SOW 518-21-103 Womens Health Construction.pdf

PDF 113 KB Posted

Attached to
Z1DA--518-21-103 Women's Health 3 floors Construction Presolicitation Notice
Solicitation number
36C24123B0002
Issued by

About this file

This scope of work document outlines requirements for renovating approximately 18,565 square feet of space at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts to create a new Women's Health Clinic. The project consists of renovating existing administrative space to include a new reception area, locker rooms, offices, conference/lounge, exam rooms, procedure rooms, conference room, bathrooms, installing an elevator, installing a ramp, and replacing all mechanical, plumbing, electrical and lighting systems. Additional requirements include connecting the building to the existing network, modifying sidewalks and parking lots, and performing related site work over a 365 calendar day performance period. The related federal contract opportunity is a presolicitation notice for solicitation number 36C24123B0002 to obtain these construction services for the Women's Health Clinic renovation project at the Edith Nourse Rogers Memorial Veterans Hospital.

View the file

Other files

File Type Posted
36C24123B0002 0011.docx DOCX document
Bedford Womens Health Construction RFIs 07262023.docx DOCX document
36C24123B0002 0010.docx DOCX document
518-21-103 Site Visit Sign-In Sheet.pdf PDF
List of Attachments.pdf PDF
36C24123B0002 0009.pdf PDF
Plumbing-21053.pdf PDF
branches_productsheet.pdf PDF
FP-20153.pdf PDF
Interiors-21053.pdf PDF
087100.pdf PDF
375-Ultra-Durable-Guide-Specifications-2109861.pdf PDF
090600 SCHEDULE FOR FINISHES.pdf PDF
081710.pdf PDF
Architectural-21053.pdf PDF
085113.pdf PDF
Structural-21053.pdf PDF
Civil-20153.pdf PDF
Mechanical-21053.pdf PDF
Electrical-21053.pdf PDF
General-21053.pdf PDF
074624.pdf PDF
375Info sheet.pdf PDF
518-21-103 012 HA102.pdf PDF
518-21-103 Bedford Womens Clinic RFIs (COMPILED).docx DOCX document
36C24123B0002 0008.docx DOCX document
518-21-103 012 HA101.pdf PDF
028211_Bedford VAMC Bldg 12.pdf PDF
02833313_Bedford VAMC Bldg 12.pdf PDF
518-21-103 Contracting and VA RFIs.docx DOCX document
36C24123B0002 0007.docx DOCX document
36C24123B0002 0006.docx DOCX document
36C24123B0002 0005.docx DOCX document
36C24123B0002 0004.docx DOCX document
100 - Interior.pdf PDF
36C24123B0002 0003.docx DOCX document
36C24123B0002 0002.docx DOCX document
36C24123B0002_2.docx DOCX document
36C24123B0002 0001.docx DOCX document
Full Set Drawings.pdf PDF
36C24123B0002_1.docx DOCX document
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.pdf PDF
S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf PDF
General Decision MA20230001 03032023.pdf PDF
Asbestos Documents.pdf PDF
100 Percent Specifications.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 6, 2023

SCOPE OF WORK

1. PROJECT DATA:

TITLE: 518-21-103 Relocate and Renovate Women’s Health

BUILDING/FACILITY: Building 12 – Edith Nourse Rogers Memorial Veterans Hospital, Bedford, MA

JOB ORDER CONTRACT NUMBER: TBD

PROJECT REQUEST NO: TBD

COTR: Charmaine Brooks Charmaine.Brooks@va.gov

REQUESTOR: Engineering

CONTRACTOR: - TBD

CONSTRUCTION DURATION: 365 calendar days

2. GENERAL SCOPE:

Contractor shall provide labor, material, tools and equipment, and construction services necessary to renovate approximately 18,565 SF of Building 12 at Edith Nourse Rogers Memorial Hospital, as required by the drawings and specifications, to create a new Women’s Health Clinic.

3. DETAILED REQUIREMENTS:

The project consists of renovating approximately 18,565 SF square feet of space in and around building 12 at Edith Nourse Rogers Memorial Hospital, to convert administrative space into clinical space for a new Women’s Health Clinic.

The scope of the work shall include a new reception area, locker rooms, offices, conference/lounge, exam rooms, procedure rooms, conference room, bathrooms, installing an elevator, installing a ramp, and removing and replacing all mechanical, plumbing, electrical and lighting systems. Contractor shall also connect the building to the existing net The sidewalk and parking lot shall also be modified to accommodate the building additions and changes.

Work shall include the necessary supervision, labor, equipment, material, transportation, testing, site surveying and infrastructure required to complete work, in accordance with the Contract Documents, including Technical Specifications and Drawings. Work includes, but is not limited to, general construction, demolition of existing interior construction (including utilities and hazmat abatement), concrete, ceilings, casework, carpentry, partitions, doors, windows, louvers, finishes, miscellaneous specialties, exterior cladding (brick infill), windows, louvers, mechanical, electrical, plumbing, fire protection, telephone and data cabling, security systems, equipment, site utilities (HVAC piping), site work (mechanical equipment pads), landscaping (patch existing) and other related items.

February 6, 2023

The construction schedule is 365 calendar days from the Notice to Proceed and shall be performed in several phases as indicated in the Contract Documents.

END OF SCOPE OF WORK

SCOPE OF WORK

File details come from the government source that posted it. Updated .