Attachment_6_CLIN_Structure-Scotia_Upgrades.pdf
PDF 12 KB Posted
- Attached to
- Scotia Depot Facility Upgrades Federal contract opportunity
- Solicitation number
- SP8000-17-R-0010
About this file
CLIN Structure
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FINAL-Questions_and_Answers_06-20-17.pdf | ||
| Updated-_FBO_Questions_and_Answers.pdf | ||
| FBO_Questions_and_Answers.pdf | ||
| PWS_Scotia_Carpet_&_Paint_(2017).pdf | ||
| Attachment_1_PRST-Scotia_Upgrades.pdf | ||
| Attachment_7_Past_Performance_Questionnaire-Scotia_Upgrades.pdf | ||
| Attachment_3_Government_Inspection_Report-_Scotia_Upgrades.pdf | ||
| Attachment_5_Wage_Determination-Scotia_Upgrades.pdf | ||
| Attachment_4_ESOHMS_Orientation_Guide-_Scotia_Upgrades.pdf | ||
| CombinedSynopisSolicitation_ScotiaUpgrades.pdf | ||
| Attachment_2_QASP-_Scotia_Upgrades.pdf | ||
| Attachment_8_Provisions_and_Clauses.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN/PRICING STRUCTURE ATTACHMENT 6
Base Period of Performance- Scotia, NY Depot
Line Item 0001 – Scotia Building Upgrades
The Contractor shall provide all labor, administrative support, transportation, supervision, coordination and control of all sub-contractors, equipment, materials, parts, supplies and task(s) performance associated with this PWS. The upgrades include performance of two asbestos abatements, one in building 12 and one in building 22. Ceiling repairs (if needed), priming and painting will be in building 22. The interior walls of buildings 12, 13, 14 and 22 are to be repaired (if needed), primed and painted. Interior floor covering replacements will be performed inside of buildings 12, 13, 14 and 22 (some carpet and some vinyl plank). The exterior of building 13 requires sheet metal siding repairs and painting of the entire exterior of this building only. No exterior painting of buildings 12, 14 and 22 are requested. The Contractor shall also provide electrical disconnection, partial disassembly and temporary relocation, return to original location, reassembly and reconnection electrically of modular office furniture in building 12.
Modular office furniture in building 14 shall be disconnected electrically, disassembled and stored on pallets. This office furniture will not be reassembled or reinstalled.
Period of Performance is 120 calendar days after contract award.
Quantity: 1 Unit Price: N/A Total Price: $
Line Item 0001 – Scotia Building Upgrades