EMSP_11_2_Spill_Response_and_Notification_Procedures_(EN)__ver_5_for_FBO_Post_via_Amendment_0002.pdf

PDF 27 KB Posted

Attached to
Hazardous Materials Management (3PL) Services in support of the Marine Corps and Navy organizations located in Okinawa, Japan
Solicitation number
SP3300-13-R-5002
Issued by

About this file

EMSP 11.2 Spill Response and Notification Procedures SP3300-13-R-5002 Amendment 0002

View the file

Other files

File Type Posted
SF33_SP330013R5002_Amendment_0003.pdf PDF
Amendment_0003_SP330013R5002_6-11-13.pdf PDF
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0003_for_FBO_Post.docx DOCX document
Attachment_2_Questions_and_Answers_SP330013R5002_Amendment_0003_for_FBO_Post.docx DOCX document
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0003_with_accepted_changes.pdf PDF
TE_5_6_GF_Gas_Cylinders_conformed_thru_SP330013R5002_Amendment_0002_for_FBO_Post.pdf PDF
JEMMS_SOW_SP330013R5002_Attachment_2_to_Amendment_0002_for_FBO_Post.docx DOCX document
Marine_Corps_Order_MCSN's_and_NSN's_for_FBO_Post_via_Amendment_0002.pdf PDF
Attachment_3_Questions_and_Answers_SP330013R5002_Amendment_0002_for_FBO_Post.docx DOCX document
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0002_for_FBO_Post.docx DOCX document
Amendment_0002_SP330013R5002_6-5-13.pdf PDF
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0002_with_accepted_changes.pdf PDF
TE_5_5_Performance_Requirements_Summary_conformed_thru_SP330013R5002_Amendment_0002_for_FBO_Post.doc DOC document
EMSP_11_1_2_UER_Spill_Report_Form_ver_2_for_FBO_post_via_Amendment_0002.docx DOCX document
SP330013R5002_PPC_slides_for_FBO_Post_.ppt PPT presentation
SP330013R5002_QASP_for_FBO_Post.docx DOCX document
JEMMS_SOW_SP330013R5002_Attachment_2_to_Amendment_0001_Final.docx DOCX document
Amendment_0001_SP330013R5002_5-15-13.pdf PDF
JEMMS_RFP_SP330013R5002_Attachment_1_to_Amendment_0001.docx DOCX document
Revised_PPC_Check-In_Location_From_Terrace_Garden_Mihama_to_Gate_5_Camp_Foster.pdf PDF
Revised_PPC_Check-In_Location_From_SeaSide_Hotel_to_Camp_Foster_Gate_5.pdf PDF
Revised_PPC_Check-In_Location_From_Sunny's_Project_Condominiums_to_Camp_Foster_Gate_5.pdf PDF
Revised_PPC_Check-In_Location_From_Hamagawa_Lodge_to_Camp_Foster_Gate_5.pdf PDF
Windshield_Tour_Schedule_for_Site_Visit_SP330013R5002.xlsx XLSX spreadsheet
Revised_PPC_Check-In_Location_From_Beach_Tower_to_Camp_Foster_Gate_5.pdf PDF
Exhibit_A_Attachment_J.2_CDRLs_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.4-_Past_Performance_Questionnaire_SP330013R5002_for_FBO_FINAL.docx DOCX document
Attachment_J.3_TE_5.6_Gas_Cylinders_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_2.1_Definitions_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.5_Performance_Requirements_Summary_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.4_Inventory_DMD_History_BY_CY_SP330013R5002_for_FBO_FINAL.xlsx XLSX spreadsheet
Attachment_J.3_TE_5.2_Mileage_Chart_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_3.2_GFE_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_3.1a_GFF-_Camp_Hansen_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.3b_HW_Pick_Up_Points_and_Schedule_SP330013R5002_for_FBO_FINAL.pdf PDF
JEMMS_RFP_SP330013R5002_for_FBO_Final.docx DOCX document
Attachment_J.3_TE_5.3a_HM_Drop_Points_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.1_Map_of_Okinawa_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_4.1_CFM_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_3.1b_GFF-_Camp_Kinser_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.3_TE_5.7_LFORM_Breakdown_SP330013R5002_for_FBO_FINAL.xlsx XLSX spreadsheet
SF33_SP330013R5002_for_FBO_FINAL.pdf PDF
Attachment_J.1_SOW_for_FBO_Final.docx DOCX document
Draft_Attachment_J.3_TE_3.2_GFE_SP330013R5002_for_FBO_5-3-13.pdf PDF
Draft_Attachment_J.3_TE_5.4_Inventory_DMD_History_BY_CY_SP330013R5002_for_FBO_5-3-13.xlsx XLSX spreadsheet
Draft_Exhibit_A_Attachment_J.2_CDRLs_SP330013R5002_for_FBO_5-3-13.pdf PDF
Draft_Attachment_J.3_TE_5.5_Performance_Requirements_Summary_SP330013R5002_for_FBO_5-3-13.pdf PDF
DRAFT_RFP_SP330013R5002_for_FBO_5-3-13.docx DOCX document
Draft_Attachment_J.3_TE_3.1b_GFF-_Camp_Kinser_SP330013R5002_for_FBO_5-3-13.pdf PDF
Draft_Attachment_J.3_TE_5.1_Map_of_Okinawa_SP330013R5002_for_FBO_5-3-13.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPILL RESPONSE & NOTIFICATION PROCEDURES

EMSP 11.2 ver 5 Aug 2012 for PETROLEUM, OIL & LUBRICANTS (POLs) AND HAZARDOUS SUBSTANCES (HS) Spills

Stop the spill. Wear PPE. Apply spill supplies.

Block drains. Prevent runoff to soil/streams.

Control the spill. Neutralize corrosive spills.

Absorb POL spills with pads and dry sweep.

Evacuate yourself and others from the spill location. Alert others to stay away.

(Go upwind if possible.).

YES

Then call your Unit Supervisor Phone: ___________________ 24hr: __________________ and Unit Environmental Rep (UER) Phone: ____________________ 24hr: __________________

If necessary call Unit Dispatcher for Vehicle Recovery: 24hr Phone: __________________________

Follow instructions of emergency personnel.

Do not go back into the area unless emergency response personnel state that it is safe to do so.

Assist with clean-up as requested.

IMMEDIATELY CALL: 911 or from off-base / cell 098-911-1911 (Fire Dept Spill Response)

For: uncontrolled, dangerous, or unknown substance spills, spill in drains, or all off-base spills

Provide: a. Your name, phone number and location of spill

b. Type of chemical spilled and Time spill occurred

c. Any critical issues: accident event, persons injured/missing

d. Status of site: Fire? Local Police on-scene? Reporters taking photos? etc

Secure the area. Set-up safety triangles.

Control traffic. Keep people away from area.

N O T I F I C A T I O N

Clear roadway - move vehicles & equipment.

UER ACTION: Notify Unit OOD. Complete and submit EMSP 11.1.2 UER Spill Report Form to Environmental Affairs Branch personnel immediately during normal duty hours or at the start of the next normal duty day for after-hours events.

After-Action - provide/update spill event information to the UER.

Take Action: Can the spill be stopped, contained, and cleaned-up without danger to health & safety?

NO

After-Action - provide/update spill event information to the UER.

Clean-up the waste. Place contaminated materials, absorbents or neutralized material into double plastic bags or other containers.

Dispose of waste at the unit Hazardous Waste Accumulation Point (HWAP).

• Secure the area.

• Safety 1st - keep others away from the spill.

• Control vehicle and pedestrian traffic.

• Do not walk into or touch spilled Hazmat.

• Avoid inhaling gas, fumes, aerosols, vapors.

NO
YES

File details come from the government source that posted it. Updated .