pressure & % product)
VEX 2 WELL AIRFILTER CHECK (reg setpt) VEX 2 BUBBLER AIRLINE/OP CHECK (reg setpt)
VEX 2 VAULT CLEANOUT
VEX 2 AP-4 PUMP CHECK (note if off, est pulse rate, etc.)
VEX 2 PULSE COUNTER CHECK (note if operating & value)
VEX 3 WELL AIRFILTER CHECK (reg setpt) VEX 3 BUBBLER AIRLINE/OP CHECK (reg setpt)
VEX 3 VAULT CLEANOUT
VEX 3 AP-4 PUMP CHECK (note if off, est pulse rate, etc.)
VEX 3 PULSE COUNTER CHECK (note if operating & value)
VEX 4 WELL AIRFILTER CHECK (reg setpt) VEX 4 BUBBLER AIRLINE/OP CHECK (reg setpt)
VEX 4 VAULT CLEANOUT
VEX 4 AP-4 PUMP CHECK (note if off, est pulse rate, etc.)
VEX 4 PULSE COUNTER CHECK (note if operating & value)
FIELD NOTES:
DFSP Point Loma Weekly RRS O and M Task CHECKLIST
TASK DATE/TIME
COMPLETE By (init) READINGS/NOTES/ISSUES:
SPAWAR COMPOUND CLEANOUT
SPAWAR AIR COMP CHECK (drain, reg set, filter, oil)
SPAWAR TRANSFER PUMP FILTER CLEANOUT
SPAWAR TRANSFER PUMP CHECK
SPAWAR TANK LEVEL SENSOR CHECK (clean) SPAWAR COMPOUND PIPING CHECK (all) SPAWAR PLC CHECK & ALARM REVIEW (note pump hrs)
SPAWAR PULSE COUNTERS OP CHECK
SPAWAR 10MW-14 CHECK (pump, vault, etc) SPAWAR 10MW-17 CHECK (pump, vault, etc) SPAWAR 10MW-20 CHECK (pump, vault, etc)
RRS COMPOUND CLEANUP
RRS TRANS PUMP CHECK (flow, pressure, etc.)
RRS AIR COMPRESSOR # 1 COND. DRAIN
RRS AIRLINE FILTERS CHECK
RRS AIRLINE DRYER CHECK
RRS AIR COMPRESSORS CHECK (oil, belts, drains, etc.)
RRS PNEU VALVE CHECK (op, reg setpoint, etc.)
RRS TANK PRODUCT LEVEL CHECK
RRS TOUCH SCREEN PANELS CHECK
RRS ALARM HISTORY
RRS DATALOGGER CHECK
RO COMPOUND CLEANOUT
RO SYSTEM PANELS CHECK
RO SYSTEM PUMPS CHECK
RO SYSTEM FILTERS CHECK
RO SYSTEM PIPING CHECK
RO OWS CHECK
FIELD NOTES:
WEEKLY LIQUID LEVELS GAUGED & RECORDED BY:_______________________
DFSP Point Loma Project #:__________________
Location Date Time Depth to Water
D
TW
R e
f. Depth to
Product D
TP
f.
TH
IC
K
N
ES
S
NOTES:
10MW-19 27 NP
10MW-23 18 NP
10MW-24 19 NP
10MW-25 17 NP
10MW-28 27 NP
10MW-29 17 NP
FISC-MW01 38 NP
FISC-MW03 24 NP
FISC-MW04 33 NP
FISC-MW05 25 NP
FISC-MW06 21 NP
FISC-MW08 37 NP
FISC-MW10 30 NP
FISC-MW11 28 NP
FISC-MW13 36 NP
FISC-MW14 19 NP
FISC-MW15 18 NP
FISC-MW16 27 NP
FISC-MW17 21 NP
FISC-MW18 19 NP
MT-04 101 NP
MT-05 99 NP
MT-06 94 NP
MT-07 141 NP
MT-08 136 NP
MT-10 48 NP
MT-11 67 66
MT-12 22 NP
MW-CU 30 NP
OS-MW01 46 NP
OS-MW02 42 42
0S-MW03 39 NP
0S-MW04 42 NP
OS-MW05 37 NP
OS-MW07 37 NP
T58-MW01 62 NP
T76-MW01 91 NP
T76-MW02 87 NP
T79-MW01 107 NP
T85-MW02 52 NP
T85-MW03 53 NP
T87-MW02 39 NP
MONTHLY LIQUID LEVELS GAUGED & RECORDED BY:_______________________
Location Date Time Depth to
Water
D
TW
R e f.
Depth to
Product
D
TP
R e f.
TH
IC
KN
ES
S
NOTES:
10MW‐14 31 NP pump
10MW‐17 27 NP pump
10MW‐19 27 NP
10MW‐20 26 NP pump
10MW‐23 18 NP
10MW‐24 19 NP
10MW‐25 17 NP
10MW‐28 27 NP
10MW‐29 17 NP
FISC‐MW01 38 NP
FISC‐MW03 24 NP
FISC‐MW04 33 NP
FISC‐MW05 25 NP
FISC‐MW06 21 NP
FISC‐MW08 38 NP
FISC‐MW10 30 NP
FISC‐MW11 28 NP
FISC‐MW12 26 26
FISC‐MW13 36 NP
FISC‐MW14 19 NP
FISC‐MW15 18 NP
FISC‐MW16 27 NP
FISC‐MW17 21 NP
FISC‐MW18 19 NP
MT‐04 101 NP
MT‐05 99 NP
MT‐06 94 NP
MT‐07 141 NP
MT‐08 136 NP
MT‐10 48 NP
MT‐11 67 66
MT‐12 22 NP
MW‐CU 30 NP
OS‐MW01 46 NP
DFSP Point Loma Project :__________________
Location Date Time Depth to
Water
D
TW
R e f.
Depth to
Product
D
TP
R e f.
TH
IC
K ‐N
ES
S
NOTES:
OS‐MW02 42 42
0S‐MW03 39 NP
0S‐MW04 42 NP
OS‐MW05 37 NP
OS‐MW07 37 NP
T58‐MW01 62 NP
T63‐MW06 52 NP
T76‐MW01 91 NP
T76‐MW02 87 NP
T79‐MW01 107 NP
T85‐MW01 78 NP
T85‐MW02 52 NP
T85‐MW03 53 NP
T87‐MW01 129 NP
T87‐MW02 39 NP
T87‐MW03 73 NP
RW‐S‐07 27 NP
RW‐S‐12 23 NP
RW‐S‐20 34 NP
RW‐S‐24 41 NP
RW‐S‐33 37 NP
RW‐S‐34 38 NP
Location Date Time Depth to
Water
D
TW
R e f.
Depth to
Product
D
TP
R e f.
TH
IC
KN
ES
S
NOTES:
10MW‐14 31 NP pump
10MW‐17 27 NP pump
10MW‐19 27 NP
10MW‐20 26 NP pump
10MW‐23 18 NP
10MW‐24 19 NP
10MW‐25 17 NP
10MW‐28 27 NP
10MW‐29 17 NP
FISC‐MW01 38 NP
FISC‐MW03 24 NP
FISC‐MW04 33 NP
FISC‐MW05 25 NP
FISC‐MW06 21 NP
FISC‐MW08 38 NP
FISC‐MW10 30 NP
FISC‐MW11 28 NP
FISC‐MW12 26 26
FISC‐MW13 36 NP
FISC‐MW14 19 NP
FISC‐MW15 18 NP
FISC‐MW16 27 NP
FISC‐MW17 21 NP
FISC‐MW18 19 NP
MT‐04 101 NP
MT‐05 99 NP
MT‐06 94 NP
MT‐07 141 NP
MT‐08 136 NP
MT‐10 48 NP
MT‐11 67 66
MT‐12 22 NP
MW‐CU 30 NP
OS‐MW01 46 NP
DFSP Point Loma Project :__________________
Location Date Time Depth to
Water
D
TW
R e f.
Depth to
Product
D
TP
R e f.
TH
IC
K ‐N
ES
S
NOTES:
OS‐MW02 42 42
0S‐MW03 39 NP
0S‐MW04 42 NP
OS‐MW05 37 NP
OS‐MW07 37 NP
T58‐MW01 62 NP
T63‐MW06 52 NP
T76‐MW01 91 NP
T76‐MW02 87 NP
T79‐MW01 107 NP
T85‐MW01 78 NP
T85‐MW02 52 NP
T85‐MW03 53 NP
T87‐MW01 129 NP
T87‐MW02 39 NP
T87‐MW03 73 NP
RW‐S‐07 27 NP
RW‐S‐12 23 NP
RW‐S‐20 34 NP
RW‐S‐24 41 NP
RW‐S‐33 37 NP
RW‐S‐34 38 NP
SEMI-ANNUAL LIQUID LEVELS GAUGED & RECORDED BY:_______________________
DFSP Point Loma Project # :__________________
Location Date Time Depth to Water (##.##')
D
TW
R ef
Depth to Product (##.##') D
TP
R ef
TH
IC
K N
ES
S
NOTES:
10MW-05 51 46
10MW-07 52 47
10MW-12 33 32
10MW-13 31 NP
10MW-14 31 NP pump
10MW-17 27 NP pump
10MW-19 27 NP
10MW-20 26 NP pump
10MW-23 18 NP
10MW-24 19 NP
10MW-25 17 NP
10MW-26 34 32
10MW-27 33 32
10MW-28 27 NP
10MW-29 17 NP
10MW-31 50 50
DGP-01B 67 NP
DGP-02B 67 NP
DGP-02C 67 NP
DGP-03B 51 NP
DGP-03C 50 NP
DGP-04B 26 NP
DGP-04C 25 NP
DGP-05B 18 NP
DGP-06 19 NP
DGP-07 19 NP
DGP-08 7 NP
DGP-09B 27 NP
DGP-10B 27 NP
DGP-11B 27 NP
DGP-12B 19 NP
DGP-13B 18 NP
FISC-MW01 38 NP
FISC-MW02 34 34
FISC-MW03 24 NP
FISC-MW04 33 NP
FISC-MW05 25 NP
Water (##.##')
D
TW
R ef
Depth to Product (##.##') D
TP
R ef
TH
IC
K N
ES
S
NOTES:
FISC-MW06R 21 NP
FISC-MW07 48 NP
FISC-MW08 38 NP
FISC-MW10 30 NP
FISC-MW11 28 NP
FISC-MW12 26 26
FISC-MW13 36 NP
FISC-MW14 19 NP
FISC-MW15 18 NP
FISC-MW16 27 NP
FISC-MW17 21 NP
FISC-MW18 19 NP
FNW-MW01 53 52
MT-01 53 50
MT-03 98 96
MT-04 101 NP
MT-05 99 NP
MT-06 94 NP
MT-07 141 NP
MT-08 136 NP
MT-10 48 NP
MT-11 67 66
MT-12 22 NP
MW-CU 30 NP
OS-MW01 46 NP
OS-MW02 42 42 0
0S-MW03 39 NP
0S-MW04 42 NP
OS-MW05 37 NP
OS-MW07 37 NP
PZ-02 54 NP
PZ-04 59 58
PZ-06 53 NP
PZ-07 48 NP
PZ-08 45 NP
PZ-09 53 NP
PZ-10 54 NP
Water (##.##')
D
TW
R ef
Depth to Product (##.##') D
TP
R ef
TH
IC
K N
ES
S
NOTES:
PZ-11 57 NP
PZ-12 56 NP
PZ-13 41 41
PZ-14 61 NP
PZ-15 63 NP
PZ-16 57 NP
PZ-17 53 NP
PZ-18 69 NP
PZ-19 92 66
PZ-20 71 NP
PZ-21 116 99
PZ-22 115 NP
PZ-23 107 NP
PZ-24 107 NP
PZ-25 120 106
PZ-26 29 NP
PZ-27 32 NP
PZ-28 27 NP
PZ-29 31 NP
PZ-30 148 NP
PZ-31 147 NP
PZ-32 134 NP
RW-S-07 27 NP
RW-S-12 23 NP
RW-S-20 34 NP
RW-S-24 41 NP
RW-S-33 37 NP
RW-S-34 38 NP
T45-MW02 58 54
T45-MW04 48 47
T57-MW01 46 46
T58-MW01 62 NP
T58-MW03 52 52
T58-MW05 48 46
T63-MW04 79 76
T63-MW05 69 64
T63-MW06 52 NP
Water (##.##')
D
TW
R ef
Depth to Product (##.##') D
TP
R ef
TH
IC
K N
ES
S
NOTES:
T63-MW07 73 NP
T63-MW08 83 NP
T63-MW09 124 118
T63-MW10 105 84
T63-MW11 98 84
T63-MW12A 89 NP
T63-MW12B 86 86
T63-MW12C 86 NP
T63-MW12D 87 NP
T63-MW13 57 57
T63-MW14 91 90
T63-MW15 64 59
T63-MW16 66 66
T63-MW17 98 83
T76-MW01 91 NP
T76-MW02 87 NP
T79-MW01 107 NP
T85-MW01 78 NP
T85-MW02 52 NP
T85-MW03 53 NP
T85-MW04 98 NP
T85-MW05 78 NP
T87-MW01 129 NP
T87-MW02 39 NP
T87-MW03 73 NP
VEX-01 49 NP
VEX-02 45 NP
VEX-03 42 NP
VEX-04 35 NP
Page _______ of _________
Date ______________________
Activity ______________ DFSP Point Loma Remediation System Monthly Sampling
Project Name/Number___________________________________________________________________
Sample ID____________________________________________________________
Sample Delivery Group (COC) #_____________________________________________
Sample Description_________________________________________________
Grab Sample @ _______________________________
FM-220 :
pHM-220 :
OWM-220 :
Comments:
CONTAINERS
_______500mL amber _______1L amber _______ 40 mL VOA
Glass Bottle Glass bottle Glass vial
_______500 mL Plastic _______250 mL Plastic _______ 125mL Plastic
HDPE bottle HDPE bottle HDPE bottle HCl (VOA)
Incude Comments on Final Report
CB&I Federal Services LLC
DFSP POINT LOMA REMEDIATION SYSTEM CONNECTION 220
WASTEWATER SAMPLING LOG
NaOH (500mL)
NaOH/ZnAc2
HNO3 (250mL)
H2SO4 (1L)
Forms_220 WW Conn Sample Log_revised 9-28-15.xls Page 1 of 1 9/28/2015
PL- __ __ __ __ __ __ - __ __ __
Ref. Document Number
Company Name: CB&I Federal Services, LLC Proj Number:
250ml -
HDPE -
HNO3
500 ml Amber glass
250ml -
HDPE -
HNO3
500 -
HDPE -
NaOH
150 ml-
HDPE
NaOH/ ZnAc2
Address: 1230 Columbia St. Suite 1200 Project Name:
City / State / Zip: San Diego, CA 92101 Project Location: 3 2 1 1 1 1 1 1
Project Manager: PO #:
Phone/Fax Number: Lab Destination:
Send Report To: Lab Contact:
Phone/Fax Number: Lab Address:
Address:
City: Lab phone #:
Project Contact:
Location Date Time Matrix
EFF
Remediation System Discharge
(Effluent) WW
PC
Remediation System Post
Clay/Pre Carbon WW
MID
Remediation system between carbon WW
INF
Remediation System Influent
Tank WW
Special Instructions: 10 Day TAT * List of Metals - Cd, Cr, Cu, Pb, Ni, Hg, Ag, Zn Method Codes Preservation Codes
Level 2 Report G = Grab HNO3 = Nitric Acid
Sampler(s) Name(s): Matrix Codes NaOH = Sodium Hydroxide
Relinquished By: Date: Time: Received By: Date: Time: DW = Drinking Water Ice = Cool 4 degrees C
WW = Waste Water ZnAOc = Zinc Acetate
Relinquished By: Date: Time: Received By: Date: Time: LIQ = Other Liquid HCl = Hydrochloric Acid
CFS Sample Number Method
G
G
G
G
Temperature Blank
Collection Information
VOA Vial - HCl
DFSP Pt. Loma
SYSTEM SAMPLING
CHAIN OF CUSTODY 1 of
System Sampling Number of Containers
Container Type/Preservation Code
250ml HDPE Amber Liter -H2SO4
C hl or id e (3
B
TE
X (8
0)
Le ad
(6
0B
O il an d
G re as e
-S G
T H
EM
(1
4)
C oo le r T em pe ra tu re
M et al s
(6
0B /7
0A
C ya ni de
(4
C
N /9
2A
Su lfi de (S
M
S
2)
Ig ni ta bi lit y
(1
0A
TP
H
- G R
O (8
5 )
TP
H
-D ie se l /
J et
F ue l (
B
Equipment Used
Calibration Data
Measuring and test equipment in the manufacture and inspection of the listed product are traceable to the National Institute of Standards and Technology.
Solution 10 Solution 4
Corrected Data
Solution 4 Solution 10
Before cal
Location: Conn 220
SN 61406121338
Georg Fisher Signet
PH Solution 4 and 10 Manufacture
199 Rosecrans Bldg 604
San Diego CA 92016
Scale: 0 To 14
Device Type: PH Transmitter
Tag No: PH-220 Technician Name: Alonzo Beehler
Model No: 3-9900-1
Calibration Data Sheet
Customer Information Manufacturer Information
Calibration Date: 1/9/2015
Name: Point Loma Navy Base Supplier: Georg Fischer Signet
Device Information Calibration Information
PO:
James.Horna Text Box
James.Horna Text Box
Calibration Data
Measuring and test equipment in the manufacture and inspection of the listed product are traceable to the National Institute of Standards and Technology.
Cal unnecessary at this time unit is within manufactures specs
Corrected Data
19.4 Before cal
Location: Conn 220
SN 41-1678-CE
Turner Designs
Check Point Orange set at 19.40 Manufacture
199 Rosecrans Bldg 604
San Diego CA 92016
Scale: 0 To 200 MGL
Device Type: Oil In Water Monitor Tag No: Oil Meter-220 Technician Name:
Model No: TD-4100XD
Calibration Data Sheet
Customer Information Manufacturer Information
Calibration Date:
Name: Point Loma Navy Base Supplier: Turner Designs
Device Information Calibration Information
PO:
Calibration Data Notes
Model No:
Calibration Data Sheet
Customer Information Manufacturer Information
Calibration Date:
Name: Point Loma Navy Base Supplier:
Device Information Calibration Information
PO:
Scale:
Device Type:
Tag No: Technician Name:
199 Rosecrans Bldg 604
San Diego CA 92016
Location:
Check Point set at Manufacture
Before cal
Note if Cal is unnecessary when unit is within manufacturer's specs
Corrected Data
Project Name: Sample Location: POINT LOMA
Project No.: Date and Time:
Information Recorded by:
Sampling Team Name Printed
Equipment: Portable PID Equipment/ID No.:
Analyte Cal. Std.
Standard Concentration
(ppm) Measured
Value (ppm)
Calibration Required?
(Y/N)
0.0 Ambient Air
Reference Std. 100 ppm
EQUIPMENT
Equipment: Water Quality Field Instrument
Equipment/ID No.:
Calibration check standard Lot and Expiration:
Analyte Cal. Std.
Cal Check Standard
Concentration Acceptance
Criteria Measured
Value
Recalibration Required?
(Y/N)
Conductivity Reference Std. (µS/cm) ± 15%
Turbidity Reference Std. (NTU) ± 15%
ORP Reference Std. ± 15%
4.0 pH units 4.0 ± 0.1 pH unit
7.0 pH units 7.0 ± 0.1 pH unit
Dissolved Oxygen Reference Std. ± 15%
Comments:
CALIBRATION FIELD LOG
pH
Post-Calibration Value (ppm)
VOCs (solvents and TPH)
Post- Calibration
Value
DFSP Pt. Loma
PID S/N Cal check std: 100 ppm isobutlyene
Project Name: DFSP Pt Loma Project No.:
Sample ID
EQUIPMENT / NOTES
Purging Method/Equipment: Micropurge Sampling Equipment/ID No.: Non-dedicated QED Portable Bladder Pump Flow Rate During Purging :
Note: Flowrate for VOC sampling should be no greater than 100 ml/min Daily field instrument calibration verification performed? Yes ___ No ___
PURGING INFORMATION
Measuring Point Drawdown depth limit (DDL) = DTWi + 0.3 (ft) Casing ID (in.)
Depth to Water - Initial (DTWi) (ft) Depth to Well Bottom (ft) PID Reading:
Screen Interval (ft):
FIELD CONDITIONS
Weather Conditions: □ Sunny □ Rain □ Wind Temperature:
Time of Reading Purge Rate (ml/min)
Dynamic Depth to
Water
Conductivity (µS/cm)
Temperature (oC / F) pH Turbidity
(NTU)
Purge Stabilization Criteria
Drawdown limit 0.3 ft
+10% + 10% +0.1 units + 10%
Sample No.:
Container(s) Type and Volume No. of
Containers Filtered
(Y/N) Parameters 40-ml VOA Vials 3 N EPA 8260B - BTEX/MTBE/Naphthalene
500 ml Amber Glass 2 N EPA 8015B - TPH as Diesel & JP5
If the water level is above the top of the screen, the pump should be set at the approximate mid-point of the screen. If the water level is below the top of the screen, set the pump between the water level and the bottom of the screen. ** Note : If there is less than 1.5ft of water, the well should be bailed dry and sampled on recharge.
Duplicate or MS/MSD Collected:
Preservatives HCl, Ice
Ice
Top of Casing Approximate depth of pump inlet*(ft):
ORP
(mV) DO (mg/L)
+ 10 mV + 10%
Date / Time Collected
Sample Collected by:
300 - 500 ml/min with water level drawdown less than 0.3 feet
GROUND WATER SAMPLE COLLECTION LOG
Site Location: DFSP Point Loma Well ID:
Page of
1230 Columbia St., Suite 1200 Project Number:
San Diego, CA 92101 Project Name: Pt.Loma Project Location: Semiannual GW Monitoring
Project Manager: Chris Corey Purchase Order #:
619-533-7330/ 619-239-1238 Shipment Date Send Report To: Rose Condit
Phone/Fax Number: 925-288-2151 Lab Destination:
Address: 4005 Port Chicago Hwy
City: Concord, CA, 94520 Lab Contact phone #:
HCl/Ice Ice
Sampler's Name(s): 3-VOA 2-500 ml Amber
Sample ID Date Time Method
LF GW
RB2015 NA BW 1 X X
TB2015 NA BW 1 X
Cooler Temp Blank X
Method Codes
Turnaround Time:__________ □ 24-hr □ 48-hr Level of QC Required: LF= low flow G = Grab
Standard TAT -10day □ 72-hr □ 5-day I II III Project Specific: Matrix Codes Relinquished By: Date: Received By: Date: DW = Drinking Water SO =Soil
Time: Time: GW = Ground Water BW= Blank Water Relinquished By: Date: Received By: Date: WW = Waste Water WP=Waste Product
Time: Time:
Analyses Requested
T P
H -D a n d T
P H
-J et
F u el w it h
G
A
V
IT
Y S
E P
A R
A T
IO
N rs
E P
A
5B
M S
/M S
D
C oo le r
T em p er at u re
CHAIN OF CUSTODY PL _ _ _ _ _ _ - _ _ _
1 1
Lab Contact:
B T
E X
/M T
B E
/ N ap h th al en
(E P
A
0B
T P
H -D a n d J
P -5
(E P
A
5B
M at ri x of co n ta in er s
Preservative
Collection Information Container Type
Location ID
Special Instructions: Level 2 Report Perform silica gel cleanup on TPH- extractables;
TPH- RL = 50 µg/L ; TPH-JF (C10-C16) & TPH-Diesel (C16-C24)
Rinse Blank
Trip Blank
Page of
1230 Columbia St., Suite 1200 Project Number:
San Diego, CA 92101 Project Name: Pt.Loma Project Location: Semiannual GW Monitoring
Project Manager: Chris Corey Purchase Order #:
619-533-7330/ 619-239-1238 Shipment Date Send Report To: Rose Condit
Phone/Fax Number: 925-288-2151 Lab Destination:
Address: 4005 Port Chicago Hwy
City: Concord, CA, 94520 Lab Contact phone #:
HCl/Ice Ice
Sampler's Name(s): 3-VOA 2-500 ml Amber
Sample ID Date Time Method
LF GW
RB2015 NA BW 1 X X
TB2015 NA BW 1 X
Cooler Temp Blank X
Method Codes
Turnaround Time:__________ □ 24-hr □ 48-hr Level of QC Required: LF= low flow G = Grab
Standard TAT -10day □ 72-hr □ 5-day I II III Project Specific: Matrix Codes Relinquished By: Date: Received By: Date: DW = Drinking Water SO =Soil
Time: Time: GW = Ground Water BW= Blank Water Relinquished By: Date: Received By: Date: WW = Waste Water WP=Waste Product
Time: Time:
Analyses Requested
T P
H -D a n d T
P H
-J et
F u el w it
G
A
V
IT
Y S
E P
A R
A T
IO
N rs
E P
A
5B
M S
/M S
D
C oo le r
T em p er at u re
CHAIN OF CUSTODY PL _ _ _ _ _ _ - _ _ _
1 1
Lab Contact:
B T
E X
/M T
B E
/ N ap h th al en
(E P
A
0B
T P
H -D a n d J
P -5
(E P
A
5B
M at ri x of co n ta in er s
Preservative
Collection Information Container Type
Location ID
Special Instructions: Level 2 Report Perform silica gel cleanup on TPH- extractables;
TPH- RL = 50 µg/L ; TPH-JF (C10-C16) & TPH-Diesel (C16-C24)
Rinse Blank
Trip Blank
DLA-E Environmental Prog Preparatory Control Worksheet Page 1 of 1 Revised 12-08-2011
DLA-E Environmental Program Equipment Service Quality Control Worksheet
CQC SM: Date: __/___/__
PROJECT No.: Project Title: EQUIPMENT SERVICE QC CON #: START
TIME:
Definable Feature of Work: Equipment Service QC
A. ACTIVITIES INCLUDED IN DEFINABLE FEATURE OF WORK
1 SHIPMENT OF EQUIPMENT TO OFFSITE REPAIR FACILITY
2 INSTALLATION OF EQUIPMENT AT SITE
3 RESUME SITE OPERATIONS
B. QUALITY CONTROL REQUIREMENTS
THE SUBSEQUENT INSPECTIONS, TESTS AND OBSERVATIONS SHALL VERIFY THE APPROPRIATE STANDARDS
REFERENCED IN SYSTEM DESIGN DRAWINGS ARE MET.
OK/NA INITIAL
1 SHIPMENT – List equipment and components to be shipped for service including serial number. Create packing slip.
2 SHIPMENT – Check all major parts noting condition and functionality status
3 SHIPMENT – Verify equipment is decontaminated and complies with DOT standards
4 SHIPMENT – Take photos of equipment prior to removal and prior to shipping
5 SHIPMENT – Verify packaging properly sealed to withstand transport
6 SHIPMENT – Verify packaging for proper ID markings, shipping labels and their visibility
7 SHIPMENT – Record tracking information for packages sent and received. Maintain records for delivery status of packages
8 VISUAL INSPECTION – Inspect received package against packing slip, verify serial number
9 VISUAL INSPECTION – Inspect major parts for condition and functionality, take photographs
10 EQUIPMENT INSTALL – Verify equipment is properly mounted and secured
11 EQUIPMENT INSTALL – Check equipment for alignment with coupled equipment
12 EQUIPMENT INSTALL – Verify leads correctly wired to power source and properly grounded, perform bump test to confirm rotation
13 EQUIPMENT INSTALL – Check fluid levels, verify all connected equipment & lines are in good working order
14 EQUIPMENT INSTALL – Photograph equipment installation, document any system modifications since repaired equipment was installed
15 EQUIPMENT OPERATION – Verify previously existing condition requiring service no longer exists
16 EQUIPMENT OPERATION – Check for excessive vibration, abnormal operational sound
17 EQUIPMENT OPERATION – Verify motor speed and electrical load (voltage & amperage), operational temperature within pump specifications
18 EQUIPMENT OPERATION – Verify reinstalled equipment is properly connected to preexisting adjacent equipment or fittings on drive end. Check seals for leaks
19 EQUIPMENT OPERATION – Verify automatic controls functioning properly
20 EQUIPMENT OPERATION – Verify system settings, flow rate, pressure, measurements, etc. within designed specifications
21 EQUIPMENT OPERATION – Check equipment settings and verify equipment is calibrated
C. QA/QC DEFICIENCY ITEMS
NAVFAC Southwest Environmental Services Doc ID: OTH-005 Industrial Waste/Oily Waste Facility Used In: IWOW-03, 08, 22, 27, 67 Bilge & Oily Waste Treatment System Facilities Revision #: 16 Revision Date: 03/19/2015
WASTE ACCEPTANCE FORM
/ / JULIAN DATE: ___________________
Transporter’s Co. / Truck # / Driver Name
Bulk Pumping # (Non-FRC): __________________ Activity #: _____ / _
CUSTOMER USE ONLY:
DATE: _____/______/_______
ACTIVITY NAME: BASE:
BUILDING / LOCATION: PHONE NUMBER:
JOB ORDER NUMBER (if available):
WASTE DESCRIPTION:
NBC-NI IWOW HAS THE APPROPRIATE PERMIT(S) FOR, AND WILL ACCEPT, THE WASTE THE GENERATOR IS SHIPPING. [40 CFR 264.12 (b)]
VOLUME (GALLONS):
FRC USE ONLY
BOWSER ID: TANK NO: SHOP NO:
PROCESS GENERATING WASTE: FRC WASTE PROFILE NUMBER:
CB&I PERSONNEL USE ONLY: BULK PROFILE # TRUCK DOI: NOT REQUIRED □ COMPLETED □
FACILITY: IWTP NI ORP NBSD BOWTS NBPL BOWTS NAB BOWTS
NBCNI ONLY: Manifest#: GENERATOR’S ID NUMBER: NON_HAZ
TIME ARRIVED: PUMP START TIME: PUMP END TIME:
PHYSICAL STATE: SLUDGE IN BOWSER/TANKER TRUCK: YES NO VOLUME (GALLONS):
FIELD TEST RESULTS (MG/L), if required (see FRC Profile List):
Total Cr Cr. (VI) CHLOR-D-TECT
CN HYDROCLOR-Q
pH: OTHER
TREATMENT GROUP: 1 – OW/GIW 2 – CONTAMINATED OW/GIW
3 – CHROME 4 – MIXED METALS
5 – CYANIDE 6 – PHENOL
7 – SPECIAL
TREATMENT TANK: BATCH NUMBER: TRACKING NUMBER:
MANAGEMENT METHOD CODE H135______
ACTIVITY REPRESENTATIVE:
PRINT NAME DATE
CB&I REPRESENTATIVE:
PRINT NAME DATE
CB&I TRUCK AUTHORIZATION:
PRINT NAME DATE Time WAF Issued
Total Truck Hours (Pac Trans):
Total Truck Hours over 4:
Note:
NAVFAC Southwest Environmental Services Doc ID: OTH-005 Industrial Waste/Oily Waste Facility Used In: IWOW-03, 08, 22, 27, 67 Bilge & Oily Waste Treatment System Facilities Revision #: 16 Revision Date: 03/19/2015
INSTRUCTIONS FOR COMPLETING WASTE ACCEPTANCE FORM
Waste Acceptance Form must accompany all wastewater shipments sent to the Environmental Service Centers: Industrial Waste Treatment Plant, Oily Waste Treatment Plant, or any of the BOWTS facilities. Instructions on how to complete the top, customer portion of the form follow:
ACTIVITY #.: Will be assigned by Scheduler.
TRANSPORTER INFORMATION: Must be filled out by the driver.
CUSTOMER USE ONLY (TOP BOX): Must be filled out by the customer or driver and will include the following information:
Bulk Pumping # (Non-FRC): Have the driver or customer record the bulk pumping number or the individual contract number for the load being delivered.
DATE: Date of the waste shipment.
ACTIVITY NAME: Enter activity name. (e.g. PWC Code 007 or vessel name).
BASE: Base where waste was generated. (e.g. Miramar).
PHONE NUMBER: Phone number for activity representative.
JOB ORDER NUMBER: Waste disposal billing Job Order Number.
WASTE DESCRIPTION: In this field write a brief, specific description of the waste such as Chrome Plating Rinse Tank Water.
FRC USE ONLY: Only FRC will fill out this section.
BOWSER ID: Id for the individual bowser delivering the waste.
SHOP NUMBER: Building or shop number from where the waste was derived.
TANK NUMBER: Tank from which the waste was derived.
PROCESS GENERATING WASTE: General description of the waste.
FRC WASTE PROFILE NUMBER: Profile number assigned by FRC composed of 3 letters and 5 numbers (e.g., IWW13-201)
CB&I PERSONNEL USE ONLY: Only CB&I personnel will fill out this section.
BULK PROFILE NUMBER: Profile number comprised of 2 letters and 2 numbers.
INDUSTRIAL WASTE PROFILE NUMBERS
PROFILE NUMBER WASTE STREAM
HW11 Cyanide Waste HW21 Caustic Only, pH > 12.5 HW31 Acidic Only, pH ≤ 2 HW41 Mixed Metal Waste HW51 Chrome Waste (over 0.32ppm) HW61 Phenol and Organic Waste HW71 Special Waste
OILY WASTE/GENERAL INDUSTRAIL WASTE (GIW) PROFILE NUMBER
NW21 GIW
NW91 AFFF without OW NW93 Rain/Comp Water HW91 Bilge/Oily Water/AFFF NW61 Other Non Hazardous Waste
JULIAN DATE: Written by waste receiving facility.
TIME WAF ISSUED: Written at time of truck inspection. (FRC bowsers do not undergo pre-transport inspections) TRUCK DOI: Choose if a truck DOI was required or not required. Required when a truck is offloading waste from vessel to shore (over water).
FACILITY: Choose disposal location for the identified waste stream.
MANIFEST #, EPA Generator ID #, NON_HAZ: If a manifest is used for transport, fill in these sections with the manifest number (located in box 4), Generator’s ID Number (located in Box 1), Non-hazardous Manifest ID number (located in box 1).
TIME ARRIVED: The time the bowser or tanker truck arrived on site.
PUMP START TIME: The time the bowser or tanker truck started pumping.
PUMP END TIME: The time the bowser or tanker truck finished pumping.
PHYSICAL STATE: Liquid or Solid.
SLUDGE IN BOWSER/TANKER TRUCK: Inspect bowser or tanker truck and record if sludge is present.
VOLUME (GALLONS): Total volume in gallons of the waste shipment.
FIELD TEST RESULTS (IF REQUIRED): For OW, Clor-D-Tect or Hydro-Clor. For IW, review FRC Profile List for required testing. Record field test results on WAF.
TREATMENT GROUP: Mark treatment group.
TRACKING NUMBER: Record the tracking number from the current month’s Waste Acceptance Tracking Log.
TREATMENT TANK: Record the Tank Number of where the waste was pumped into.
BATCH NUMBER: For IW only, record the batch folder number for the tank that the waste is being disposed into.
MANAGEMENT METHOD CODE: All waste streams accepted at the IW and OW facilities use the Management Method Code of H135 (discharge to sewer/POTW or NPDES (with prior storage – with or without treatment).
The bottom of the form must be signed and dated by a representative of the generating activity.
If you have any questions about how to complete the Waste Acceptance Form, please contact EPS, Operations Officer or Plant Supervisors.
FOR REFERENCE PURPOSES
Page 2 – Instructions for Waste Acceptance Form
Monthly Container Inspection SPCC Plan – DFSP Point Loma Remediation System
COPYRIGHT© 2011 STEEL TANK INSTITUTE
Section 4 Appendix C-13
STI SP001 Portable Container Monthly Inspection Checklist
General Inspection Information:
Inspection Date: Retain Until Date: (36 months from inspection date)
Prior Inspection Date: Inspector Name:
Containers Inspected (ID #’s):
Inspection Guidance:
For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.
The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a
Certified inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.
(*) designates an item in a non-conformance status. This indicates that action is required to address a problem.
Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.
Retain the completed checklists for 36 months.
Item Area: Area: Area: Area:
1.0 AST Containment/Storage Area
1.1 ASTs within designated
storage area?
Yes No* Yes No* Yes No* Yes No*
1.2 Debris, spills, or other fire
hazards in containment or storage area?
Yes* No Yes* No Yes* No Yes* No
1.3 Water in outdoor
secondary containment?
Yes* No Yes* No Yes* No Yes* No
1.4 Drain valves operable
and in a closed position?
Yes No* Yes No* Yes No* Yes No*
1.5 Egress pathways clear
and gates/doors operable?
Yes No* Yes No* Yes No* Yes No*
2.0 Leak Detection
2.1 Visible signs of leakage
around the container or storage area?
Yes* No Yes* No Yes* No Yes* No
3.0 Container
3.0 Noticeable container
distortions, buckling, denting or bulging?
Yes* No Yes* No Yes* No Yes* No
Monthly Container Inspection SPCC Plan – DFSP Point Loma Remediation System
Section 4 Appendix C-14
Comments:
Monthly Containment & After Storm Event Inspection SPCC Plan – DFSP Point Loma Remediation System
DLA
Section 4 Appendix C-15
SPILL CONTAINMENT AND DRAINAGE SYSTEM
MONTHLY INSPECTION & AFTER STORM EVENT CHECKLIST
DATE
INSPECTOR (Print full name then initial)
TANK/CONTAINMENT AREA IDENTIFICATION
Instructions: Complete this record for each monthly inspection and after each storm event. A
“YES” response requires an immediate corrective action.
ITEM YES NO DESCRIPTION / COMMENTS
A. Containment area has standing water.
(Must be empty and free from debris.)
B. Surface of accumulated water in berm has noticeable oil sheen. (If there is any oil present, recover any product with vacuum truck or by other means, then remove any remaining sheen with sorbent pads. If there is no oil present, drain berm by opening valve or empty by manually operated pump or ejectors and record such event.)
C. Containment berm valve left open.
(This valve must be in normal closed position.)
D. Ramps or containment walls are damaged or cracked.
E. Dikes have holes, cracks, vegetative growth, or other breaches that could result in leaks.
F. Curbing has holes, cracks, or other breaches that could result in leaks.
ADDITIONAL COMMENTS:
Monthly Pipeline & Valve Inspection SPCC Plan – DFSP Point Loma Remediation System
Section 4 Appendix C-17
PIPELINE & VALVE SYSTEM MONTHLY INSPECTION CHECKLIST
DATE
INSPECTOR (Print full name then initial)
PIPELINE SECTION/AREA IDENTIFICATION
PRIOR
INSPECTION
RETAIN RECORD (36 months from date of inspection)
CORRECTIVE ACTION REQUIRED - Yes or No (If yes, indicate date required by and detail in additional comment below )
Instructions: Complete this record for each monthly inspection and after each storm event. A
“YES” response requires an immediate action. Initial appropriate response.
ITEM YES NO DESCRIPTION / COMMENTS
A. Pipeline Check: Droplets of conveyed fluids
B. Pipeline Check: Discoloration of Pipe or Indication of corrosion
C. Pipeline Check: Nicks or Gouges in
Piping
D. Pipeline Check (suspended pipe):
Bowing of Pipe Between Supports
E. Pipeline Check (below grade):
Localized dead vegetation
F. Pipeline Check: Abrasion at Pipe
Supports, thru points or connections
G. Pipeline Check: Unprotected from
Vehicles
H. Storage of Transfer Hose outside dike
I. Pipeline Connection Vault: Containment area contains debris/fluids
J. Pipeline Connection Vault: Leak
Detection Sensor Inoperable
K. Pipeline Connection Vault: Lid Does not properly secure
Monthly Pipeline & Valve Inspection SPCC Plan – DFSP Point Loma Remediation System
Section 4 Appendix C-18
PIPELINE & VALVE SYSTEM MONTHLY INSPECTION CHECKLIST
L. Valve Check: Discoloration or Indication of corrosion
M. Valve Check: Evidence of Seepage from Seals
N. Valve Check: Improper Positioning of
Valve
O. Valve Check: Lock Missing (if required location for lock)
P. Valve Check: Issue with Operation (i.e.
valve cannot be open/closed)
Q. Are there other conditions which might affect continued safe operation or impact the site spill prevention plan
ADDITIONAL COMMENTS:
Initials of Inspector: Date of Inspection:
Monthly Tank Inspection SPCC Plan – DFSP Point Loma Remediation System
Section 4 Appendix C-3
STI SP001 Monthly Inspection Checklist
Tanks Inspected (ID #’s):
For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.
The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a
Certified inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.
Upon discovery of water in the primary tank, secondary containment area, interstice, or spill container, remove promptly or take other corrective action. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.
(*) designates an item in a non-conformance status. This indicates that action is required to address a problem.
Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.
Retain the completed checklists for 36 months.
In the event of severe weather (snow, ice, wind storms) or maintenance (such as painting) that could affect the operation of critical components
(normal and emergency vents, valves), an inspection of these components is required as soon as the equipment is safely accessible after the event.
Item Task Status Comments
1.0 Tank Containment
1.1 Containment
structure Check for water, debris, cracks or fire hazard
Yes* No N/A
1.2 Primary tank Check for water Yes* No
1.3 Containment
drain valves Operable and in a closed position
Yes No* N/A
1.4 Pathways and
entries
Clear and gates/ doors operable
Yes No* N/A
2.0 Leak Detection
2.1 Tank Visible signs of
leakage Yes* No
2.2 Secondary
containment
Visible signs of leakage from tank into secondary containment
Yes* No
2.3 Surrounding
soil
Visible signs of leakage
Yes* No N/A
2.4 Interstice Visible signs of
leakage
Yes* No N/A
Section 4 Appendix C-4
Item Task Status Comments
3.0 Tank Equipment
3.1 Valves a. Check for leaks. Yes* No N/A
b. Tank drain valves must be kept locked.
Yes* No N/A
3.2 Spill
containment boxes on fill pipe
a. Inspect for debris, residue, and water in the box and remove.
Yes* No N/A
b. Drain valves must be operable and closed.
Yes* No N/A
3.3 Liquid level
equipment
a. Both visual and mechanical devices must be inspected for physical damage
Yes* No N/A
b. Check that the device is easily readable
Yes No* N/A
3.4 Overfill
equipment
a. If equipped with a “test” button, activate the audible horn or light to confirm operation.
This could be battery powered. Replace the battery if needed.
Yes No* N/A
b. If overfill valve is equipped with a mechanical test mechanism, actuate the mechanism to confirm operation.
Yes No* N/A
3.5 Check all tank
openings are properly sealed
Check for leaks corrosion and damage
Yes* No
4.0 Tank Attachments and Appurtances
4.1 Ladder and
platform structure
Secure with no sign of severe corrosion and damage?
Yes No* N/A
5.0 Other Conditions
5.1 Are there other conditions that should
be addressed for continued safe operation or that may affect the site spill prevention plan?
Yes* No
Section 4 Appendix C-5
Additional Comments:
Annual Tank Inspection SPCC Plan – DFSP Point Loma Remediation System
Section 4 Appendix C-7
STI SP001 Annual Inspection Checklist
Tanks Inspected (ID #’s):
For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.
The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a
Certified inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.
Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spill container. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.
In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid level sensing devices to ensure proper operation (40 CFR 112.8(c)(8)(v)).
(*) designates an item in a non-conformance status. This indicates that action is required to address a problem.
Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.
Retain the completed checklists for 36 months.
Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists.
Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.
Item Task Status Comments
1.0 Tank Containment
1.1 Containment
structure Check for:
Holes or cracks in containment well or floor Washout Liner degredataion Corrosion Leakage Paint failure Tank settling
Yes* No N/A
2.0 Tank Foundation and Supports
2.1 Foundation Settlement or
foundation washout?
Yes* No
2.2 Concrete
pad or ring wall
Cracking or spalling? Yes* No N/A
Section 4 Appendix C-8
Item Task Status Comments
2.3 Supports Ceck for corrosion, paint failure, etc.
Yes* No N/A
2.4 Water
drainage
Water drains away from tank?
Yes No* N/A
2.5 Tank
grounding
Strap secured and in good condition?
Yes No* N/A
3.0 Cathodic Protection
3.1 Galvanic
cathodic protection system
Confirm system is functional, includes the wire connections for galvanic systems
Yes No* N/A
3.2 Impressed
current system
a. Inspect the operational components (power switch, meters, and alarms).
Yes No* N/A
b. Record hour meter, ahmeter, and voltmeter readings.
Yes No* N/A
4.0 Tank Shell, Heads, Roof
4.1 Coating Check for coating
failure Yes* No
4.2 Steel
condition
Check for:
Dents Buckling Bulging Corrosion Cracking
Yes* No
4.3 Roof slope Check for low points
and standing water
Yes* No N/A
5.0 Tank Equipment
5.1 Vents Verify that components
are moving freely and vent passageways are not obstructed for:
Emergency vent covers Pressure/vacuum vent poppets Other moving vent components
Yes* No
5.2 Valves Check the condition of
all valves for leaks, corrosion and damage.
Yes* No
Section 4 Appendix C-9
Item Task Status Comments
5.2.1 Anti-siphon, check and gate valves
Cycle the valve open and closed and check for proper operation.
Yes No* N/A
5.2.2 Pressure
regulator valve
Check for proper operation. (Note that there may be small 1/4 inch drain plugs in the bottom of the valve that are not visible by looking from above only)
Yes No* N/A
5.2.3 Expansion
relief valve
Check that the valve is in the proper orientation. (Note that fuel must be discharged back to the tank via a separate pipe or tubing.)
Yes No* N/A
5.2.4 Solenoid
valves
Cycle power to valve to check operation.
(Electrical solenoids can be verified by listening to the plunger opening and closing. If no audible confirmation, the valve should be inspected for the presence and operation of the plunger.)
Yes No* N/A
5.2.5 Fire and
shear valves
a. Manually cycle the valve to ensure components are moving freely and that the valve handle or lever has clearance to allow valve to close completely.
Yes No* N/A
b. Valves must not be wired in open position.
Yes No* N/A
c. Make sure fusible element is in place and correctly positioned.
Yes No* N/A
Section 4 Appendix C-10
Item Task Status Comments
d. Be sure test ports are sealed with plug after testing is complete and no temorary test fixture or component remains connected to valve.
Yes No* N/A
5.3 Interstitial
leak detection equipment-
Check the condition of equipment, including:
The window is clean and clear in sight leak guages.
The wire connections of electronic gauges for tightness and corrosion Activate the test button if applicable.
Yes No* N/A
5.4 Spill
containmen t boxes on fill pipe
a. If corrosion damage, or wear has compromised the ability of the unit to perform spill containment functions, replace the unit.
Yes* No N/A
b. Inspect the connections to the AST for tightness, as well as the bolts, nuts, washer for condition and replace if necessary
Yes* No N/A
c. Drain valves must be operable and closed.
Yes* No N/A
5.5 Strainer a. Check that the
strainer is clean and in good condition.
Yes No* N/A
b. Access strainer basket and check cap and gasket seal as well as bolts.
Section 4 Appendix C-11
Item Task Status Comments
5.6 Filter a. Check that the filter
is in good condition and is within the manufacturer’s expected service life.
Replace as necessary.
Yes No* N/A
b. Check for leaks and decreased fuel flow
Yes No* N/A
5.7 Flame
arrestors
Follow manufacturer’s instructions. Check for corrosion and blockage of air passages.
Yes* No N/A
5.8 Leak
detector for submersible pump systems
Test according to manufacturer’s instructions and authority having jurisdiction (AHJ).
Verify leak detectors are suited and properly installed for aboveground use.
Yes No* N/A
5.9 Liquid level
equipment
a. Has equipment been tested to ensure proper operations?
Yes No* N/A
b. Does equipment operate as required?
Yes No* N/A
c. Follow manufacturer’s instructions.
Yes No* N/A
5.10 Overfill
equipment
a. Follow manufacturer’s instructions and regulatory requirements for inspection and functionality verification.
Yes No* N/A
b. Confirm device is suited for above ground use by the manufacturer
Section 4 Appendix C-12
Item Task Status Comments
6.0 Insulated Tanks
6.1 Insulation Check condition of
instulation for:
Missing sections Areas of moisture Mold Damage
Yes* No N/A
6.2 Insulation
jacket or cover
Check for damage that will allow water intrusion
Yes* No N/A
7.0 Miscellaneous
7.1 Electrical
wiring and boxes
Are they in good condition?
Yes No* N/A
7.2 Labels and
tags
Ensure that all labels and tags are intact and readagble.
Additional Comments:
(Issued September 30, 2015)
EMERGENCY RESPONSE PLAN
The Emergency Response Plan (ERP) must be kept with the Slug Discharge Plan and SPCC Plan at all times. It must be followed in the event of a 'worst case scenario release" that requires rapid/emergency response, such as, when human health & safety is at immediate risk, the release could potentially reach the bay if not contained immediately, or when the release of any known quantity has reached the bay.
Facility Name: DFSP POINT LOMA REMEDIATION SYSTEM Facility Address: NBPL Bldg 604, 199 Rosecrans Street, Point Loma, CA 92106
1. If an unauthorized release occurs, the following actions will be performed:
A. RESTRICT ACCESS TO SPILL AREA. CONTAIN SPILL, IF POSSIBLE. NOTIFY SUPERVISOR
B. ANSWER THE FOLLOWING QUESTIONS:
Substance spilled?
Quantity Spilled: Estimated: Actual:
Location of Spill:
Date Occurred: Time:
Description of Affected Area:
WEATHER CONDITIONS: Wind Direction/Speed: Tide:
Surface Water conditions:
SOURCE: Ship Fuel Dept: Other:
Cause:
Action Taken: _ Estimated Manpower, Material Equipment to Clean/Control Spill:
Assistance from Outside Activities/Agencies:
Actual Man Hours Expended:
Samples were/were not taken:
Containment Method:
Removal Method:
DATE/TIME OF: Discharge stopped:
Corrective action cleanup complete:
Person Making Report: Name:
After Action Report Sent: Y ( ) N ( )
2. THE FACILITY INCIDENT COMMANDER OR FUEL DEPOT DISPATCHER SHALL NOTIFY
AUTHORITIES AS FOLLOWS:
A. WATER OR LAND SPILL: If the hazardous substance is listed on the Business Inventory Plan, and meets or exceeds the reportable quantity, or if oil spill on land is more than 5 gallons; or visible sheen is formed on water surface, every effort possible should be made to notify the Facilities Incident Commander within the first 15 minutes of discovering the spill for instructions. It is important to remember that containment takes precedent over notification, but every effort should be made to notify both the Facilities Incident Commander (FIC), the state Office of Emergency services (OES), and National Response Center (NRC) as soon as possible after the spill has been discovered. Notification of additional authorities can follow later, but not more than 24 hours later.
EMERGENCY RESPONSE PLAN
1. Qualified Individual Facility Incident Commander (619) 726-7423 (CDO); (619) 553-7400 (Base CO)
POC at agency Control number Date: Time: Notified: Y ( ) N ( )
2. NBPL Environmental Department (619) 533-0526
3. National Response Center (NRC) 1-800-424-8802
Control number Date: Time: Notified: Y ( ) N ( )
4. Office of Emergency Services 1-800-852-7550 POC at agency
Date: Time: _ Notified: Y ( ) N ( )
5. Fuel Depot OSOT personnel if required and other OSOT backup if needed.
6. Department of Environmental Health (DEH) Work Hrs (619) 338-2222 After Hrs (619) 565-5659
POC at agency
Date: Time: _ Notified: Y ( ) N ( )
7 Department of Fish and Game (916) 445-0045
8. FLC Terminal Director (619) 553-1314 (office)
(619) 250-9806 (cell) (858) 292-8834 (home) CDO (Pager) (619) 556-5500 PIN 8777
9. NBPL Port Operations Office (if required) (619) 553-9785 (Dispatch)
10. SSC Pacific Marine Mammal Enclosures (water spill only) (619) 206-6828
POC at agency Scott Price; Alt – Dr. Mark Xitco (619) 204-1307
EMERGENCY RESPONSE PLAN
11. Federal Fire Department. 9-911
POC at agency
12. Regional Water Quality Control Board (RWQCB) (619) 516-1990
13. California Highway patrol (if spill is on public highway) 911
13. NAVFAC-SW Water Program Director (619) 532-2273
POC:
Person making notifications:
B. FAX SPILL REPORT ASAP TO THE ENVIRONMENTAL COMPLIANCE MANAGER (Luis Perez) AT 619-553-8657.
C. CLEANUP/CONTAIN SPILL:
1. Water: Activate the On-Scene Operations Team.
2. Land: If substance is relatively harmless and your personnel are trained and have proper protective equipment/tools, clean spill. If substance is hazardous or you are in doubt, contact the Federal Fire Department at 9-911 or Super Facility Incident Commander for assistance.
D. SEND UNIT SITREP AND AFTER ACTION REPORT AS REQUIRED
| Appendix C - List of Forms |
| Daily Readings Flow Meter Data - 2015 |
| System OM Checklist - Weekly - 2015 |
| Liquid Level Gauging Sheets - Weekly - 2015 |
| Liquid Level Gauging Sheets - Monthly - 2015 |
| Liquid Level Gauging Sheets - Semiannual - 2015 |
| Connection 220 Wastewater Sample Log |
| Chain of Custody - System Sampling |
| Calibration Sheet - pH Meter Transmitter |
| Calibration Sheet - Oil Water Meter |
| Calibration Sheet - blank |
| Calibration Log - PID |
| Groundwater Sample Log |
| Chain of Custody - Groundwater Sampling |
| Equipment Service - Quality Control |
| Waste Acceptance Form |
| Monthly Container Inspection - SPCC |
| Monthly Containment or After Storm Inspection - SPCC |
| Monthly Pipe - Valve Inspection - SPCC |
| Monthly Tank Inspection - SPCC |
| Annual Tank Inspection - SPCC |
| Emergency Response Plan - Slug Plan |