SP330013R5002_QASP_for_FBO_Post.docx

DOCX document 259 KB Posted

Attached to
Hazardous Materials Management (3PL) Services in support of the Marine Corps and Navy organizations located in Okinawa, Japan
Solicitation number
SP3300-13-R-5002
Issued by

About this file

SP3300-13-R-5002 Quality Assurance Surveillance Plan (QASP)

View the file

Other files

File Type Posted
SF33_SP330013R5002_Amendment_0003.pdf PDF
Amendment_0003_SP330013R5002_6-11-13.pdf PDF
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0003_for_FBO_Post.docx DOCX document
Attachment_2_Questions_and_Answers_SP330013R5002_Amendment_0003_for_FBO_Post.docx DOCX document
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0003_with_accepted_changes.pdf PDF
EMSP_11_2_Spill_Response_and_Notification_Procedures_(EN)__ver_5_for_FBO_Post_via_Amendment_0002.pdf PDF
TE_5_6_GF_Gas_Cylinders_conformed_thru_SP330013R5002_Amendment_0002_for_FBO_Post.pdf PDF
JEMMS_SOW_SP330013R5002_Attachment_2_to_Amendment_0002_for_FBO_Post.docx DOCX document
Marine_Corps_Order_MCSN's_and_NSN's_for_FBO_Post_via_Amendment_0002.pdf PDF
Attachment_3_Questions_and_Answers_SP330013R5002_Amendment_0002_for_FBO_Post.docx DOCX document
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0002_for_FBO_Post.docx DOCX document
Amendment_0002_SP330013R5002_6-5-13.pdf PDF
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0002_with_accepted_changes.pdf PDF
TE_5_5_Performance_Requirements_Summary_conformed_thru_SP330013R5002_Amendment_0002_for_FBO_Post.doc DOC document
EMSP_11_1_2_UER_Spill_Report_Form_ver_2_for_FBO_post_via_Amendment_0002.docx DOCX document
SP330013R5002_PPC_slides_for_FBO_Post_.ppt PPT presentation
JEMMS_SOW_SP330013R5002_Attachment_2_to_Amendment_0001_Final.docx DOCX document
Amendment_0001_SP330013R5002_5-15-13.pdf PDF
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0001.docx DOCX document
Revised_PPC_Check-In_Location_From_Terrace_Garden_Mihama_to_Gate_5_Camp_Foster.pdf PDF
Revised_PPC_Check-In_Location_From_SeaSide_Hotel_to_Camp_Foster_Gate_5.pdf PDF
Revised_PPC_Check-In_Location_From_Sunny's_Project_Condominiums_to_Camp_Foster_Gate_5.pdf PDF
Revised_PPC_Check-In_Location_From_Hamagawa_Lodge_to_Camp_Foster_Gate_5.pdf PDF
Windshield_Tour_Schedule_for_Site_Visit_SP330013R5002.xlsx XLSX spreadsheet
Revised_PPC_Check-In_Location_From_Beach_Tower_to_Camp_Foster_Gate_5.pdf PDF
Exhibit_A_Attachment_J.2_CDRLs_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.4-_Past_Performance_Questionnaire_SP330013R5002_for_FBO_FINAL.docx DOCX document
Attachment_J.3_TE_5.6_Gas_Cylinders_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_2.1_Definitions_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.5_Performance_Requirements_Summary_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.4_Inventory_DMD_History_BY_CY_SP330013R5002_for_FBO_FINAL.xlsx XLSX spreadsheet
Attachment_J.3_TE_5.2_Mileage_Chart_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_3.2_GFE_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_3.1a_GFF-_Camp_Hansen_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.3b_HW_Pick_Up_Points_and_Schedule_SP330013R5002_for_FBO_FINAL.pdf PDF
JEMMS_RFP_SP330013R5002_for_FBO_Final.docx DOCX document
Attachment_J.3_TE_5.3a_HM_Drop_Points_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.1_Map_of_Okinawa_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_4.1_CFM_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_3.1b_GFF-_Camp_Kinser_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.7_LFORM_Breakdown_SP330013R5002_for_FBO_FINAL.xlsx XLSX spreadsheet
SF33_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.1_SOW_for_FBO_Final.docx DOCX document
Draft_Attachment_J.3_TE_3.2_GFE_SP330013R5002_for_FBO_5-3-13.pdf PDF
Draft_Attachment_J.3_TE_5.4_Inventory_DMD_History_BY_CY_SP330013R5002_for_FBO_5-3-13.xlsx XLSX spreadsheet
Draft_Exhibit_A_Attachment_J.2_CDRLs_SP330013R5002_for_FBO_5-3-13.pdf PDF
Draft_Attachment_J.3_TE_5.5_Performance_Requirements_Summary_SP330013R5002_for_FBO_5-3-13.pdf PDF
DRAFT_RFP_SP330013R5002_for_FBO_5-3-13.docx DOCX document
Draft_Attachment_J.3_TE_3.1b_GFF-_Camp_Kinser_SP330013R5002_for_FBO_5-3-13.pdf PDF
Draft_Attachment_J.3_TE_5.1_Map_of_Okinawa_SP330013R5002_for_FBO_5-3-13.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

(QASP)

Defense Logistics Agency Joint Environmental Material Management Services Okinawa, Japan

May 2013

Approved: ___________________________ Margaret Ross, Contracting Officer

Date: ___________________________

Quality Assurance Surveillance Plan

(QASP)

(4-18-13)

Table of Contents

1.Overview3
1.1Contract Quality Requirements4
2.Responsibilities for Quality4
2.1DLA Contract Quality Assurance Program Office4
2.2Contractor5
2.3Contracting Officer’s Representative (COR)/Technical Point of Contact (TPOC)6
3.Principles of Surveillance6
3.1QASP Implementation and Execution6
3.2Surveillance Planning and Scheduling7
3.3Quality Checklists7
3.4Documentation7
3.5Modifications8
4.Quality Policies, Procedures, and Helpful Aids8
4.1The 8-Step Surveillance Process8
4.2Surveillance Methods9
4.3Surveillance Tools9
4.3.1Surveillance Method Selection Tool (SMST)9
4.3.2Surveillance Action Selection Tool (SAST)9
5.Surveillance Activities for Specific Tasks10
5.1Acceptable Performance Level (APL) Surveillance10
5.1.1APL Category Definitions10
5.1.2Monitoring APLs10
5.2Non-APL Surveillance Requirements10

1. Overview This Quality Assurance Surveillance Plan (QASP) has been developed to supplement quality control efforts and provide a framework for performing quality assurance for DLA contracts within the enterprise. The responsibility for the administration of the contract is the DLA Distribution, J7-AB Acquisition Operations. This surveillance plan is intended for enterprise-wide implementation. Additionally, this QASP has been developed to address DLA Accountability Office, Office of Internal Review, findings and recommendations (Audit Report DAO-09-20).

The solicitation for the Joint Environmental Material Management Services (JEMMS) is issued as a performance-based solicitation as defined in FAR 37.601. A performance-based contract ensures the required performance quality levels are achieved and the total payment is related to the degree services performed or outcomes achieved meet contract standards.

FAR 37.602-2 requires agencies to develop a QASP when acquiring services through performance-based contracts. The QASP recognizes the responsibility of Contractor to carry out its quality control (QC) obligations and contains measurable inspection and acceptance criteria corresponding to the performance standards contained in the contract. The QASP focuses on the level of performance required rather than the methodology used by the Contractor to achieve that level of performance.

Contract performance incentives, whether positive, negative, or both, are incorporated into performance-based contracts to the maximum extent possible to encourage Contractors to increase efficiency and maximize performance. The specific performance standards in the QASP must correspond to these incentives and must be capable of objective measurement.

The FAR, including Part 46, Quality Assurance, “prescribes policies and procedures to ensure that supplies and services acquired under Government contract conform to the contract’s quality and quantity requirements. Included are inspection, acceptance, warranty, and other measures associated with quality requirements.”

In order to verify fulfillment of the requirements for performance-based contracting, the contract must use measurable performance standards (e.g., in terms of quality, timeliness, and quantity). The COR and TPOC use the QASP as their guide for the verification process. This QASP complies with the requirements of FAR Parts 37 and 46 and serves as the COR/TPOC’s guide to monitoring Contractor performance in accordance with (IAW) the Statement of Work (SOW). It is organized into three major headings: Overview and Organization, Principles of Surveillance, and Surveillance Activities for Specific Tasks. The content outline above identifies further subdivisions of these sections. This outline also serves as the Table of Contents. The various headings and page references are hyperlinked to detailed topical discussions in the QASP.

A well implemented quality program includes two essential elements. The Contractor implements their Quality Control/Customer Satisfaction Plan (QC/CSP) through QC inspections of the services they perform IAW with contract requirements. The COR/TPOC performs Quality Assurance (QA) on the Contractor IAW the QASP to ensure acceptable performance is achieved.

1.1 Contract Quality Requirements

The FAR (46.202) identifies four general categories of contract quality requirements, depending on the extent of QA needed by the Government for the acquisition involved:

Contracts for commercial items Government reliance on inspection by the Contractor Standard inspection requirements Higher-level contract quality requirements.

“Standard inspection requirements” is the primary category of inspection required in this contract. As specified in FAR 46.202-3, standard inspection requirements:

Require the Contractor to provide and maintain an inspection system that is acceptable to the Government Give the Government the right to make inspections and tests while work is in process Require the Contractor to keep complete, and make available to the Government, records of its inspection work Responsibilities for Quality Responsibilities for contract QA are defined in FAR Part 46 for the Contracting Office, DLA, and the Contractor. Highlights of responsibilities are included in the following sub-paragraphs.

2.1 DLA Contract Quality Assurance Program Office

· Develops and applies efficient procedures for performing government QA actions under the contract IAW the written direction of the KO.

· Ensures the COR/TPOC performs all actions necessary to verify whether the supplies or services conform to contract quality requirements.

· Develops, tests, and fields automated Quality Management Tool (QMT) to facilitate enterprise-wide collection and reporting of quality related operational information.

· Monitors COR/TPOC work products to ensure non-conformances are identified.

· Establishes the significance of a nonconformance when considering the acceptability of supplies or services which do not meet contract requirements.

· Maintains, as part of the performance records of the contract, suitable records including:

· The nature of Government contract QA actions, including, when appropriate, the number of observations made and the number and types of non-conformances.

· Decisions regarding the acceptability of the products, the processes, and the requirements, as well as actions taken to correct nonconforming items.

· Implements any specific written instructions from the contracting officer.

· Recommends any changes necessary to the contract, specifications, instructions, or other requirements that will improve effective operations or eliminate unnecessary costs.

· Develops and provides specifications for inspection, testing, and other contract quality requirements essential to ensure the integrity of the supplies or services.

· Prescribes contract quality requirements, such as inspection and testing requirements, or, for service contracts, a QASP.

2.2 Contractor

The Contractor is responsible for carrying out its responsibilities under the contract by:

Controlling the quality of supplies or services Tendering to the Government for acceptance only those supplies or services which conform to contract requirements Ensuring vendors or suppliers of raw materials, parts, components, subassemblies, and others have an acceptable QC system Maintaining substantiating evidence, when required by the contract, that the supplies or services conform to contract quality requirements, and furnishing such information to the Government, as required

The Contractor provides and maintains an inspection system or program for the control of quality that is acceptable to the Government (See QC/CSP requirements in SOW).

The control of quality by the Contractor may relate to, but is not limited to:

Fabrication and delivery of products to ensure only conforming products are tendered to the Government Technical documentation, including drawings, specifications, handbooks, manuals and other technical publications Procedures and processes for services to ensure services meet contract performance requirements Training all appropriate personnel in the purpose, use, and implementation of the QC/CSP The Contractor is responsible for performing all inspections and tests required by the contract except those specifically reserved for performance by the Government.

2.3 Contracting Officer’s Representative (COR)/Technical Point of Contact (TPOC) The COR/TPOC’s quality responsibilities include:

· The Contracting Officer’s Representative (COR) is responsible for assuring the QASP is implemented.

Ensure all appropriate personnel attend training in the purpose, use, and implementation of the QASP.

Implement the QASP, to include developing surveillance schedules, performing surveillance, and documenting and reporting results.

Monitor and review the QASP for effectiveness.

Report to the contracting office any non-conformances observed in design or technical requirements including contract quality requirements based on escalation guidance and the Surveillance Action Selection Tool (SAST).

Principles of Surveillance The inspection and acceptance clauses contained within the contract allow the COR/TPOC to implement QA procedures. Other contract clauses require the Contractor to implement a QC/CSP, resulting in the Contractor being responsible for quality control assessments of goods and services produced. The Government is responsible for QA, surveillance, monitoring, and evaluation of the Contractor’s quality performance. This concept, defined in FAR 46.101, says Government contract QA means “the various functions, including inspection, performed by the Government to determine whether a contractor has fulfilled the contract obligations pertaining to quality and quantity” (emphasis added).

The QASP focuses on corroborating the quality and timeliness of the products and services received from the Contractor and the fulfillment of contract requirements including both APLs and 'non-APLs' – those mandatory requirements commonly referred to as “Contractor Shalls”.

3.1 QASP Implementation and Execution

Successful implementation of the QASP is based upon careful planning and targeted use of the following:

Surveillance planning and scheduling.

Performing surveillance, including complete documentation.

Data analysis of surveillance results.

Reporting the results of surveillance.

The following three objectives are the cornerstones for the COR/TPOC’s daily surveillance activities and remain critical to QASP implementation:

Monitor the Contractor compliance status to established APL and non-APL requirements Verify the Contractor’s compliance with their QC/CSP Document surveillance observations and findings Analyze and report surveillance results to the Contractor and DLA Distribution

3.2 Surveillance Planning and Scheduling

An annual Surveillance Plan, which identifies the surveillance activities, frequencies, priorities, and Points of Contact (POCs) for monitoring the SP’s performance requirements, documents the COR/TPOC’s inspection objectives for the year. This plan is created in the QMT and is made available to the COR, the DLA Chemical Management Services (CMS) Program Manager, and the Contracting Officer (KO), for approval. Based on the approved annual surveillance plan requirements, the COR updates the monthly surveillance schedule in the QMT to identify required monthly surveillance events and frequencies. The COR/TPOC update surveillance records to identify the surveillance activities and results for each surveillance activity performed during the month. The SL adjusts the monthly surveillance schedules as required to achieve targeted surveillance objectives. The SL incorporates time to validate user complaint items into the surveillance schedule to the extent possible. Key among the SL’s responsibilities are scheduling surveillance and tracking, analyzing, and reporting surveillance results.

During all periods of the Contractor performance, the COR retains a copy of all surveillance schedules, Surveillance Reports (SRs), User Complaint Records (UCRs), and other performance documentation. The COR either retains these records or forwards them to the KO at the end of the contract for inclusion in the contract file.

3.3 Quality Checklists

The quality assurance and surveillance relies on using standardized template checklists within QMT to conduct most surveillance activities. These template checklists are designed to document QA activities so that the COR/TPOC and the Contractor can better focus on issues, respond in a timely manner, develop best business practices to improve customer service, and consistently document performance.

The DLA Distribution’s policies and procedures for using checklists and for helping a COR/TPOC implement its QA surveillance responsibilities are in the DLA Distribution Handbook for Oversight of Depot Operations (hereinafter referred to as “the Handbook”).

QA surveillance checklists within the QMT are modified and/or updated as approved modifications or changes are made to performance requirements. Every effort is made to standardize surveillance requirements across the distribution enterprise.

3.4 Documentation

Documentation of the Contractor performance provides, if needed, a legal basis for the Government to make decisions and take action. Informal or anecdotal evidence does not provide sufficient justification to reward (i.e., award/incentive fee) the Contractor or to initiate corrective actions. Properly completed surveillance documentation is objective: it is equally important to document both conforming and nonconforming performance. Documentation of conforming performance assists in validating proper implementation and execution of contract requirements. The vast majority of surveillance generally results in documenting conforming performance. Documentation of nonconforming performance identifies areas where the Contractor’s performance does not meet contract requirements and where re-performance of nonconforming services or corrective action may be needed.

It is critically important the COR/TPOC regularly documents and reports on the Contractor’s performance as required by the surveillance schedules. If there is a pattern of forbearance or letting substandard performance go without the Government taking action, then the Government may lose its legal right to enforce contract performance provisions.

3.5 Modifications

The Contracting Office or DLA may unilaterally modify surveillance requirements (i.e., input from the contractor is neither needed nor required). Such modifications are not subject to the modification clauses in the contract and are not grounds for the Contractor to increase the cost of performance. Conversely, bi-lateral modifications involve a negotiated approach and may or may not increase the cost of performance. In either case, modifications or changes to service requirements will be evaluated and changes to the surveillance requirements and/or QA template checklists in the QMT made accordingly by DLA Distribution through the changes request process.

While modifications refer to changes in the surveillance requirements, typically driven by contracts operational performance requirements, modifications do not refer to monthly adjustments in surveillance schedules by the COR/TPOC personnel or other representatives. The Handbook provides more detailed information on specific roles and responsibilities.

Quality Policies, Procedures, and Helpful Aids The Handbook provides the COR/TPOC with specific policies, procedures, tools, and aids to help implement their QA responsibilities. This paragraph, the Handbook, and the QMT are the key tools and references the COR/TPOC uses to conduct and document its QA surveillance activities.

4.1 The 8-Step Surveillance Process

The 8-Step surveillance process described in the Handbook is the mandated framework outlining the process by which the COR/TPOC will implement all surveillance activities. The 8-Step Surveillance Process is as follows:

Identify the APL/non-APL criteria for surveillance activity.

Review all relevant documentation.

Complete the pre-surveillance sections of the SR.

Conduct surveillance.

Document observations in the post surveillance sections of the SR.

Analyze the results.

Make recommendations and report findings.

File SR, with all supporting documentation.

4.2 Surveillance Methods

The surveillance methods described in the Handbook, apply to surveillance/monitoring of all contract requirements. DLA Distribution has recommended an appropriate method(s) to employ for each requirement. The following is a list of the recognized methods of surveillance:

Direct Observation Random Visual Inspection Management Information System (MIS) One Hundred Percent (100%) Inspection Validated Customer Complaints Random Sampling

4.3 Surveillance Tools

Two tools are provided to the COR/TPOC in order to help schedule surveillance activities and enforce the Contractor compliance. The tools are described in detail in the Handbook. The tools are also available electronically in the QMT. The following sections describe the purpose of each tool.

4.3.1 Surveillance Method Selection Tool (SMST)

The SMST is used by the COR/TPOC to determine how surveillance should be conducted on a contract requirement. The SMST guides the COR/TPOC through a series of questions about the surveillance activity ranging from whether or not the surveillance activity was scheduled to the significance level of the activity. The SMST recommends a list of surveillance methods that are available to be applied to the surveillance activity.

4.3.2 Surveillance Action Selection Tool (SAST)

The SAST is used by the COR/TPOC to determine the appropriate course of action following the documentation of the Contractor non-compliance. The SAST relies upon surveillance frequency, number of nonconforming surveillance reports, and requirement significance to recommend the appropriate Government course of action. The course of action will range from filling out a nonconforming surveillance report to notifying the KO and suggesting a Contractor Discrepancy Report (CDR).

Surveillance results of chance discoveries will not be used to determine follow-on actions as recommended by the SAST.

Surveillance Activities for Specific Tasks The following are approaches that the COR/TPOC uses to conduct surveillance activities for specific tasks IAW contract requirements:

5.1 Acceptable Performance Level (APL) Surveillance

5.1.1 APL Category Definitions

APLs are segregated into two categories; timeliness and quality. Distribution functions may have one or both types of APLs associated with them. The following provides definitions for the APL categories:

Timeliness – The APL standard is measured by whether the requirement or function is met in a pre-determined period of time.

Quality – The APL standard is measured by whether the requirement or function meets a pre-determined quality standard

5.1.2 Monitoring APLs

DLA CMS PM and the COR are responsible for providing rationale for significant instances of non-conformance as they track each APL throughout the month. The COR will prepare and upload to the COR Tracking (CORT) Tool a report covering Contractor conformance/non-conformance for the preceding month. For all non-conformances, a detailed explanation including potential causes for the non-conformance and corrective actions being taken to resolve or mitigate the non-conformance is required.

5.2 Non-APL Surveillance Requirements

The COR/TPOC will conduct surveillance processes utilizing the QMT application. Each functional area has associated surveillance templates and checklists to be used during surveillance events. The COR/TPOC utilizes a Surveillance Report (SR) to record and document individual surveillance events IAW DLA Distribution QMS Policy and training guidance.