SOW Attachment 7.5 - C D Waste Mgmt Plan Reporting Template.xlsx

XLSX spreadsheet 334 KB Posted

Attached to
R10 South Multiple Award Task Order Contract MATOC Replacement Federal contract opportunity
Solicitation number
47PL0123R0014
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This file contains templates and guidance for waste management reporting on federal construction projects. The templates provide a standardized format for contractors to report estimated and actual construction and demolition (C&D) waste diversion plans and results for a given project. They include sections for contractors to report on the diversion methods, haulers, weights, and diversion rates achieved for various C&D materials like asphalt, brick, drywall, metals, and wood. Contractors must submit waste diversion reports using these templates at project closeout along with certifying the accuracy of the reported weights and diversion rates. Additional details provide guidance on how to estimate weights if materials are reported by volume, as well as notes on retaining supporting documentation and reporting total diverted and landfilled tons in the agency project tracking system.

View the file

Other files for this federal contract opportunity

Other files attached to R10 South Multiple Award Task Order Contract MATOC Replacement, newest first.
File Type Posted
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
A. Attachment D Seed Project SOW dated 10-20-2023.pdf PDF
B. SOW Attachment 7.10 Drawings - Site Plan 10.20.2023.pdf PDF
C. Pre-Proposal Questions and Answers 1 through 17.pdf PDF
D. Pre-Propsal Site Visit Roster 09-28-2023.pdf PDF
Attachment C - TORFP Seed Project - Rev 1.pdf PDF
Amendment 0001.pdf PDF
Attachment E Seed Project Price and Services Schedule.xlsx XLSX spreadsheet
Attachment C - TORFP Seed Project.pdf PDF
Exhibit 5 Past Performance Questionnaire.docx DOCX document
SOW Attachment 7.10 - Drawings - Site Plan.pdf PDF
SOW Attachment 7.2 - Submittal Transmittal Form.xlsx XLSX spreadsheet
SOW Attachment 7.3 - Project Management Information System.docx DOCX document
GSA527-21.pdf PDF
RFP SOUTH MATOC 47PL0123R0014.pdf PDF
South MATOC Agreement.pdf PDF
SOW Attachment 7.11 - Trench Drain.pdf PDF
SOW Attachment 7.9 - Low embodied carbon concrete-Sept 22.pdf PDF
SOW Attachment 7.8 - Environmentally Preferable Asphalt-Sept 22.pdf PDF
SOW Attachment 7.6 - Sample ROCAL.xlsx XLSX spreadsheet
SF1442 47PL0123R0014 SMATOC.pdf PDF
South MATOC SOW 11222022.pdf PDF
Attachment D Seed Project SOW dated 07-25-2023.pdf PDF
Attachment A South MATOC Terms and Conditions.pdf PDF
Attachment B Example of TO Reps and Certs March 2023.pdf PDF
Exhibit 6 GSA Security Manual.pdf PDF
Exhibit 2 GSA Affiliated Customer Accounts.pdf PDF
SOW Attachment 7.4 - P120 - Cost and Schedule Management Policy and Requirements.pdf PDF
SOW Attachment 7.7 - CIW FORM 850.docx DOCX document
Exhibit 7 IDIQ Price Schedule.xlsx XLSX spreadsheet
SF1442 47PL0123R0055 Seed Project.pdf PDF
Attachment F SEED Project Wage Deterimination - WA202330001 09-01-2023.pdf PDF
Exhibit 1 3490.3 Policy.pdf PDF
Exhibit 4 Sample Key Personnel Resume Form.docx DOCX document
Exhibit 3 Project Experience Form.docx DOCX document
SOW Attachment 7.1 - Vendor Security Training 6 2021.pptx PPTX presentation
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Waste Diversion Plan

: +christopher.clever@gsa.gov +walter.tersch@gsa.gov

(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.

-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.

-Christopher Clever - PCBL That's correct.

-Jake Begnaud - WPIDBBProject Waste Management PlanSubmittal Type:Waste Diversion Plan (Anticipated):FALSEWaste Diversion Report (Final) :FALSE
The general info in these gray cells replicates onto the Report tabs.
Project Name:ECC (estimated construction cost):Project Manager:ePM/ePMX Project # :
Project Short Description:PM email or phone:gBUILD Project # :
Building Number:Service Center / Field Office:Budget Activity:(list all applicable)RWA # :

Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)

Material*
(see weight conversion factors below)Diversion MethodTarget Diversion Rate for each material, by weight
(Change to actual target(s) as needed)Diverted (lbs)Landfilled (lbs)Total C&D material weight (Diverted + Landfilled) (lbs)Diversion

Rate

Reuse*Recycle or CompostDonation
AsphaltFALSEFALSEFALSE50%000n/a
Brick, Masonry, and TileFALSEFALSEFALSE50%000n/a
CardboardFALSEFALSEFALSE50%000n/a
Carpet, including PaddingFALSEFALSEFALSE50%000n/a
Ceiling tileFALSEFALSEFALSE50%000n/a
ConcreteFALSEFALSEFALSE50%000n/a
Drywall/ sheetrock (unpainted)FALSEFALSEFALSE50%000n/a
MetalsFALSEFALSEFALSE50%000n/a
Painted wood, drywall, or plywoodFALSEFALSEFALSE50%000n/a
Reusable itemsFALSEFALSEFALSE50%000n/a
RoofingFALSEFALSEFALSE50%000n/a
Soil, Rock, Land Clearing DebrisFALSEFALSEFALSE50%000n/a
Wood (unpainted)FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Total**:000n/a
Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse.
ItemReuse OnsiteReuse OffsiteOff-Site Recipient or Salvage/ Deconstruction Company
Volume-to-Weight Conversion Factor Reference Table
If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal.
Asphalt paving: 1 cubic yard = 773 lbsDirt or sand: 1 cubic yard = 929 lbs
Asphalt or composite roof shingles: 1 cubic yard = 731 lbsFiberglass insulation, loose: 1 cubic yard = 17 lbs
Brick, laid flat: 1 flat square foot = 20 lbsMixed (composite) C&D material: 1 cubic yard = 417 lbs
Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs)Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs
Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbsRock, crushed: 1 cubic yard = 2,570 lbs
Concrete: 1 cubic yard = 860 lbsWood: 1 cubic yard = 169 lbs
*Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 1

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 2

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 3

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 4

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 5

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 6

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 7

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 8

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 9

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 10

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 11

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 12

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.