SOW Attachment 7.9 - Low embodied carbon concrete-Sept 22.pdf

PDF 66 KB Posted

Attached to
R10 South Multiple Award Task Order Contract MATOC Replacement Federal contract opportunity
Solicitation number
47PL0123R0014
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This document outlines standards for low embodied carbon concrete on General Services Administration projects. It requires concrete mix designs to have a Type III environmental product declaration and meet global warming potential limits based on compressive strength and mix type. Exemptions may be requested with evidence that compliance is infeasible and strategies to reduce global warming potential to the extent possible. The related federal contract opportunity is a multiple award task order contract replacement for the GSA Public Buildings Service Region 10 to provide construction services where these low embodied carbon concrete standards would apply.

View the file

Other files for this federal contract opportunity

Other files attached to R10 South Multiple Award Task Order Contract MATOC Replacement, newest first.
File Type Posted
Amendment 0003.pdf PDF
A. Attachment D Seed Project SOW dated 10-20-2023.pdf PDF
D. Pre-Propsal Site Visit Roster 09-28-2023.pdf PDF
B. SOW Attachment 7.10 Drawings - Site Plan 10.20.2023.pdf PDF
C. Pre-Proposal Questions and Answers 1 through 17.pdf PDF
Amendment 0002.pdf PDF
Attachment C - TORFP Seed Project - Rev 1.pdf PDF
Amendment 0001.pdf PDF
GSA527-21.pdf PDF
RFP SOUTH MATOC 47PL0123R0014.pdf PDF
South MATOC Agreement.pdf PDF
SOW Attachment 7.11 - Trench Drain.pdf PDF
SOW Attachment 7.5 - C D Waste Mgmt Plan Reporting Template.xlsx XLSX spreadsheet
SOW Attachment 7.8 - Environmentally Preferable Asphalt-Sept 22.pdf PDF
SOW Attachment 7.6 - Sample ROCAL.xlsx XLSX spreadsheet
SF1442 47PL0123R0055 Seed Project.pdf PDF
Attachment F SEED Project Wage Deterimination - WA202330001 09-01-2023.pdf PDF
Exhibit 1 3490.3 Policy.pdf PDF
Exhibit 4 Sample Key Personnel Resume Form.docx DOCX document
Exhibit 3 Project Experience Form.docx DOCX document
SOW Attachment 7.1 - Vendor Security Training 6 2021.pptx PPTX presentation
SF1442 47PL0123R0014 SMATOC.pdf PDF
South MATOC SOW 11222022.pdf PDF
Attachment D Seed Project SOW dated 07-25-2023.pdf PDF
Attachment A South MATOC Terms and Conditions.pdf PDF
Attachment B Example of TO Reps and Certs March 2023.pdf PDF
Exhibit 6 GSA Security Manual.pdf PDF
Exhibit 2 GSA Affiliated Customer Accounts.pdf PDF
SOW Attachment 7.4 - P120 - Cost and Schedule Management Policy and Requirements.pdf PDF
SOW Attachment 7.7 - CIW FORM 850.docx DOCX document
Exhibit 7 IDIQ Price Schedule.xlsx XLSX spreadsheet
Attachment E Seed Project Price and Services Schedule.xlsx XLSX spreadsheet
Attachment C - TORFP Seed Project.pdf PDF
Exhibit 5 Past Performance Questionnaire.docx DOCX document
SOW Attachment 7.10 - Drawings - Site Plan.pdf PDF
SOW Attachment 7.2 - Submittal Transmittal Form.xlsx XLSX spreadsheet
SOW Attachment 7.3 - Project Management Information System.docx DOCX document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Low Embodied Carbon Concrete Standards for all GSA Projects Revised September 2022

1. The [prime contractor] shall provide a product-specific cradle-to-gate Type III environmental product declaration (EPD) for each concrete mix design specified in the contract and used at the project, using NSF International’s product category rule for concrete. Please send EPD(s) with each concrete mix batch design (including type [e.g. standard or lightweight mix] and volume) to embodiedcarbon@gsa.gov, and upload the submittals into GSA’s project management information system.

2. The [prime contractor] shall provide low embodied carbon concrete that meets the global warming potential (GWP) limits of the table below, for concrete of the mix type and strength class.

Maximum Global Warming Potential Limits for GSA Low Embodied Carbon Concrete

(kilograms of carbon dioxide equivalent per cubic meter - CO2e kg/m3)

Specified compressive strength (f'c in PSI) Standard Mix High Early Strength Lightweight up to 2499 242 314 462

2500-3499 306 398 462

3500-4499 346 450 501

4500-5499 385 500 540

5500-6499 404 526 N/A

6500 and up 414 524 N/A

These numbers reflect a 20% reduction from GWP (CO2e) limits in proposed code language:

“Lifecycle GHG Impacts in Building Codes” by the New Buildings Institute, January 2022.

3. These requirements apply to all GSA projects that use at least ten (10) cubic yards of a concrete mix.

4. If it is not feasible to meet GSA’s EPD requirement or GWP limits, the [prime contractor] shall ask the GSA project manager to request a P100 waiver.

a. The [prime contractor] shall outline and provide evidence of the specific circumstances that make compliance infeasible. For example, the only concrete suppliers within the maximum transport range for the mix design:

i. are small businesses that have not yet invested in EPDs; or

ii. do not yet offer mixes that meet GSA’s GWP limits, e.g. because lower-carbon materials are unavailable, or do not meet specific client-driven performance requirements.

b. Any requests for waivers from the GWP limits must include the strategies, if any, that will be used to reduce GWP to the extent feasible. Such strategies include, but are not limited to, the use of alternative cements, supplementary cementitious materials, or alternative aggregates.

c. Any requests for a waiver from the EPD requirement must include a GWP estimate generated with a tool such as the Federal Highway Administration’s LCA Pave Tool, Athena Pavement LCA, Athena Impact Estimator for Buildings, or ZGF’s LCA Calculator.

d. GSA will respond to each complete P100 waiver request with a decision or a request for more detail within ten (10) business days. A complete waiver request is deemed granted if no response is provided within that time.

https://d2evkimvhatqav.cloudfront.net/documents/pcr_concrete.pdf?mtime=20210903125351&focal=none mailto:embodiedcarbon@gsa.gov https://newbuildings.org/resource/lifecycle-ghg-impacts-in-codes/ https://insite.gsa.gov/organizations/public-buildings-service/design-and-construction/pbs-p100-program/p100-waiver https://www.fhwa.dot.gov/pavement/lcatool/ http://www.athenasmi.org/our-software-data/pavement-lca/ http://www.athenasmi.org/our-software-data/impact-estimator/ https://www.zgf.com/ideas/2493-lca-calculator-reduces-concrete-s-embodied-carbon

File details come from the government source that posted it. Updated .