Amendment_8.pdf

PDF 47 KB Posted

Attached to
DFSP Point Loma, CA Environmental Remediation Services Federal contract opportunity
Solicitation number
SPE600-17-R-0505
Issued by
Defense Logistics Agency Energy

About this file

SF 30 Solicitation Amendment 0008

View the file

Other files for this federal contract opportunity

Other files attached to DFSP Point Loma, CA Environmental Remediation Services, newest first.
File Type Posted
ATTACH_3_-_Price_Proposal_Workbook_8.30.18.xlsx XLSX spreadsheet
Amend_0015.pdf PDF
SPE600-17-R-0505,_Aug_31,_2018.pdf PDF
Amd_14__SF_30.pdf PDF
PWS_7.17.18.pdf PDF
Amd_13_SF_30.pdf PDF
52.212-5_(Jul_2018).pdf PDF
ATTACH_3_-_Price_Proposal_Workbook_7.2.18(02).xlsx XLSX spreadsheet
Amendment_12.pdf PDF
ATTACHMENT_3_-_Price_Proposal_Workbook_2018-06-08_(Protected).xlsx XLSX spreadsheet
ATTACHMENT_2_-_OSP_6-8-18.docx DOCX document
SPE600-17-R-0505,_June_8,_2018.pdf PDF
ATTACHMENT_2___OFFER_SUBMISSION_PACKAGE.pdf PDF
SPE600-17-R-0505,_April_20,_2018.pdf PDF
Amendment_0011_SF_30.pdf PDF
SF_30_Amendment_10.pdf PDF
Amendment_7_.pdf PDF
Price_Proposal_Workbook_2017-09-25.xlsx XLSX spreadsheet
ATT6_Deliverable_Schedule.pdf PDF
ATT3_Industrial_User_Discharge_Permist.PDF PDF
ATT5_Spill_Prevention,_Control_and_Countermeasures_Plan.pdf PDF
ATT4_Slug_Prevention_and_Control_Plan.pdf PDF
ATT2_CAC_and_Manpower_Reporting_Procedures.pdf PDF
SF_30_Amendment_0004.pdf PDF
ATT1_Quality_Assurance_Surveillance_Plan.pdf PDF
ATT7_O&MServicesEquipList.pdf PDF
ATTACHMENT_2__OFFER_SUBMISSION_PACKAGE_8.28.17.docx DOCX document
ATTACHMENT_4_-_WAGE_DETERMINATIONS.pdf PDF
ATACHMENT_1-_PWS.pdf PDF
ATTACHMENT_7_-__DLA_Energy_19.3.pdf PDF
SPE600-17-R-0505,_August_28,_2017.docx DOCX document
Amendment_0003.pdf PDF
Reduced_Size_Appendix_E_Remediation_System_OEMs_pps._1130_-_2260.pdf PDF
Reduced_Size_Appendix_E_Remediation_System_OEMs_pps._1-1130.pdf PDF
_Reduced_SizeAppendix_D_Original_Equipment_Manufacturers_Manuals.pdf PDF
Appendix_C_Forms.pdf PDF
Appendix_F_IUD_Permit.pdf PDF
Appendix_B_PLC_Data.pdf PDF
Appendix_A_Drawings.pdf PDF
Amendment_2.pdf PDF
Attendance_&_Sign-in_sheet.pdf PDF
Amendment_1_.pdf PDF
Map_to_604.png PNG image
ATTACHMENT_3_-_PRICE_PROPOSAL_WORKSHEET.xlsx XLSX spreadsheet
ATTACHMENT_4_-_WAGE_DETERMINATION.pdf PDF
Draft_SPE600-17-R-0505.pdf PDF
ATTACHMENT_2__OFFER_SUBMISSION_PACKAGE.docx DOCX document
ATTACHMENT_5_-_PAST_PERFORMANCE.docx DOCX document
ATTACHMENT_8_-_JOINT_VENTURE_CONSENT.pdf PDF
ATTACHMENT_6_-_BASE_ACCESSS_PASS_REG.pdf PDF
Show all 50

DFSP Point Loma, CA Environmental Remediation Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

Octover 2, 2017

4. REQUISITION/PURCHASE REQ. NO.

N/A

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE SPE600

DLA Energy - FESAC

8725 JOHN J. KINGMAN RD., SUITE 2945

FT. BELVOIR, VA 22060-6222

BUYER/SYMBOL – Viki Metzger/DLA Energy-FESAC Email –Viki.Metzger@dla.mil

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)

X

9a. AMENDMENT OF SOLICITATION NO.

SPE600-17-R-0505

9b. DATED (SEE ITEM 11)

10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: I2.06 CHANGES-FIXED PRlCE(ALT II,) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A

X

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [X ] is required to sign this document and return ___1____ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A) This amendment to the solicitation published answers to questions submitted in accordance with Amendment 0004 and a revised PWS stating response time of 8 hours.

B) In Accordance With SPE600‐17‐R‐0505 Amendment 0004, any questions that were received by the Government after the due date and time of Monday, September 11, 2017 3:00 P.M. Local Fort Belvoir time has not been addressed.

C) Proposals are to be submitted in accordance with Addendum to 52.212‐1 – INSTRUCTIONS TO OFFERS – COMMERCIAL ITEMS (APR 2014), by the closing date and time. Offerors may choose to submit by hard copy or by e‐mail; e‐mail submission MUST be followed‐up with the number and types of required documents NO LATER THAN FIVE (5) business days after solicitation closing. Proposals must include: Technical Management Proposal Volume I – 5 hard copy & 5 PDF electronic copy (OCR readable); Offeror Submission Package Volume II – 1 hard copy, 1 PDF electronic copy, & 1 MS Excel electronic copy of Attachment 3 – Price Proposal Workbook (OCR readable); and Past Performance Volume III – 1 PDF electronic copy.

D) Proposal are due: October 6, 2017 at 1:00 p.m. local Ft. Belvoir time.

All other terms and conditions remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER (Type or print)

15B. NAME OF CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C.DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C.DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)

Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .