About this file

This document contains questions and answers regarding solicitation number SP3300-20-R-5005 for labor and logistics support services. The solicitation seeks a contractor to provide supervision, labor, material handling equipment, fuels, transportation and other services to support supply management, logistics, warehousing and distribution functions for the Defense Logistics Agency locations at Portsmouth, Virginia. Key details include that the contractor will support receipt, storage, issue and delivery of materials to Naval Sea Systems Command customers including the Norfolk Naval Shipyard. The document clarifies that the warehouse specialist supervisor labor category is exempt from the collective bargaining agreement. It also removes an outdated data item description and provides additional context regarding estimated labor hours in the phase-in period.

View the file

Other files

File Type Posted
Att 2 RFP SP3300-20-R-5005 0009 Tracked Changes.docx DOCX document
Att 5 J.1 PWS SP3300-20-R-5005 0009 Conformed.pdf PDF
Att 4 J.1 PWS SP3300-20-R-5005 0009 Tracked.docx DOCX document
Amendment 0009 SF30 SP330020R5005.pdf PDF
Att 3 RFP SP3300-20-R-5005 0009 Conformed.pdf PDF
Amendment 0008 SF30 SP330020R5005.pdf PDF
Att 2 RFP SP3300-20-R-5005 0008 Conformed.pdf PDF
Att 1 RFP SP3300-20-R-5005 0008 Tracked.docx DOCX document
Att 2 RFP SP3300-20-R-5005 0007 Tracked.docx DOCX document
Att 3 RFP SP3300-20-R-5005 0007 Conformed.pdf PDF
Attachment 1 - Q and A 0007.pdf PDF
Amendment 0007 SF30 SP330020R5005.pdf PDF
Attachment 7 - J.29 - Certification of Offeror's Accounting System.pdf PDF
Att 5 RFP SP3300-20-R-5005 0006 Tracked.docx DOCX document
Attachment 2 J.1 PWS SP3300-20-R-5005 0006 Tracked.docx DOCX document
Attachment 1 - Q and A 0006.pdf PDF
Att 6 RFP SP3300-20-R-5005 0006 Conformed.pdf PDF
Attachment 4 J.25 TE 5.2 Projected Workload.xlsx XLSX spreadsheet
Attachment 3 J.1 PWS SP3300-20-R-5005 0006 Conformed.pdf PDF
Amendment 0006 SF30 SP330020R5005.pdf PDF
Att 2 J.1 PWS SP3300-20-R-5005 0005 Tracked.docx DOCX document
Amendment 0005 SF30 SP330020R5005.pdf PDF
Attachment 1 - Amend 0005 Q and A.pdf PDF
Att 3 J.1 PWS SP3300-20-R-5005 0005 Conformed.pdf PDF
Attachment 1 - Amend 0004 Questions.pdf PDF
Amendment 0004 SF30 SP330020R5005.pdf PDF
Att 2 RFP SP3300-20-R-5005 0004 Tracked.docx DOCX document
Att 5 J.1 PWS SP3300-20-R-5005 0004 Conformed.pdf PDF
Att 3 RFP SP3300-20-R-5005 0004 Conformed.pdf PDF
Att 4 J.1 PWS SP3300-20-R-5005 0004 Tracked.docx DOCX document
Amendment 0003 Attach 1 - RFP.pdf PDF
Amendment 0003 SF30 SP330020R5005.pdf PDF
Amendment 0002 Attach 1 Conformed RFP.pdf PDF
Amendment 0002 SF30 SP330020R5005.pdf PDF
Amendment 0001 SF30 SP330020R5005.pdf PDF
Amendment 0001 Attach 1 Conformed RFP.pdf PDF
Attachment J.7 Past Performance Questionnaire.docx DOCX document
SP3300-20-R-5005 All Pages.pdf PDF
Attachment J.3 - 2017 SAWTST NNSY CBA_signed.pdf PDF
Attachment J.2 - Wage Determination NNSY.pdf PDF
Attachment J.4 pt 1 - DD254 DDPV_NNSY 20R5005 2019.pdf PDF
Attachment J.5 CLIN X004 Labor Rate Table.xlsx XLSX spreadsheet
Attachment J.1 - PWS NNSY 2.26.20.pdf PDF
Attachment J.4 pt 2 - DD254 SP3300-20-R-5005 Continuation Pages.pdf PDF
Attachment J.8 CDRLS.pdf PDF
Attachment J.28 Limitation on Subcontracting.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-20-R-5005

Amendment 0009 Attachment 1: Questions and Answers

Question
RFP Page OR

Pre-Proposal Conference OR Site Visit/GFP/GFE Review/Inspection

RFP Para Reference (if question relates to the RFP)
Government Response
1
The answer to multiple questions posted with Amendment 0004 clarifies the labor category of the 2nd Key Personnel as “Warehouse Specialist Supervisor”. The answer to question 31 of Amendment 0004 states that Table 2 Exempt/CBA categories added to RFP, ostensibly to identify those labor categories that are subject to the CBA and those that are not. Table 2 shows that the “Warehouse Specialist Supervisor” and the “Warehouse Specialist Lead” are CBA labor categories. However, the CBA does not differentiate between “Warehouse Specialist Supervisor” and the “Warehouse Specialist Lead”. CBA Article 23 states, “Lead-persons shall be a working member of a group who is responsible for leading, directing, instructing, on-the-job training, and checking or approving the work of his/her assigned group.” Article 23 further states, “Lead-persons will receive a premium of $1.00 per hour in addition to his normal rate of pay.” Please confirm that the “Warehouse Specialist Supervisor” is classified as a CBA labor category.
Amend

0004, Att. 1 multiple pages and Att. J3 page 20.

Amend 0004, Att. 1 Questions and Att. J3 CBA.

RFP has been updated to reflect the Warehouse specialist supervisor as “exempt”.

2
1. The MCCP is listed as CDRL A009 in the RFP and PWS. CDRL A009 block 16 says “Submit electronically with proprosal.”

a. Should the MCCP be submitted as an Appendix within the Technical Proposal or as a stand-alone document?

b. Or should the MCCP be submitted within the Technical Proposal, and if so, is it included in the page count of the Technical Proposal?

c. Will the MCCP be evaluated with the Technical Proposal?

RFP CDRL A009
PROPOSAL PREPARATION REQUIREMENTS
CDRL A009 has been removed from this requirement as it does not apply.
3
2. CDRL A009 block 16 mentions other references to deliverable plans (QC Plan, SSDRP, Customer Service Plan, ESDS Plan, SOH Plan, Security Plan, and Storage Plan).

• Where are the CDRLs for the SSDRP, Customer Service Plan, ESDS Plan Security Plan, and Storage Plan requirements? They are not included in the J.8 Attachment.

RFP CDRL A009
PROPOSAL PREPARATION REQUIREMENTS
· SSDRP has been renamed MECSP and is CDRL A004,

· CDRL A009 has been removed via amendment 0009 however, the MECSP still applies.

· Per Attachment J.1 page 31: The NNSY Physical Security Plan Security Plan, which addresses specific procedures for identification (ID) and control of all visitors to warehousing and administrative areas, can be found in the technical library and is not required to be provided by the offeror.

4
In reviewing the government’s Estimated Labor Hours in Table 2, the Phase-In (4 Mo) period lists estimated hours for various labor categories and not others. Given that any new contractor will attempt to hire as many incumbent personnel as possible, are we to assume that the Labor Category hours listed in the Phase-In period are for positions that are vacant on the existing contract or new for the follow-on contract?
Amend 8

Pg 68 Section L Section 2 SubFactor (b) Table 2 No, this is an estimate of what the Government feels it would take to get the job done and has nothing to do with the current FTE strength of the incumbent. Offerors are to propose what they feel is necessary.