Attachment E Seed Project Price and Services Schedule.xlsx
XLSX spreadsheet 153 KB Posted
- Attached to
- R10 South Multiple Award Task Order Contract MATOC Replacement Federal contract opportunity
- Solicitation number
- 47PL0123R0014
About this file
This document contains a price template and instructions for a federal construction contract opportunity with the General Services Administration Public Buildings Service Region 10. Offerors are instructed to use the provided spreadsheet to submit fixed-price quotes for a single CLIN for construction services. The period of performance is to be included with the proposal. Additional evaluated pricing elements include future modification markup rates and government delay costs. The total evaluated price will be calculated from the base price, estimated government administration costs based on the proposed period of performance, future modification costs using the offered markup rate, and government delay costs using the proposed daily rate. Travel and labor costs for long-term and short-term clearance requirements are also to be included in pricing.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price
| INSTRUCTIONS: Please use this spreadsheet to submit quotes in excel. Please do not PDF and submit. Only make entries in area in green. | ||||
| CLIN | DESCRIPTION | QUANITY | UNIT | AMOUNT |
| 0001 | CONSTRUCTION | 1 | LS | |
| TOTAL PROPOSED PRICE | $ - 0 | |||
| ADDITIONAL PRICE ELEMENTS (See Evaluated Price Information Worksheet) | ||||
| Period of Performance Offered: (days) | 0 | |||
| Future Modification Mark Up Rate Offered % | 0% | |||
| Government caused delay rate | Per Day | $ - 0 |
Price Schedule Notes
| PROPOSAL PRICE SCHEDULE NOTES | |
| 1 | Offeror shall prepare pricing in accordance with the attached Statement of Work and associated attachments/appendices. See FAR Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984). |
2 Offeror shall submit pricing (inclusive of profit and overhead as applicable) on all items. For purposes of price analysis the TOTAL EVALUATED PROPOSED PRICE will be utilized.
3 The total award price associated with this contract shall include all design and construction costs.
| 4 | Funds for this project are currently available. |
| The intent of this solicitation is to obtain the best proposal within the cost limitation for the price proposed and to ensure the best value when considering price and non-price factors. Offerors are advised that there is no obligation to approach or match the cost limitation in the offer. |
Price Breakout Worksheet
| PRICE BREAKOUT WORKSHEET | |||||
| CLIN | Description | QTY/UNIT | Unit Price | Total Amount | |
| 0001 | Construction | ||||
| A. | 1 | $ - 0 | $ - 0 | ||
| Add additional lines as needed. | |||||
| I. CLIN 0001 TOTAL | $ - 0 | ||||
| TOTAL | $ - 0 |
| NOTES |
| 1. CLIN 0001 – Offerors shall provide detailed pricing breakout information to support the proposed lump sum amount for this CLIN. Information shall provide this additional pricing backup documentation in CSI format. Provide a lump sum and include a breakout of your pricing for regular and overtime hours. Discuss the approach for this element in technical evaluation Factor 3 Subfactor 2. |
FOR INFORMATION ONLY: For purposes of calculating Long Term Clearance costs, contractor personnel who require routine access to GSA-controlled facilities for more than six months and/or access to government information technology (IT) systems must receive a favorable HSPD-12 security background investigation. The following information is provided to assist the contractor in estimating the costs associated with this requirement. The contractor will be expected to utilize the nearest credentialing site to their offices or place of contract performance. The credentialing station may be a mobile station in the area or credentialing stations may be located through the following: http://www.fedidcard.gov/centerlocator.aspx. Credentialing centers that are listed as “Open to all Agency personnel” means that they are open to personnel from any GSA Managed Service Office (MSO) customer agency including GSA contractors. Credentialing centers that are listed as “For use by personnel from this Agency only” means that they are only open to personnel of the agency that is hosting that credentialing center. Currently a minimum of two visits to a credentialing center are required to enroll and activate the card once received. Travel distance to a credentialing center will vary based on availability of enrollment and activation stations. If there is a problem activating the PIV card, one additional visit to the credentialing center may be required. Additional visits to a credentialing center may also be required if the card holder needs to: renew a PIV card that has expired or will expire within 60 days; have new certificates downloaded to the PIV card because the current certificates on the card have expired or will expire within 60 days; or replace a lost, stolen, or damaged PIV card. Each visit to a credentialing center is scheduled for 15 minutes. Filling out the form for a NACI clearance takes about 4 hours on average. Individual contractor employee involvement in processing, getting questions answered, fingerprints, etc. takes another 3 hours on average. Times may vary depending on individual circumstances and the level of clearance required.
If a Long Term HSPD-12 credential is required, the contractor is responsible for all travel and labor costs associated with fingerprinting to meet background investigation requirements and PIV Card enrollment and activation to meet HSPD-12 requirements and shall include these costs in the breakout worksheet and Price Schedule lump sum price proposal above. Travel costs are comprised of mileage, vehicle rental or other modes of transportation, per diem, and lodging.
For purposes of calculating Short Term Clearance costs, contractor personnel who require temporary (less than 6 months) access to the facility need only complete the Contractor Information Worksheet (CIW) and fingerprint requirements for submission of an initial suitability determination review. Travel to credentialing stations is not required for this type of clearance. Contractors shall, however, still be responsible for including all anticipated labor and travel costs associated with completion of the required CIW paperwork and obtainment of acceptable fingerprints.
Evaluated Price Info sheet
| TOTAL EVALUATED PRICE INFORMATION WORKSHEET |
| FOR USE IN PRICE ANALYSIS |
| 1. | TOTAL BASE BID |
| Enter total price proposed for Base Bid (i.e. CLIN 0001) as indicated on Price Schedule above. |
| 2. | EVALUATED GOVERNMENT ADMINISTRATION COSTS. |
| Enter the number of days proposed to complete the project, inclusive of design and construction efforts. |
The project period of performance shall be 180 calendar days.
For price evaluation purposes, complete the formula below to calculate this cost.
| 0 | calendar days | X | $110 | /day = | $ - 0 | |
| (construction duration offered) | (Est. Gov't Daily Rate) |
NOTE: Failure to offer a contract duration within the range specified herein (180) calendar days, inclusive) shall result in the Offeror’s proposal being deemed non-responsive and will not be considered for award.
| 3. | EVALUATED FUTURE MODIFICATIONS MARK-UP COSTS. |
| Enter the percentage proposed for use as the predetermined profit and overhead mark-up rate on future modification. This proposed percentage shall be inclusive of all Contractor overhead, general and administrative (G&A), bonds, insurance fees, all other indirect costs and commission, profit and other associated fees. The rates offered shall be used by the Government for future contract modifications, except for Government-caused delays, if any arise after award. For price evaluation purposes, complete the formula below to calculate this cost. |
1 (plus) + 0% X (Equal) = $ - 0
(mark up rate offered) (Est Future Mods Direct Costs)
| 4 | . EVALUATED GOVERNMENT CAUSED DELAY COSTS. |
| Enter the proposed daily delay rate for use in calculating Government caused delay costs during contract performance. The daily delay rate shall be inclusive of Contractor and Subcontractor field overhead, home office overhead, general and administrative costs, commissions, profits, bonds, and insurance fees which are the result of delays caused by the Government. The rate shall be used by the Government for calculating delay costs during contract performance if the contractor demonstrates the delay caused increased costs to be incurred. For price evaluation purposes, complete the formula below to calculate this cost. |
$ - 0 X 30 days (Equal) = $ - 0