SP3300-13-R-5002 Pre-Proposal Conference Slides

View the file

Other files

File Type Posted
SF33_SP330013R5002_Amendment_0003.pdf PDF
Amendment_0003_SP330013R5002_6-11-13.pdf PDF
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0003_for_FBO_Post.docx DOCX document
Attachment_2_Questions_and_Answers_SP330013R5002_Amendment_0003_for_FBO_Post.docx DOCX document
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0003_with_accepted_changes.pdf PDF
EMSP_11_2_Spill_Response_and_Notification_Procedures_(EN)__ver_5_for_FBO_Post_via_Amendment_0002.pdf PDF
TE_5_6_GF_Gas_Cylinders_conformed_thru_SP330013R5002_Amendment_0002_for_FBO_Post.pdf PDF
JEMMS_SOW_SP330013R5002_Attachment_2_to_Amendment_0002_for_FBO_Post.docx DOCX document
Marine_Corps_Order_MCSN's_and_NSN's_for_FBO_Post_via_Amendment_0002.pdf PDF
Attachment_3_Questions_and_Answers_SP330013R5002_Amendment_0002_for_FBO_Post.docx DOCX document
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0002_for_FBO_Post.docx DOCX document
Amendment_0002_SP330013R5002_6-5-13.pdf PDF
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0002_with_accepted_changes.pdf PDF
TE_5_5_Performance_Requirements_Summary_conformed_thru_SP330013R5002_Amendment_0002_for_FBO_Post.doc DOC document
EMSP_11_1_2_UER_Spill_Report_Form_ver_2_for_FBO_post_via_Amendment_0002.docx DOCX document
SP330013R5002_QASP_for_FBO_Post.docx DOCX document
JEMMS_SOW_SP330013R5002_Attachment_2_to_Amendment_0001_Final.docx DOCX document
Amendment_0001_SP330013R5002_5-15-13.pdf PDF
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0001.docx DOCX document
Revised_PPC_Check-In_Location_From_Terrace_Garden_Mihama_to_Gate_5_Camp_Foster.pdf PDF
Revised_PPC_Check-In_Location_From_SeaSide_Hotel_to_Camp_Foster_Gate_5.pdf PDF
Revised_PPC_Check-In_Location_From_Sunny's_Project_Condominiums_to_Camp_Foster_Gate_5.pdf PDF
Revised_PPC_Check-In_Location_From_Hamagawa_Lodge_to_Camp_Foster_Gate_5.pdf PDF
Windshield_Tour_Schedule_for_Site_Visit_SP330013R5002.xlsx XLSX spreadsheet
Revised_PPC_Check-In_Location_From_Beach_Tower_to_Camp_Foster_Gate_5.pdf PDF
Exhibit_A_Attachment_J.2_CDRLs_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.4-_Past_Performance_Questionnaire_SP330013R5002_for_FBO_FINAL.docx DOCX document
Attachment_J.3_TE_5.6_Gas_Cylinders_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_2.1_Definitions_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.5_Performance_Requirements_Summary_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.4_Inventory_DMD_History_BY_CY_SP330013R5002_for_FBO_FINAL.xlsx XLSX spreadsheet
Attachment_J.3_TE_5.2_Mileage_Chart_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_3.2_GFE_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_3.1a_GFF-_Camp_Hansen_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.3b_HW_Pick_Up_Points_and_Schedule_SP330013R5002_for_FBO_FINAL.pdf PDF
JEMMS_RFP_SP330013R5002_for_FBO_Final.docx DOCX document
Attachment_J.3_TE_5.3a_HM_Drop_Points_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.1_Map_of_Okinawa_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_4.1_CFM_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_3.1b_GFF-_Camp_Kinser_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.7_LFORM_Breakdown_SP330013R5002_for_FBO_FINAL.xlsx XLSX spreadsheet
SF33_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.1_SOW_for_FBO_Final.docx DOCX document
Draft_Attachment_J.3_TE_3.2_GFE_SP330013R5002_for_FBO_5-3-13.pdf PDF
Draft_Attachment_J.3_TE_5.4_Inventory_DMD_History_BY_CY_SP330013R5002_for_FBO_5-3-13.xlsx XLSX spreadsheet
Draft_Exhibit_A_Attachment_J.2_CDRLs_SP330013R5002_for_FBO_5-3-13.pdf PDF
Draft_Attachment_J.3_TE_5.5_Performance_Requirements_Summary_SP330013R5002_for_FBO_5-3-13.pdf PDF
DRAFT_RFP_SP330013R5002_for_FBO_5-3-13.docx DOCX document
Draft_Attachment_J.3_TE_3.1b_GFF-_Camp_Kinser_SP330013R5002_for_FBO_5-3-13.pdf PDF
Draft_Attachment_J.3_TE_5.1_Map_of_Okinawa_SP330013R5002_for_FBO_5-3-13.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY

AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY

WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

DLA

Joint Environmental Material Management Services

(JEMMS)

Pre-Proposal Conference

SP3300-13-R-5002

20 May 2013

AGENDA

Administrative
JEMMS Okinawa Overview
Solicitation Review

ADMINISTRATIVE AND INTRODUCTIONS

Administrative
Introductions
Breaks
JEMMS Okinawa Overview
Ms. Tammy Sisai, JEMMS PM
Solicitation Review
Ms. Margaret Ross, Contracting Officer
Ms. Nancye Deem, Acquisition Program Analyst/Project Officer

Ground Rules for Questions

Questions will not be accepted during or upon conclusion of the solicitation overview
Attendees are asked to submit their questions to the Acquisition Specialist
Eric Berns
Questions and Answers will be posted to Federal Business Opportunities (FBO) in an amendment

JEMMS Okinawa Overview

Section A and B Overview

Section A Solicitation, Offer, and Award

Key Points
Ensure the Documents (SF33, SF30, proposal) are signed
The Offeror is reminded that the Government reserves the right to award this effort based on initial proposal, as received, without discussions.

Solicitation Schedule

Solicitation Released 13 May 2013
Questions are due 27 May 2013 by 12:00 PM
Submit to Eric Berns, Acquistion Specialist via email: eric.berns@dla.mil
Date and hour for receipt of offers is 12 June 2013 at 12:00 PM EST
Hard copy offers must be received at the office provided in Section L, Para L-18
Electronic submission (e.g., facsimile, email) not accepted
Offerors shall sign and submit amendments to the solicitation with their proposals
Extension of the closing date for the solicitation is not anticipated

Section B Supplies or Services and Price/Costs

CLIN X001: Firm Fixed Price (FFP) Labor for Site Management IAW C-1.4 of the solicitation
CLIN X002: Cost Plus Fixed Fee (CPFF) Labor to support tasks IAW C-1.4.2 and C-1 through C-7 of the SOW
CLIN X003: Cost Plus Fixed Fee (CPFF) Material and Support Costs for CLINs X001 and X002
CLIN X003AA Hazardous Materials
CLIN X003AB Material Support and Operations Supplies
CLIN X003AC Equipment Rental

Section B Supplies or Services and Price/Costs

CLIN X004: Contract Data Requirements List (CDRL) IAW DD Form 1423 (Note: Contractor shall not price these items separately
A001 – A016
CLIN X005: Travel (Cost Reimbursement – No Fee) – Travel in support of Marine Corps and Navy organizations
CLIN Structure
Firm Fixed Price (FFP)
0001The Contractor shall provide labor for site management in accordance with C-1.4, Statement of Work (SOW) of the solicitation
12MO $___________$___________

Cost Plus Fixed Fee (CPFF)

0002 The Contractor shall provide labor to support the tasks in accordance with Section C-1.4.2 and C-5, Statement of Work (SOW) of the solicitation
Estimated Cost:$___________
Fixed Fee (________%):$___________
Total Estimated Cost Plus Fixed Fee: $___________

Section B Supplies or Services and Price/Costs

CLIN Structure
Cost-Plus-Fixed-Fee (CPFF)
0003 Material and Support Costs for CLINs 0001 and 0002

0003AA Hazardous Materials to support Marine Corps and Navy Organizations

Estimated Cost$ 593,000.00
* Applicable Material Handling Charge (Offeror to identify) ________% $ _________
Fixed Fee (________%):$___________

Total Estimated Cost, Applicable Material Handling Charge, Plus Fixed Fee: $___________

0003AB Material Support and Operations Supplies to support Marine

Corps and Navy Organizations

Estimated Cost$75,000.00
* Applicable Indirect Rate (Offeror to identify) ________%$__________
Fixed Fee (________%)$ __________
Total Estimated Cost, Applicable Indirect Rate, Plus Fixed Fee:$___________
CLIN Structure
Cost-Plus-Fixed-Fee (CPFF) CONT.
0003AC Equipment Rental to support Marine Corps and Navy Organizations
Estimated Cost$ 320,000.00
*Applicable Indirect Rate (Offeror to identify) ________%$ _________
Fixed Fee (________%):$__________

Total Estimated Cost, Applicable Indirect Rate, Plus Fixed Fee: $__________

Not Separately Priced (NSP)
0004 Contract Data Requirements List (CDRL) in accordance with DD

Form 1423. (NOTE: CONTRACTOR SHALL NOT PRICE THESE

ITEMS SEPERATELY) 1 LOT NSP NSP

0005 Travel in support of Marine Corps and Navy Organizations for CLINs 0001 and 0002

Estimated Cost$ 11,500.00
*Applicable Indirect Rate (Offeror to identify) ________%$_________
Not-To-Exceed (NTE)$ __________

Section B Supplies or Services and Price/Costs

Key Points
Periods of Performance
Base Year
11/28/13 – 03/28/14 Phase-in period:
03/29/14 - 11/27/14, Full Performance
Option Year 1 – 11/28/14 – 11/27/15
Option Year 2 – 11/28/15 – 11/27/16
Option Year 3 – 11/28/16 – 11/27/17
Option Year 4 – 11/28/17 – 11/27/18

Section B Supplies or Services and Price/Costs

Key Points
B1 – Indefinite Delivery/Indefinite Quantity (IDIQ)
Task Orders consisting of Firm Fixed Price (FFP), Cost-Plus Fixed Fee (CPFF) and Cost Reimbursement (No Fee) line items
The first task order will be for work for Marine Corps and Navy organizations located in Okinawa, Japan
SOW and Technical Exhibits incorporated with this RFP pertain to the work at this location
IAW C-1.2.1B – 3PL services may be required at other locations within the Pacific RIM
DLA shall issue a RFP to the awardee and requirement shall be captured in a separate task order

Section B Supplies or Services and Price/Costs

Key Points
B1 – Indefinite Delivery/Indefinite Quantity (IDIQ)
To ensure consistent evaluation Offerors are to utilize the Government’s total estimated productive labor hours per year and per labor position as reflected in Section L
B2 – Pricing Instructions
FIRM FIXED PRICE ARRANGEMENT – CLIN X001
Shall be paid firm fixed price per month basis
COST-PLUS-FIXED-FEE (CPFF) – CLIN X002
Costs for labor shall include all direct labor costs.
Costs are reimbursed at actual cost plus applicable indirect costs and a base fixed fee not to exceed 10% of contract’s estimated cost, excluding fee

Section B Supplies or Services and Price/Costs

Key Points
B2 – PRICING INSTRUCTIONS (CON’T)
COST PLUS FIXED FEE (CPFF) PRICING ARRANGEMENT – CLIN X003
Government has provided an estimated cost exclusive of any applicable Material Handling Charge (the applicable Material Handling Charge applies to Subclins X003AA only) or other applicable indirect rate such as G&A, and exclusive of the fixed fee.
FOR SUB-CLINS X003AA – Offerors shall apply ONLY their applicable Material Handling Charge, and fixed fee to the estimated cost to arrive at the Total Estimated Cost, Applicable Material Handling Charge, Plus Fixed Fee amount.
FOR SUB-CLINS X003AB – AC – Offerors shall apply their applicable indirect rate, plus fixed fee to the estimated cost to arrive at the Total Estimated Cost, Applicable Indirect Rate, Plus Fixed Fee amount.
B2 – PRICING INSTRUCTIONS (CON’T)
REPORTING REQUIREMENTS – CLIN X004 (NSP)
NOT SEPARATELY PRICED
Costs associated with this effort will be submitted under either a Labor CLIN or Material Support Costs CLIN
Travel – CLIN X005
Government has provided an estimated cost exclusive of any applicable indirect rate. Offerors shall apply their applicable indirect rate to the estimate cost to arrive at the total estimated cost
B3 – IAW Section C-5.3.1 the Contractor shall not bill for material purchased in support CLIN X003AA until the material has been issued to the Government

Statement of Work Review

Technical Team

DLA J-352 Chemical Management Services (CMS) Program Manager
HQ Marine Corps (Logistics and Environmental)
Marine Corps Environmental Team Okinawa
HQ NAVSUP

DLA Distribution J7 – Acquisition Planning and Contract Administration Support

Scope

Joint Environmental Materials Management Services (JEMMS)
DLA support of Marine Corps and Navy organizations in the Pacific RIM
Okinawa, Japan
Perform HM management services to include 3PL supply chain and inventory management to approximately 380+ work centers
Perform HW management to approximately 420+ Hazardous Waste Accumulation Points island wide
Comply with Pollution Prevention mandates to reduce the amount of HM ordered, stocked, distributed, and disposed.

Scope

Manage the total work effort associated with supply chain and inventory management for all HM, including Point of Sale transactions for 3PL HM
Methodology used to perform these functions is at the discretion of the Offeror so long as it is effective and efficient without increasing cost or risk to mission performance for the customer and IAW all Federal and local laws and regulations
JEMMS Center is currently using R-HICs; however, the Marine Corps expects to transition to the Hazardous Materials Management System (HMMS) before contract award

Scope

Procure/receive 3PL (contractor-owned) HM in support of approved customer
Currently a large amount of DLA forward stocked material in addition to courtesy stowed and Marine Corps owned HM is located in the JEMMS Center
As stocks of Government-Owned HM is reduced through attrition, this material will be replaced with Contractor-owned 3PL HM
TypeDescription
Contractor-Owned 3PL HMOwned by the Contractor performing services under this contract
Other Contractor-Owned HMOwned by a Contractor performing services for the Government under another contract (Government-Owned HM)
Courtesy StowHM temporarily stored on behalf of approved customers (Government-Owned)
DLA Forward Stocked HMGovernment-owned HM stocked by DLA
DMIGovernment-Owned HM owned by specific Marine Corps customers
REUSEServiceable excess HM returned by customers and available for reissue

Scope

Use HMMS for tracking purposes along with Contractor-Furnished Point of Sale system as needed to support full range of HM and HW services
Perform handling, documentation, and transfer of HW to DLA Disposition Service Providers
Deliver and replenish HM lockers for approved customers
Identify and recommend recycling initiatives to reduce pollution waste streams

Statement of Work

Places of performance
Primary – JEMMS Center, Building 500, Camp Kinser
Satellite JEMMS Center, Building 2174, Camp Hansen
Customers located throughout Okinawa
See TE 5.1 Map of Customer Locations
Current Duty Hours
0730 – 1630, Monday through Friday, except Federal holidays

Statement of Work

C-1.4 Key Personnel
Site Manager
Third Party Logistics Project Manager (3PL PM)
Logistics Analyst
Serves as Alternate Site Manager in Site Manager’s absence
C-1.4.2 Labor Categories
Supply Systems Analyst
Supply Technician
Warehouse Specialist (HM/HW)
Truck Driver
Hazardous Waste Supervisor

Statement of Work

C-1.7 Quality Control/Customer Satisfaction Plan
Contractor shall develop a detailed QC/CSP (CDRL A013) which specifically addresses methods for meeting performance standards, customer requirements, and complying with applicable regulations – shall be prevention based
Final QC/CSP is due to the KO NLT 15 days prior to the end of phase-in and is maintained throughout the duration of the contract
Government will implement a Quality Assurance Surveillance Plan (QASP) to monitor contract performance and ensure acceptable performance is achieved

Statement of Work

Phase-In Plan – As a minimum will require completion of tasks identified in C-1.8
Phase-in period will not exceed 120 days
Includes validation of AULs and inventory levels with customers
Establishment of 3PL HM sources of supply and procurement processes
Procurement and delivery of 3PL HM
Plan for conducting inventory of HM and transfer of accountability of Government-Owned HM
Recruitment and hiring of personnel
Staffing plan associated with the completion of phase-in requirements

Statement of Work

The Government will furnish facilities, equipment, IT equipment, data systems, unless otherwise specified.
The Contractor is responsible for the disposal costs of Contractor-Owned 3PL HM processed as HW
Contractor shall make separate payment arrangements with DLA Disposition or a licensed HW Service Provider for disposal
Contractor shall provide the training identified C-4.7
Ensure all personnel receiving this training NLT the start of full performance

Statement of Work

Key Points - JEMMS Center Operations
Use DLA JEMMS methodology and business practices to perform HM and HW Services for DLA supporting Marine Corps and Navy organizations
Standardize and lower the cost of procurement, storage, issue, tracking, and reuse of HM throughout the customer base
Identify HM in the HW streams and divert these materials to REUSE
Comply with Federal and local (Japanese) laws, regulations, and policies regarding HM and HW management
Replenish HM inventory levels at all approved HM locations to meet operational requirements IAW approved AUL quantities

Statement of Work

Key Points - JEMMS Center Operations
Procure all HM through the Federal Supply System (FSS) or commercial sources, whichever is most cost effective
Use Government-contracted or Prime Vendor to procure HM at the lowest cost
Seek competition between their established network of suppliers to procure each item at the best value to the Government
Continuously seek the best possible price on all HM used by DLA customers
Procure sole sourced HM based on justification provided by the customer
Maintain order status and provide to the COR/TPOC (CDRL A008)

Statement of Work

Key Points - JEMMS Center Operations
Establish an efficient and effective electronic system that enables rapid procurement and receipt of 3PL HM products
Maintain a sufficient inventory of HM at each JEMMS Center based on demand criteria and approved AULs
Inventory levels must be sufficient to meet the customer’s RDD and prevent work stoppages
3PL HM product range and depth may be adjusted at any time during contract performance
Maintain minimum levels of never-out products
HM defined as mission critical HM products and quantities that must be available immediately upon demand by the customer

Statement of Work

Key Points - JEMMS Center Operations
Perform locker management for approved customers
Use HMMS for control and tracking of HM and HW
Deliver and pickup HM/HW for on-base and off-base point-of-use customers (TE 5.3a and TE 5.3b)
Provide courtesy storage as approved by the COR/TPOC
Perform shelf-life management
Perform disposal of HM
Perform HW processing
Includes collecting, preparing documentation, and turning over to the DLA Disposition Disposal Service Provider

Statement of Work

Key Points - JEMMS Center Operations
Recycling Program Support
Pick-up of used anti-freeze. Drums are transferred to MCB Environmental Support Team for processing.
Collection of light bulbs for Marine Corps units only
Collection of toner/ink cartridges and redirecting to the manufacturer
Fire extinguisher collection and dismantling
Collection of spent batteries
Identifying and recommending new recycling initiatives

Statement of Work

Key Points - JEMMS Center Operations
Additional Support
Provide HM services to JEMMS customers in support deployments, redeployments, contingencies, and exercises
Managing the Landing Force Operational Reserve Material (L-Form) (TE 5.7 L-Form Breakdown)
Performing stock maintenance on its content when not deployed – stock rotation to maximize shelf-life and minimize material expiration and disposal
Verifying container integrity
Load and unload trucks that transport L-Form to and from ship

Statement of Work

Key Points - JEMMS Center Operations
Contract Data Requirements List (CDRL) located at Section J
Contractor Manpower Reporting (C-6.4.1)
Report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract using the Contractor Manpower Reporting Application at http://www.eCMRA.mil.

Statement of Work

Technical Exhibits
TE 2.1Definitions and Acronyms
TE 3.1a JEMMS Center Camp Hansen
TE 3.1b JEMMS Center Camp Kinser
TE 3.2Government-Furnished Equipment
TE 5.1Map of Customer Locations in Okinawa
TE 5.2Mileage Chart – Distance from JEMMS Center to Customer Locations
TE 5.3aHazardous Materials Drop Points
TE 5.3bHazardous Waste Pick-Up Points and Schedule
TE 5.4Inventory Demand History by Calendar Year
TE 5.5Performance Review Summary
TE 5.6Gas Cylinders
TE 5.7L-FORM Breakdown

Solicitation Overview

Section D Packaging and Marking This requirement includes no special packaging and marking instructions.

Section E Inspection and Acceptance

Key Points
FAR and DFARS clauses for Inspection of Services
E-4 Quality/Performance Evaluation
Government will use a Quality Assurance Surveillance Plan to monitor compliance with the terms and conditions; identify conforming and nonconforming services to determine appropriate action under the Inspection of Services and Termination for Default contract clauses.
QASP will be tailored from the Contractor’s QC/CSP and sets forth the method and manner by which the Government intends to conduct surveillance of work under the contract.
Contractor shall use the Quality Management System (QMS) to acknowledge results, propose corrective and preventive actions and timelines as required by the COR and/or respond to surveillance results.

Section F Deliveries or Performance

Key Points
Services shall be performed as prescribed by the Statement of Work – Section C
F-5 Period of Performance - Base Year with four (4) one (1) year optional full performance periods
F-6 Deductions –All deductions as a failure to meet performance metrics as established in Technical Exhibit 5.5 will be taken from fee only either through unilateral or bi-lateral modification to the contract.

Section G Contract Administration Data

Key Points
G-2, This contract will be paid by DFAS
Invoices shall be submitted IAW instructions in DFARS 252.232.7006 Wide Area Workflow Payment Instructions (JUN 2012)
G-4, Invoicing Instructions
Provides invoice preparation and submission instructions
G-6, Contractor Performance Assessment Reporting System (CPARS) Requirements
Requires the contractor, in performing this contract, to be subject to a past performance assessment in accordance with FAR 42.15 and the CPARS Guide

Section H Special Contract Requirements

Key Points
H-1 - DFARS Clause 252.242-7006 Accounting System Administration
H-2 , DLAD Clause 52.237-9001, Contractor Personnel Changes and Key Personnel Requirements
Requires contractor to notify the KO prior to any contractor personnel changes
Any removals/replacements for contractor’s convenience shall be at no cost to the Government
Key Personnel identified in SOW, Section C-1.4
H-8, Contracts to be Performed in Japan
H-9, SOFA Article XIV Status

Section I Contact Clauses

Key Points
I-39, FAR Clause 52.216-8-Fixed Fee (Applies to CLINs X002, and X003 only)
I-63, FAR Clause 52.232-20-Limitation of Cost
Applicable to CLIN X002, X003 and X005 Only***
I-154, FAR Clause 52.216-22 – Indefinite Quantity (Oct 1995)
I-159, DFARS 252-232-7006 Wide Area WorkFlow Payment Instructions
I-163, DLAD 52.217-9017 Tailored Logistics Support Purchasing Reviews (Nov 2011)

Section J List of Attachments

Attachment J.1 – Section C – SOW
Attachment J.2 – Contract Data Requirements List (A001-A016)
Attachment J.3 Technical Exhibits
Attachment J.4 Past Performance Questionaire

Section K Representations, Certifications, & Other Statements of Offerors

Key Points:
The North American Industry Classification System (NAICS) code for this acquisition is 493110 - General Warehousing and Storage
See FAR 52.219-14
The Small Business Size Standard is $25.5M
Response to provisions shall be provided in proposal Volume I, Section 3

Section L Instructions, Conditions, & Notices to Offerors

Key Points:
L-14, DLAD 52.215-9023 – Reverse Auctions
KO may utilize on-line reverse auctioning as means of conducting price negotiations
L-18, Communications Between the Government and Offerors
Procedure and Deadline for submitting questions
All questions shall be submitted by electronic mail
Questions shall be received NLT 12:00 PM ELT 27 May 2013
Proposal submission and deadline
Only hard copies submitted to the address in paragraph 2 of section L-18 will be accepted
Proposals due NLT 12:00 PM ELT 12 June 2013

Section L Instructions, Conditions, & Notices to Offerors

Key Points:
L-19 PROPOSAL PREPARATION REQUIREMENTS
Important proposal instructions regarding such topics as number of copies required, page size/format, page limitations
All pages of submittals shall include the statement “SOURCE SELECTION SENSITIVE INFORMATION – SEE FAR 2.101 & 3.104”
Resumes must be marked “PERSONALLY IDENTIFIABLE INFORMATION (PII) SAFEGUARD IAW DoD PRIVACY PROGRAM AND PRIVACY ACT OF 1974”
Please use 10 Font in the POAM required for the phase-in plan

Section L Instructions, Conditions & Notices to Offerors (Cont.)

VOLTITLEPAPER COPIESCD'sPAGE LIMITATION
ISolicitation Offer and Award Document (SF-33)Original & 11N/A
Section 1: Cover Letter and Section A (SF-33)
Section 2: Section B
Section 3: Section K (Representation and Certifications
IITechnical ProposalOriginal & 45220
Section 1: Hazardous Materials Management Approach
Sub-Section 1.1: JEMMS Operations Approach
Sub-Section 1.2: Material Management Approach
Sub-Section 1.3: Inventory Management Approach
Sub-Section 1.4: Point of Sales (POS) System
Section 2: Phase-In Approach
Section 3: Management, Staffing, and Organizational Approach
Sub-Section 3.1: Management Approach
Sub-Section 3.2: Staffing and Organizational Approach
* Note that the page limitation for proposal Volume II is 200 pages; however, this is excluding resumes and letters of intent
IIIPast Performance ProposalOriginal & 3340
IVCost ProposalOriginal & 33N/A

Section L Instructions, Conditions, & Notices to Offerors

Volume I
Section 1 – Cover Letter and Completed Standard Form 33
Signed acknowledgements of amendment(s)
Section 2 – Section B
Completed CLIN Price Information in the Schedule of Supplies/Services
Section 3 – Representations and Certifications
Completed Certifications IAW Section K
Accounting System Verification
Contact Information for cognizant DCAA Office

Section L Instructions, Conditions, & Notices to Offerors Volume II Technical Proposal

Technical Proposal

Submit a detailed description of the approach for each section and sub-section
Please follow the format of Section L and tab each section and sub-section
Describe “how” the requirements will be accomplished
Please refrain from describing how you perform on other contracts – this should be addressed in the Volume III Past Performance Proposal
Please refrain from reiterating the SOW – shall be your method and plans for accomplishing all requirements
May use flow charts but shall provide a detailed narrative to explain the processes and procedures addressed in the flowcharts

Instructions, Conditions & Notices to Offerors (Cont.)

Section L Instructions, Conditions, & Notices to Offerors

Section 1 – Hazardous Materials Management Approach
Sub-section 1.1 JEMMS Operations Approach
Describe in detail the processes and procedures that will be implemented to procure, receive, store, issue, dispense, and transport HM to customers, manage lockers for approved customers, and the disposal of HW in compliance with Federal and local statutes and regulations

Section L Instructions, Conditions, & Notices to Offerors

Sub-section 1.2 Material Management Approach
Describe in detail the approach that will be implemented to supply chain management, receipt, storage, and issue of HM.
Each performance requirement shall be discussed at the level of detail that is sufficient for the Government to ascertain the Offeror’s ability to perform the required tasks.
Describe the procedures and techniques that will be used to forecast quantities and types of HM needed to support customers
Describe the methods to be used in the acquisition of HM in the fulfillment of all customer HM requirements
Describe they have an approved purchasing system and that materials shall be acquired IAW the Contractor’s approved purchasing system to ensure fair and reasonable pricing of material IAW DLAD 52.217-9017 Tailored Logistics Support Purchasing Reviews
Provide a Material Management Flow Diagram with decision point descriptions starting with inventory reorder points and end with customer order fulfillment

Section L Instructions, Conditions, & Notices to Offerors

Sub-section 1.3 Inventory Management Approach
Provide a comprehensive Inventory Management Approach that will be followed during contract performance to provide 100 percent fill rate of all customer HM requirements by determining and maintaining demand based inventory levels as established by the Government. As a minimum:
Include a description of how the organization will provide the required inventory on day one of full contract performance.
Procedures for replenishment of demand based items to avoid an NIS situation
Discussion on Offeror’s network of manufacturer’s/suppliers and method of estimating delivery dates
Ability to rapidly satisfy surge, sole source, and long lead time HM requirements

Section L Instructions, Conditions, & Notices to Offerors

Sub-section 1.4 Point of Sales (POS) System
Provide a comprehensive description of the POS System and its functionality. As a minimum describe the capability:
Process transactions
Generate transaction reports
Prepare and provide receipts with all of the information required in the SOW
Prepare invoices (DD Form 250)
Interface with Government Inventory Management systems to monitor and maintain inventory levels to eliminate stock outages
Record each sale, decrement inventory, and record stock
Maintain vendor and customer data

Section L Instructions, Conditions, & Notices to Offerors

Section 2 Phase-In Approach
Describe the approach that sets forth actions, plans, procedures, and timelines necessary to ensure a smooth phase-in
Provide a detailed Plan of Action and Milestones (POAM) using Microsoft Office Project or equivalent that addresses as a minimum the tasks identified in C-1.8 Phase-In of the SOW
Describe the approach that will used to provide all personnel the required training in SOW C-4.7 Contractor-Furnished Training NLT the start of full performance

Section L Instructions, Conditions, & Notices to Offerors

Section 3 Management, Staffing, and Organizational Approach
Sub-Section 3.1 Management Approach
Describe the organizational structure as it pertains to performing this effort
The organizational structure as it pertains to performing this effort
The corporate approach to performing this effort
The management structure for performing the requirements
Describe the proposal organizational structure by function
Organizational charts and a detailed narrative must clearly delineate how the full contractual effort will be accomplished
Charts and narrative shall address the responsibilities, lines of authority, and communication and reporting structure
If using a subcontractor provide a clear definition of the proposed lines of authority and communication and coordination with the Offeror’s organization

Section L Instructions, Conditions, & Notices to Offerors

Section 3 Management, Staffing, and Organizational Approach
Sub-Section 3.1 Management Approach
Describe the method for hiring Key Personnel and provide resumes
For the purposes of this solicitation Key Personnel are:
Site Manager
Logistics Analyst
3PL Program Manager
Resumes must demonstrate that candidates meet all experience and qualification requirements in C-1.3 Key Personnel

Section L Instructions, Conditions, & Notices to Offerors

Sub-Section 3.2 Staffing and Organizational Approach
Provide a comprehensive staffing approach that will be followed throughout the duration of the contract
Include a matrix of appropriate workforce to include labor categories that will be assigned to fulfill the SOW requirements to include management and supervisory expertise
If proposing different labor categories than those identified in the SOW provide a detailed rationale for proposing differently than the Government

Section L Instructions, Conditions, & Notices to Offerors Volume III Past Performance Proposal

Section L Instructions, Conditions, & Notices to Offerors

Volume III – Past Performance Proposal
Limited to 40 pages
The data must be relevant. This is defined as those “similar in terms of scope, complexity and magnitude of effort. Additionally, the performance must have occurred during the last five (5) years.” If an Offeror has no relevant experience, this must be stated.
Data must be provided for Offeror and any major subcontractors. This is defined as “those providing twenty percent (20%) of total dollar threshold AND/OR twenty-five percent (25%) of total man-hour effort”. Only major subcontractors information will be evaluated.

Section L Instructions, Conditions, & Notices to Offerors Volume IV Cost Proposal

Section L Instructions, Conditions, & Notices to Offerors Volume IV – Cost Proposal

Key Points:
Submit all required tables in MS EXCEL. Do not hide formulas or cells on CD. The Government must be able to replicate the calculations
Cost Proposal Summary is required
Cost Breakdown is required for ALL CLINs
Detailed cost information is required for all “Major Subcontractors”. This is defined as “those providing 20% of total dollar threshold AND/OR 25% of total man-hour effort”. Only major subcontractor information will be evaluated.
If a subcontractor elects to submit the detailed breakdown for their labor costs directly to the Government, the prime Offeror must still complete portions of the Subcontracting Labor Tables. This will ensure that the Offeror’s proposal contains an accurate Price.

Section L Instructions, Conditions, & Notices to Offerors Volume IV – Cost Proposal Cost Proposal Summary Table

ITEMBASE
YEAROPTION
YEAR 1OPTION
YEAR 2OPTION
YEAR 3OPTION
YEAR 4TOTAL CONTRACT
CLINs X001 Site Management/Environmental Compliance/Labor (FFP) Key Personnel Labor Only

CLINs X002 Hazardous Materials Management Services Support/ Labor (CPFF) Non-Key Personnel Only CLINs X003 Material and Support Costs for CLINs X001 and X002 (CPFF)

Total Estimated Cost $ $ $ $ $ $

Section L Instructions, Conditions, & Notices to Offerors Volume IV – Cost Proposal CLINs X001 Site Management

Table is condensed for purposes of this presentation

SEPARATE TABLE REQUIRED FOR BASE AND EACH OPTION PERIOD

CLIN 0001 – PRIME LABOR
Labor CategoryDOL CodeEstimated Number of HoursBase RateSubtotal Labor

(Number of Hours * Base Rate)

Site Manager1440
3PL Program Manager960
Logistics Analyst1440
Subtotal Labor for all Categories:$
OH (1)________%$
OH (2)________%$
G&A________%$
Profit/Fee________%$
Total Labor$

Section L Instructions, Conditions, & Notices to Offerors

CLINs X001 Site Management

SEPARATE TABLE REQUIRED FOR EACH CLIN FOR EACH YEAR

CLIN X001 – Identify Contract Year

SUBCONTRACTOR LABOR

Labor Category Number of Hours Base Rate Subtotal Labor (Number of Hours * Base Rate)

Position 1
Position 2
Position 3
Subtotal Major Subcontractor Labor for all Categories:$
OH (1)________%$
OH (2)________%$
G&A________%$
Profit/Fee*________%$
Total Major Subcontactor Labor$
Other Subcontracted Labor Subtotal:$
Total Cost for all Subcontractor Labor$
Prime OH or G&A ____%$
Total Subcontractor Labor$

Section L Instructions, Conditions, & Notices to Offerors Volume IV – Cost Proposal CLINs X001 Site Management

CLIN X001 – SUPPORT COSTS
COSTOH(1)___%OH(2)_____%SUBTOTALPROFIT__%TOTAL

TOTAL SUPPORT COSTS

Offerors to complete table for X001, X004, and X007. Offerors are not limited to the number of rows in the table above. Offerors shall use as many rows as appropriate to capture the requested data.

Section L Instructions, Conditions, & Notices to Offerors

CLINs X001 Summary

Offerors to complete a table for X001.

SUMMARY TABLE CLIN X001BASE
YEAROPTION
YEAR 1OPTION
YEAR 2OPTION
YEAR 3OPTION
YEAR 4TOTAL CONTRACT
CLIN X001 – PRIME LABOR COSTS
CLIN X001 – SUB LABOR COSTS
CLIN X001 – SUPPORT COSTS
CLIN X001 – TOTAL FIRM FIXED PRICE

Section L Instructions, Conditions, & Notices to Offerors

CLINs X002 Hazardous Materials Management Services Labor Support in accordance with Section C-1.4.2 and C-5, Statement of Work (SOW)

CLIN 0002 – PRIME LABOR
Labor CategoryDOL CodeEstimated Number of HoursBase RateSubtotal Labor

(Number of Hours * Base Rate)

Supply Systems Analyst1440
Supply Technician1360
Warehouse Specialist (HM/HW)13600
Truck Driver4080
Hazardous Waste (HW) Supervisor1440
Subtotal Labor for all Categories:$
OH (1)________%$
OH (2)________%$
G&A________%$
Profit/Fee________%$
Total Labor$

Offeror to complete a table for each clin for the base period and for each option period.

Volume IV – Cost Proposal CLINs X002 Hazardous Materials Management Services Labor Support in accordance with Section C-1.4.2 and C-5, Statement of Work (SOW)

Section L Instructions, Conditions, & Notices to Offerors CLIN X002 – Identify Contract Year

SUBCONTRACTOR LABOR

Labor Category DOL Code Number of Hours Base Rate Subtotal Labor (Number of Hours * Base Rate)

Position 1
Position 2
Position 3
Subtotal Major Subcontractor Labor for all Categories:$
OH (1)________%$
OH (2)________%$
G&A________%$
Profit/Fee*________%$
Total Major Subcontactor Labor$
Other Subcontracted Labor Subtotal:$
Total Cost for all Subcontractor Labor$
Prime OH or G&A ____%$
Total Subcontractor Labor$

* PROFIT/FEE – Subcontractor shall enter their profit if their contract with the Offeror is a fixed price arrangement. Subcontractor shall enter their fee if their contract with the Offeror is a cost type arrangement.

The prime shall only enter the fee for subcontractors if the rate utilized is different than the target fee rate for all other labor proposed. If it is the same fee rate proposed for the prime labor, it shall be added to the summary table below.

NOTE: Offerors are not limited to the number of rows in the table above. Offerors shall use as many rows as appropriate to capture the requested data.

Offeror to complete a table for X002, X005, and X008

Section L Instructions, Conditions, & Notices to Offerors Volume IV – Cost Proposal CLINs X002 Hazardous Materials Management Services Labor Support in accordance with Section C-1.4.2 and C-5, Statement of Work (SOW)

SUMMARY TABLE CLIN X002BASE
YEAROPTION
YEAR 1OPTION
YEAR 2OPTION
YEAR 3OPTION
YEAR 4TOTAL CONTRACT
CLIN X002 – PRIME LABOR COSTS
CLIN X002 – SUB LABOR COSTS
CLIN X002 – ESTIMATED COST
CLIN X002 – FIXED FEE (____% OF ESTIMATED COST)
CLIN X002 – TOTAL ESTIMATED COST PLUS FIXED FEE

Offerors are to complete one summary table each for CLINs X002

Volume IV Cost Proposal

CLINs X003 Hazardous Material/Material Support Costs/Equipment Rental
Offerors shall complete the dollar amount of the information requested by the header row in the applicable tables . Offerors shall identify the specific rate applied to the Estimated Cost (applicable indirect rate; offeror to identify). Offerors shall also insert the proposed indirect rate(s) percentage into the header row. Offerors shall sum the Government provided Estimated Cost and their applicable indirect rate(s), along with their proposed fixed fee to arrive at the Total Estimated Cost inclusive of applicable Material Handling Charge/Indirect Rate and Fixed Fee in the last column.
(See applicable table in Section L of the RFP for the estimated cost per Sub-CLIN).

Instructions, Conditions, & Notices to Offerors

Key Points:

Best Value Trade-Off
Proposals will be given a combined merit and risk rating
The Government will evaluate proposals based on the following factors (listed in descending order of importance):
Factor 1: Hazardous Materials Management Approach
Subfactor (a): JEMMS Operations Approach
Subfactor (b): Material Management Approach
Subfactor (c): Inventory Management Approach
Subfactor (d): Point of Sales (POS) System
The subfactors are equal in importance
Factor 2: Phase-In Approach

Section M Evaluation Factors for Award

Key Points:

Factor 3: Management, Staffing, and Organizational Approach
Sub-factor (a): Management Approach
Sub-factor (b): Staffing and Organizational Approach
Subfactors are listed in descending order of importance
Factor 4: Performance Confidence Assessment
Cost Evaluation:
The Government will assess the realism of the Offeror’s pricing to determine the most probable cost the Government would expect to pay for performance of the contract. This assessment will determine if the Offeror’s pricing is: 1) reasonable 2) realistic for the work to be performed 3) reflects a clear understanding of the requirements; and 4) is consistent with the various elements of the Offeror’s technical approach.
The Government will perform the realism analysis on all CLINs. The Government will arrive at a Total Evaluated Contract cost by adding the Offeror’s proposed FFP pricing for CLINs X001, to the most probable cost amounts from the evaluation of CLINs X002, X003, and X005 for the basic and option years.

Conclusion

Technical Proposal Tips
Be sure to read entire solicitation
Technical Approach must address “how” you propose to perform the requirements
Shall not be a reiteration of the requirements in the SOW
The technical proposal should not be a description of how you perform on current contracts or have performed on past contracts
Address this in your Past Performance Proposal
Be sure to read Section L
Address all requirements with detailed descriptions
Provide sufficient analysis and details to support the approaches
Ensure the labor categories identified in the technical proposal match the cost proposal

Conclusion

Keep the questions relevant to the issues in the solicitation
Reading and understanding the solicitation reduces questions
Monitor FBO for Amendments issued against the solicitation
Don’t expect extensions from the due date and time
Make the initial proposal your best offer as the Government intends to award without discussions
Communicate through the proper channels (Contracting Officer and Acquisition Specialist)

Please Work With us

What’s Next

Registration for site visit at the Garrison Mobile Equipment (GME)-Camp Foster May 21st at 7:30 am
Bus departs NLT 8:05 am
You must ride the bus to participate in the tour
Cell phones, cell phones with digital cameras, and cameras of any kind are strictly prohibited
Comfortable walking shoes are recommended
See site visit agenda for further details
Tour the JEMMS Operations
Will return to the GME at approximately 6:00 pm

DEFENSE LOGISTICS AGENCY

AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY

WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

File details come from the government source that posted it. Updated .