Exhibit 4 Sample Key Personnel Resume Form.docx

DOCX document 20 KB Posted

Attached to
R10 South Multiple Award Task Order Contract MATOC Replacement Federal contract opportunity
Solicitation number
47PL0123R0014
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This document provides a sample resume format for key personnel on federal contracts. It includes fields for the individual's name, current position and title, proposed assignment and duties on the project, years of experience in the assigned position and with the firm, education history, registration information if applicable, relevant experience qualifications, and up to three examples of relevant project experience including title, location, value, size, delivery method, position held, and duties performed. The related federal contract opportunity is a solicitation from the General Services Administration Public Buildings Service Region 10 for a Multiple Award Task Order Contract to replace an existing South MATOC IDIQ.

View the file

Other files for this federal contract opportunity

Other files attached to R10 South Multiple Award Task Order Contract MATOC Replacement, newest first.
File Type Posted
Amendment 0003.pdf PDF
B. SOW Attachment 7.10 Drawings - Site Plan 10.20.2023.pdf PDF
C. Pre-Proposal Questions and Answers 1 through 17.pdf PDF
A. Attachment D Seed Project SOW dated 10-20-2023.pdf PDF
Amendment 0002.pdf PDF
D. Pre-Propsal Site Visit Roster 09-28-2023.pdf PDF
Attachment C - TORFP Seed Project - Rev 1.pdf PDF
Amendment 0001.pdf PDF
SF1442 47PL0123R0014 SMATOC.pdf PDF
South MATOC SOW 11222022.pdf PDF
Attachment D Seed Project SOW dated 07-25-2023.pdf PDF
Attachment A South MATOC Terms and Conditions.pdf PDF
Attachment B Example of TO Reps and Certs March 2023.pdf PDF
Exhibit 6 GSA Security Manual.pdf PDF
Exhibit 2 GSA Affiliated Customer Accounts.pdf PDF
SOW Attachment 7.4 - P120 - Cost and Schedule Management Policy and Requirements.pdf PDF
SOW Attachment 7.7 - CIW FORM 850.docx DOCX document
Exhibit 7 IDIQ Price Schedule.xlsx XLSX spreadsheet
GSA527-21.pdf PDF
RFP SOUTH MATOC 47PL0123R0014.pdf PDF
South MATOC Agreement.pdf PDF
SOW Attachment 7.11 - Trench Drain.pdf PDF
SOW Attachment 7.5 - C D Waste Mgmt Plan Reporting Template.xlsx XLSX spreadsheet
SOW Attachment 7.9 - Low embodied carbon concrete-Sept 22.pdf PDF
SOW Attachment 7.8 - Environmentally Preferable Asphalt-Sept 22.pdf PDF
SOW Attachment 7.6 - Sample ROCAL.xlsx XLSX spreadsheet
Attachment E Seed Project Price and Services Schedule.xlsx XLSX spreadsheet
Attachment C - TORFP Seed Project.pdf PDF
Exhibit 5 Past Performance Questionnaire.docx DOCX document
SOW Attachment 7.10 - Drawings - Site Plan.pdf PDF
SOW Attachment 7.2 - Submittal Transmittal Form.xlsx XLSX spreadsheet
SOW Attachment 7.3 - Project Management Information System.docx DOCX document
SF1442 47PL0123R0055 Seed Project.pdf PDF
Attachment F SEED Project Wage Deterimination - WA202330001 09-01-2023.pdf PDF
Exhibit 1 3490.3 Policy.pdf PDF
Exhibit 3 Project Experience Form.docx DOCX document
SOW Attachment 7.1 - Vendor Security Training 6 2021.pptx PPTX presentation
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEY PERSONNEL RESUME FORMAT

Provide information, listed below, on separate sheets showing qualifications of each key personnel individual. NOTE: Resumes shall only be provided for positions identified on the list of key personnel identified in the Solicitation.

(a) Name:

(b) Current Position/Title:

(c) Proposed Assignment on this Project, including specific duties proposed to be performed on this Project while in this proposed role: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(d) No. of Years in Same Assignment as Proposed on the Project__________________________

(e) Name of Your Firm___________________________________________________________

(f) No. of Years: With this Firm__________ With other Firms____________

(g) Education:

Degree(s) earned: _______________________________________________________________ School attended: ________________________________________________________________ Year Degree granted: ____________________________________________________________ Degree field/specialization: ________________________________________________________ Specialized Training: ____________________________________________________________

(h) Active Registration, if any:

Type: _______ No.____________, State(s) __________, First Year/ Current Year ______/_____

(i) Describe Your Specific Experience and Qualifications Relevant to this Project: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(j) Up to three (3) relevant project examples:

Project Title: ___________________________________________________________________ Project Location: ________________________________________________________________ Project Dollar Value:_____________________________________________________________ Project Size (SF): _______________________________________________________________ Delivery Method (i.e. D/B, DBB, CMc, etc.): _________________________________________ Position Held: __________________________________________________________________ Duties performed: _______________________________________________________________ Company employed with during Project: _____________________________________________

Region South MATOC IDIQ

File details come from the government source that posted it. Updated .