C-6__SP3300-19-R-5002_Questions_-_Part_5_(5-1-19).docx
DOCX document 14 KB Posted
- Solicitation number
- SP330019R5002
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document contains questions and answers regarding a solicitation for chemical management and third party logistics services. The solicitation is for the Warner Robins Air Logistics Complex and seeks services including hazardous waste management, containerization, and documentation. The Defense Logistics Agency Distribution is the contracting agency. The questions clarify schedules for issue center buildings, remove duplicate schedule entries, and explain that the contractor may generate required waste forms and labels from the ESSOH-MIS system and may be responsible for waste containerization. Containerization and documentation requirements include use of proper labels, profile sheets, and safety data sheets.
Additional Vendor Questions and Government Responses
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question
| RFP Page OR Pre-Proposal Conference OR Site Visit/GFP/GFE Review/Inspection |
| RFP Para Reference (if question relates to the RFP) |
| Government Response |
| 112 |
| The revised Issue Centers schedules deleted AMXG buildings 50, 54, 59, 89, 125, and 20095 (all shifts) and 1st shift for building 20137. Please confirm this new AMXG Schedule representation is correct? |
| RFP Attachment J-1, update posted 26 Apr 19 |
| PWS para 5.8.J. Page C-48 through C-49, Issue Center Schedules |
| Yes it is correct. |
| 113 |
| The revised Issue Centers schedules list MXSG Building 321 schedule for 1st shift twice (very near the top of the first page of the table and again as the second and third to last entries of the table). It appears these are duplicate requirements. Please clarify. |
| RFP Attachment J-1, update posted 26 Apr 19 |
| PWS para 5.8.J. Page C-48 through C-49, Issue Center Schedules |
| The PWS is corrected to remove the duplicate shift |
| 114 |
| The “* Schedule for AMXG, Building 20137” immediately following the Issue Centers schedule table is confusing as it appears to contradict the schedule presented in the table by listing the same days of the week twice, e.g. Sun-Mon, Mon-Tue, etc. Please clarify the purpose of this information and how it changes or impacts the schedule for AMXG 3rd shift requirements presented in the table. |
| RFP Attachment J-1, update posted 26 Apr 19 |
| PWS para 5.8.J. Page C-48 through C-49, Issue Center Schedules |
| The information is correct as it pertains to the 3rd shift. |
| 115 |
| In section 5.7 of the PWS, section H. states that the contractor shall “properly document” material for transfer with the: HW Labels, profiles sheets, HW Contractor required forms and current SDS. Will these forms/labels be provided by the government upon request or are these items the contractor can print themselves from EESOH-MIS? Will the contractor be responsible for any HW containerization, or is this all performed by the HW Service provider upon notification? |
| RFP Attachment J-1 |
| PWS para 5.7.H., page C-47 |
| Yes ESSOH-MIS provides the capability to generate required HW forms and labels. The Contractor may be required to containerize HW, if required. |
File details come from the government source that posted it. Updated .