This document contains questions and responses related to Amendment 0001 of solicitation SP3300-19-R-5002 for Chemical Management Services (CMS) and Third Party Logistics (3PL) for Warner Robins Air Logistics Complex (WR-ALC). The Defense Logistics Agency Distribution is seeking these services to support various buildings and shifts at Robins Air Force Base, as outlined in the revised Issue Center schedules in Attachment J-1 of the Performance Work Statement. Questions clarify changes to the required service locations and shifts, as well as whether required waste labeling and documentation will be provided by the Government. Responses confirm the revisions to building coverage in the Issue Center schedules, correct a duplicate entry, and clarify that the contractor can generate required waste forms and labels using the ESSOH-MIS system while the Government remains responsible for waste containerization activities.

Questions - Part 5 - Amendment 0001

View the file

Other files

File Type Posted
SP3300-19-R-5002_0004_6-26-19.pdf PDF
Amendment_0004_-_RFP_-_SP330019R5002_-_CONFORMED.pdf PDF
Amendment_0004_-_RFP_-_SP330019R5002_-_track_changes.doc DOC document
Amendment_0003_-_RFP_-_SP330019R5002_-_Track_Changes.doc DOC document
SP3300-19-R-5002_0003_6-10-19.pdf PDF
CDRL_A023_-_Conformed_Technical_Proposal_dated_6.7.19.pdf PDF
Amendment_0003_-_RFP_-_SP330019R5002_-_CONFORMED.doc DOC document
CDRL_A024_-_Conformed_Cost_Price_Proposal_dated_6.7.19.pdf PDF
Amendment_0002_-_RFP_-_SP330019R5002_-_for_posting.pdf PDF
SP3300-19-R-5002_0002_5-31-19.pdf PDF
Amendment_0001_-_SP3300-19-R-5002_Questions_-_Part_6_(5-28-19).docx DOCX document
Amendment_0001_-_SP3300-19-R-5002_Questions_-_Part_2.docx DOCX document
Amendment_0001_-_SP3300-19-R-5002_Questions_-_Part_1.docx DOCX document
TE_5.2_CMXG_VATS.xlsx XLSX spreadsheet
Amendment_0001_-_SP3300-19-R-5002_Questions_-_Part_4.docx DOCX document
SP3300-19-R-5002_0001_5-28-19.pdf PDF
Amendment_0001_-_SP3300-19-R-5002_-_Attachment_J1_-_PWS_(5-28-19).docx DOCX document
Amendment_0001_-_RFP_-_SP330019R5002_-_for_posting.pdf PDF
Amendment_0001_-_SP3300-19-R-5002_Questions_-_Part_3.docx DOCX document
CDRLs.zip ZIP file
Attachment_J.2_-_Wage_Determination_2015-4495_Rev_8_-_Dec_2018.pdf PDF
C-6_-_RFP_SP330019R5002_-_Sections_A-M.pdf PDF
Attachment_J.4_-_Small_Business_Participation_Commitment_Document_Template.docx DOCX document
Attachment_J.5_-__Subcontracting_Plan_Template_-Includes_Elements_1-15.docx DOCX document
Attachment_J.6_-_DD254.pdf PDF
Technical_Exhibits.zip ZIP file
Attachment_J.3_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_J.1_-_PWS_(5-3-19).pdf PDF
C-6__SP3300-19-R-5002_Questions_-_Part_5_(5-1-19).docx DOCX document
C-1__Synopsis_Mod9_-_SP3300-19-R-5002_Questions_-_Part_1_(4-26-19).docx DOCX document
C-1__Synopsis_Mod9_-_SP3300-19-R-5002_Questions_-_Part_3_(4-26-19).docx DOCX document
C-1__Synopsis_Mod9_-_SP3300-19-R-5002_Questions_-_Part_4_(4-26-19).docx DOCX document
C-1__Synopsis_Mod9_-_SP3300-19-R-5002_Questions_-_Part_2_(4-26-19).docx DOCX document
C-1__Synopsis_Mod8_-_Updated_DRAFT_PWS_-_4.26.19.docx DOCX document
C-1__Synopsis_Mod6_-_HAZMAT_PPC_site_visit_attendee_sheet_Redacted.pdf PDF
C-1__Synopsis_Mod6_-_HAZMAT_PPC_-_KTR_feedback.docx DOCX document
C-1__Synopsis_Mod6_-_Pre-Proposal_Conference_-_FINAL_-_for_posting.pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.10_B20137_PHARMACY.pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.12_CMXG_PHARMACY_AND_POUs.pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.8_B125__PHARMACY_(ISSUE_CENTER).pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.15_MXSG_PHARMACY_AND_POUs_(Part_2).pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.9_B20095_(91)_PHARMACY_(ISSUE_CENTER).pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.6_B54_PHARMACY_(ISSUE_CENTER).pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.4_AMXG_POU_Cabinets.pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.11_B158_PHARMACY_AND_POUs.pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_1.1_Environmental_Requirements.docx DOCX document
C-1__Synopsis_-_Mod5_-_DRAFT_TE_2.1_Definitions_and_Acronyms.doc DOC document
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.14_MXSG_PHARMACY_AND_POUs.pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.13_EMXG_PHARMACY_AND_POUs.pdf PDF
C-1__Synopsis_-_Mod5_-_DRAFT_TE_5.7_B59_PHARMACY_(ISSUE_CENTER).pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: SP330019R002

Amendment 0001 Question and Responses – Part 5

Question
RFP Page OR Pre-Proposal Conference OR Site Visit/GFP/GFE Review/Inspection
RFP Para Reference (if question relates to the RFP)
Government Response
114
The revised Issue Centers schedules deleted AMXG buildings 50, 54, 59, 89, 125, and 20095 (all shifts) and 1st shift for building 20137. Please confirm this new AMXG Schedule representation is correct?
RFP Attachment J-1, update posted 26 Apr 19
PWS para 5.8.J. Page C-48 through C-49, Issue Center Schedules
Yes, it is correct.
115
The revised Issue Centers schedules list MXSG Building 321 schedule for 1st shift twice (very near the top of the first page of the table and again as the second and third to last entries of the table). It appears these are duplicate requirements. Please clarify.
RFP Attachment J-1, update posted 26 Apr 19
PWS para 5.8.J. Page C-48 through C-49, Issue Center Schedules
See revised PWS Section 5.8, Paragraph J, Table. The PWS is corrected to remove the duplicate shift.
116
The “* Schedule for AMXG, Building 20137” immediately following the Issue Centers schedule table is confusing as it appears to contradict the schedule presented in the table by listing the same days of the week twice, e.g. Sun-Mon, Mon-Tue, etc. Please clarify the purpose of this information and how it changes or impacts the schedule for AMXG 3rd shift requirements presented in the table.
RFP Attachment J-1, update posted 26 Apr 19
PWS para 5.8.J. Page C-48 through C-49, Issue Center Schedules
The information is correct as it pertains to the 3rd shift. Sunday work commences at 2300 and ends Monday at 0730; Monday work commences 2300 and ends at 0730 Tuesday, etc. Thursday work commences at 2300 and ends at 0730 Friday and work doesn’t commence again until Sunday at 2300.
117
In section 5.7 of the PWS, section H. states that the contractor shall “properly document” material for transfer with the: HW Labels, profiles sheets, HW Contractor required forms and current SDS. Will these forms/labels be provided by the government upon request or are these items the contractor can print themselves from EESOH-MIS? Will the contractor be responsible for any HW containerization, or is this all performed by the HW Service provider upon notification?
RFP Attachment J-1
PWS para 5.7.H., page C-47
Yes. ESSOH-MIS provides the capability to generate required HW forms and labels. The Government will be responsible for HW containerization.