About this file

This presolicitation notice is for a construction project to build out three floors of a Women's Health Clinic at the Bedford VA Medical Center. The project involves mechanical, electrical, and plumbing work. The solicitation will be an invitation for bid issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The response date will be included in the ensuing solicitation. The award is expected in Fall 2023 with work expected to be complete by Spring 2024.

View the file

Other files

File Type Posted
36C24123B0002 0011.docx DOCX document
Bedford Womens Health Construction RFIs 07262023.docx DOCX document
36C24123B0002 0010.docx DOCX document
518-21-103 Site Visit Sign-In Sheet.pdf PDF
List of Attachments.pdf PDF
36C24123B0002 0009.pdf PDF
Plumbing-21053.pdf PDF
branches_productsheet.pdf PDF
FP-20153.pdf PDF
Interiors-21053.pdf PDF
087100.pdf PDF
375-Ultra-Durable-Guide-Specifications-2109861.pdf PDF
090600 SCHEDULE FOR FINISHES.pdf PDF
081710.pdf PDF
Architectural-21053.pdf PDF
085113.pdf PDF
Structural-21053.pdf PDF
Civil-20153.pdf PDF
Electrical-21053.pdf PDF
General-21053.pdf PDF
074624.pdf PDF
375Info sheet.pdf PDF
518-21-103 012 HA102.pdf PDF
518-21-103 Bedford Womens Clinic RFIs (COMPILED).docx DOCX document
36C24123B0002 0008.docx DOCX document
518-21-103 012 HA101.pdf PDF
028211_Bedford VAMC Bldg 12.pdf PDF
02833313_Bedford VAMC Bldg 12.pdf PDF
518-21-103 Contracting and VA RFIs.docx DOCX document
36C24123B0002 0007.docx DOCX document
36C24123B0002 0006.docx DOCX document
36C24123B0002 0005.docx DOCX document
36C24123B0002 0004.docx DOCX document
100 - Interior.pdf PDF
36C24123B0002 0003.docx DOCX document
36C24123B0002 0002.docx DOCX document
36C24123B0002_2.docx DOCX document
36C24123B0002 0001.docx DOCX document
Full Set Drawings.pdf PDF
36C24123B0002_1.docx DOCX document
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.pdf PDF
S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf PDF
General Decision MA20230001 03032023.pdf PDF
SOW 518-21-103 Womens Health Construction.pdf PDF
Asbestos Documents.pdf PDF
100 Percent Specifications.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LC

M

HPS

HPR

MPS

MPR

LPS

LPR

PC

HWS

HWR

GHS

GHR

V

SWS

SWR

CWR

CHR

GCR

RL

RS

RHG

CWS

CHS

GCS

MW

D

GRR

GRS

(EX) SYS

(R) SYS

VR

CTPS

CTPD

FWPS

FWPD

CF

FWS

BWS

CBD

BO

TC

CA

OFL

HW

SW

CW

FOR

FOS

LPG(I)

NG(I)

NG

RH

SCH

SH

TH

PS

RC

WB

CSH

SS

A PTAC

A TWU

A

FCU

FCU

A

PTACA

MB

VAV

FE

AV

MV

T

TT

M

MT

PT

TT

FT

IT

CT

SPS

SD

PDT

KR

TSL

HS

ZC

LC

LT

PDS

TSH

EPT

AT

CO2

AT

CO

AT

OC

LTCP

HVAC

ECC

TC

VSMC

PC

SC

FC

PSH

FSH

PSL

FSL

A

M

BIT

T M

ACU-1

(EX)S

(TYP. 6)

H4

H7

A

DUCTWORK SYMBOLS

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

LINEAR SLOT DIFFUSER

SUPPLY TOP REGISTER OR GRILLE

(WALL TYPE)

EXHAUST OR RETURN CEILING

REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER

OR GRILLE (WALL TYPE)

EXHAUST OR RETURN REGISTER OR

TOP GRILLE (WALL TYPE)

VANED ELBOW & AIR SPLIT TYPE DUCT

TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

LIMIT OF DEMOLITION

FLEXIBLE CONNECTION, EQUIPMENT,

VIBRATION, OR SEISMIC

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES

(EVEN IF SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW

(LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS:

WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE REMOVED

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

SECTION.)

FLEXIBLE DUCTWORK (INSULATED)

DUCT WITH SOUND LINING

MANUAL VOLUME DAMPER

FIRE DAMPER

BACK DRAFT DAMPER

COMBINATION FIRE/SMOKE DAMPER

POINT OF CHANGE IN DUCT CONSTRUCTION BY

STATIC PRESSURE CLASS. THE NUMBER

ASSIGNS PRESSURE CLASS (IN. OF WATER)

WHICH WILL ACCOMMODATE MAXIMUM

OPERATING PRESSURE IN THE DUCT

SUBSECTION. THE SYMBOL CONTINUES THE

ASSIGNMENT UNTIL THE DUCT TERMINATES OR

ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT

INDICATES NEGATIVE PRESSURE.

AUTOMATIC CONTROL DAMPER MODULATING

AUTOMATIC CONTROL DAMPER TWO POSITION

STAINLESS STEEL DUCT

MANUAL SPLITTER DAMPER

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

DUCT MOUNTED COIL

(HOT WATER OR STEAM COIL)

DUCT MOUNTED COIL

(ELECTRIC)

ABBREVIATIONS

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL

DAMPER,MODULATING

ACD-TP AUTOMATIC CONTROL

DAMPER,TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE

DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS

(SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS

(SUBMISSION2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO

COOLING TOWER)

CWS CONDENSER WATER SUPPLY

(FROM COOLING TOWER)

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT

(SUBMISSION1)

DD-2 DESIGN DEVELOPMENT

(SUBMISSION2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

J INTENTIALLY LEFT BLANK

kg KILOGRAM kg/HRKILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR

LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT

EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND

(OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCV MODULATING CONTROL VAVLVE

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY

REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC &

ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER

(SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE)

STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

R REMOVE

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE

DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT

EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY

(STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING)

PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RT ROOF TOP

RTAHU ROOF TOP AIR HANDLING UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

TERMINAL UNIT SYMBOLS

2'x4' RADIANT CEILING PANEL

2'x2' RADIANT CEILING PANEL

AIR CURTAIN

THRU WALL AIR CONDITIONING UNIT.

UNIT. LETTER INDICATES UNIT SIZE.

WINDOW TYPE AIR CONDITIONING

LETTER INDICATES UNIT SIZE.

UNIT HEATER (VERTICAL)

UNIT HEATER (HORIZONTAL)

CONVECTOR OR RADIATOR (RECESSED)

CONVECTOR OR RADIATOR (WALL HUNG)

INDICATES UNIT SIZE.

FLOOR MOUNTED HEAT PUMP. LETTER

FAN POWERED VARIABLE VOLUME

TERMINAL UNIT WITH HEATING COIL.

DOUBLE DUCT MIXING BOX.

PIPING SYMBOLS (CONTINUED)

STANDARD PRACTICE SP-58

* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY

GENERAL PIPING SYMBOLS

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

FLOW ELEMENT

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

PIPING ACCESSORIES SEE DETAIL

INVERTED BUCKET TRAP SET INCLUDING

PIPE UP

PIPE DOWN

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

MANUAL AIR VENT

THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

QUICK-COUPLE HOSE CONNECTOR

FLOOR MOUNTED VERTICAL

RECESSED FAN COIL UNIT.

LETTER INDICATES UNIT SIZE.

FLOOR MOUNTED VERTICAL

CABINET FAN COIL UNIT.

LETTER INDICATES UNIT SIZE.

VALVE SYMBOLS

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE (MCV-"X")

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

FLOW MEASURING VENTURI DEVICE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

HOSE CONNECTOR

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE

WATER LEVEL CONTROLLER

FLOW METER

CONTROLS SYMBOLS

PRESSURE DIFFERENTIAL SWITCH

INTEGRATE CONTROL POINT ON REMOTE GRAPHICS

WORKSTATION AT ENERGY CONTROL CENTER

TEMPERATURE CONTROLLER.

SEE SEQUENCE OF OPERATION

PRESSURE CONTROLLER.

SEE SEQUENCE OF OPERATION

SPEED CONTROLLER.

SEE SEQUENCE OF OPERATION

FLOW CONTROLLER.

SEE SEQUENCE OF OPERATION

FLOW SWITCH HIGH

FLOW SWITCH LOW

ROOM

THERMOSTAT/TRANSMITTER -

WALL MOUNT

ROOM HUMIDISTAT

(MOISTURE)/TRANSMITTER - WALL MOUNT

TEMPERATURE TRANSMITTER

TEMPERATURE TRANSMITTER,

AVERAGING ELEMENT

MOISTURE (HUMIDITY) TRANSMITTER

PRESSURE TRANSMITTER

STATIC PRESSURE SENSOR

FLOW TRANSMITTER

CURRENT TRANSMITTER

CONDUCTIVITY TRANSMITTER

SMOKE DETECTOR

PRESSURE DIFFERENTIAL TRANSMITTER

HAND SWITCH (HAND-OFF-AUTO SWITCH)

VALVE OR DAMPER POSITION CONTROLLER

LOCAL RECORDING TIME CLOCK (RUNTIME)

TEMPERATURE SWITCH, LOW (FREEZESTAT)

TEMPERATURE SWITCH, HIGH (FREEZESTAT)

LEVEL CONTROLLER

LEVEL TRANSMITTER

PRESSURE SWITCH HIGH

PRESSURE SWITCH LOW

ELECTRONIC TO PNEUMATIC TRANSDUCER

CARBON DIOXIDE TRANSMITTER

CARBON MONOXIDE TRANSMITTER

OCCUPANCY SENSOR

LOCAL TEMPERATURE CONTROL PANEL

HVAC CONTROL PANEL

VARIABLE SPEED MOTOR CONTROLLER

TEMPERATURE SENSING ELEMENT FOR

TRANSMITTING TEMPERATURE TO EMCS

(PROVIDE 12 INCHES [200mm] MINIMUM

LENGTH IN DUCT WHEN SPACE PERMITS.)

SENSOR WITH AVERAGING ELEMENT TO TRANSMIT

TEMPERATURE TO EMCS

MOTOR STARTER

ELECTRIC OPERATED CONTROL DAMPER/OR VALVE

PIPING SYMBOLS

TERMINAL UNIT WITH REHEAT

COIL

VAV= VARIABLE VOLUME

CV= CONSTANT VOLUME

BALL-IN-TUBE AIR FLOW INDICATOR IN WALL

DN

DN

UP

UP

D

R

DNUP

BDD

FC

10x8

FD

VD

SUPPLY

RETURN45°

45°

N

2 1

1/24

F/S DPR

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HOT WATER HEATING SUPPLY

CONDENSATE PUMP DISCHARGE

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

VENT LINE

SOLAR WATER RETURN

SOLAR WATER SUPPLY

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

REFRIGERANT SUCTION

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

CHILLED WATER SUPPLY

CHILLED WATER RETURN

DRAIN LINE

MAKE-UP WATER

CONDENSER WATER RETURN (TO TOWER)

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

CONDENSER WATER SUPPLY (FROM TOWER)

HOT WATER HEATING RETURN

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURN

EXISTING PIPE TO BE REMOVED

EXISTING PIPE (TYPE AS INDICATED)

VACUUM CONDENSATE RETURN

CONDENSATE TRANSFER PUMP SUCTION

CONDENSATE TRANSFER PUMP DISCHARGE

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

FEEDWATER SAMPLE (FROM DEAERATOR)

BOILER WATER SAMPLE

CONTINUOUS BLOWDOWN

CHEMICAL FEED

BOILER BLOWOFF

TUBE CLEANER WATER SUPPLY

COMPRESSED AIR

OVERFLOW

COLD WATER (CITY WATER)

LIQUEFIED PETROLEUM GAS IGNITER FUEL

NATURAL GAS IGNITER FUEL

NATURAL GAS MAIN FUEL

HOT WATER

SOFTENED WATER

FUEL OIL RETURN

FUEL OIL SUPPLY

RISER CLAMP (TYPE 42)*

FLOOR-SUPPORTED PIPE STAND

CLEVIS-TYPE HANGER

VARIABLE SPRING-TYPE HANGER (TYPE 51)*

ROLLER-TYPE HANGER

TO TRAPEZE EXCEPT WHERE RH ARE INDICATED)

TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT

SPRING CUSHION-TYPE HANGER (TYPE 48 OR 49)*

SLIDING SUPPORTS (TYPE 35)*

CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*

WALL BRACKET (TYPE 31, 32, 33)*

COMBINATION ROOM THERMOSTAT /

HUMIDISTAT - WALL MOUNT

DRAWING SYMBOLS

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

DRAWING NUMBER WHERE DRAWN

MECHANICAL EQUIPMENT IDENTIFICATION TAG

DIFFUSER, REGISTER, OR GRILLE TAG

CFM AIR FLOW

IDENTIFICATION # (SEE SCHEDULE)

S=SUPPLY, R=RETURN, E=EXHAUST

QUANTITY

GENERAL NOTES

1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE

OR ABOVE THE HARD SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES

ARE NET INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED UNDER THE

ARCHITECTURAL SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT

DETAILS.

6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING

DIFFUSERS, REGISTERS, AND GRILLES.

8. SEISMIC PROVISIONS NOT REQUIRED. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS

OTHERWISE NOTED.

9. FIELD COORDINATE ALL PIPE AND DUCT RUNS BEFORE FABRICATION AND INSTALLATION. NO EXTRAS SHALL BE PERMITTED FOR REROUTING, REFABRICATION, RESTOCKING OR REMOVAL OF INSTALLED WORK DUE TO COORDINATION WITH BUILDING STRUCTURE, WORK OF OTHER TRADES OR EXISTING BUILDING COMPONENTS. DRAWINGS ARE SCHEMATIC AND DO NOT SHOW ALL NECESSARY CHANGES IN ELEVATION OR OFFSETS REQUIRED FOR A COMPLETE INSTALLATION. PROVIDE ALL DUCT AND

PIPE OFFSETS AS REQUIRED.

2-SF 3N

TYPICAL UNIT NO.

LEVEL OF BUILDING WHERE EQUIPMENT IS LOCATED.

BUILDING WING (N=NORTH)

EQUIPMENT ABBREVIATION (SUPPLY FAN)

EQUIPMENT #

2-TU 3N-R

TYPICAL TERMINAL UNIT NO.

LEVEL OF BUILDING WHERE EQUIPMENT IS LOCATED.

(R=RETURN)

EQUIPMENT ABBREVIATION (TERMINAL UNIT)

EQUIPMENT #

BUILDING WING (N=NORTH)

SHADE INDICATES NO AIR

DISTRIBUTION IN THIS DIRECTION

CEILING DIFFUSER (3-WAY

SHOWN)

TRUE NORTH

Architecture Engineering Design-Build paradigm

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS FOR

CONSTRUCTION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1.877.700.7678 www.smrtinc.com

SMRT Architects and Engineers 200 Brickstone Square, Suite 303

Andover, Massachusetts 01810

200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

FULLY SPRINKLERED

BEDFORD VA MEDICAL CENTER

C :\U se rs

\B ha nn a\

D oc um en ts \2

_V A

Be df or d

W om en s

C lin ic _M

EC

H

_R

_B H an na

L7 W

C 3.

rv t

6/ 9/

1:

:2

AM

M-001

MECHANICAL LEGEND AND

ABBREVIATIONS

WOMEN'S CLINIC DESIGN

518-21-103

06/09/2023 MJC BMH

200 SPRINGS ROAD, BEDFORD, MA 01730

Revisions: Date:

ADDENDUM 1 JUNE 9, 2023

6/9/23

DEMOLITION NOTES:

1. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE EXTENT OF THE

DEMOLITION SCOPE OF WORK AND AREA. THE DEMOLITION PLANS INDICATE

THE GENERAL INTENT AND ARE NOT INTENDED TO SHALL ALL ITEMS TO BE

REMOVED OR RETAINED.

2. VISIT THE SITE PRIOR TO SUBMISSION OF THE BIDS TO BECOME FAMILIAR WITH

THE ACTUAL CONDITIONS AND EXTENT OF THE WORK.

3. TRACE AND LABEL ALL EXISTING SYSTEMS WITHIN THE DEMOLITION AREA AND

BEYOND PRIOR TO DISCONNECTION AND REMOVAL TO ENSURE THAT NO AREA

OUTSIDE THE DEMOLITION AREA IS AFFECTED. REVIEW IN DETAIL WITH THE

GENERAL CONTRACTOR AND OWNER WHAT IS TO BE REMOVED AND REMAIN

PRIOR TO WORK COMMENCING. THERE SHALL BE NO INTERRUPTION OF

SERVICES OUTSIDE THE DEMOLITION AREA WITHOUT APPROVAL FROM THE

OWNERS REPRESENTATIVE.

4. NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY OF ANY UNANTICIPATED

HIDDEN CONDITIONS ENCOUNTERED DURING THE DEMOLITION.

5. ALL ITEMS REMOVED SHALL BE OFFERED TO THE OWNER FOR SALVAGE. IF THE

OWNER DOES NOT TAKE POSSESSION, DISPOSE OF ITEMS IN A SAFE AND

LEGAL MANNER. ALL ITEMS CLASSIFIED AS HAZARDOUS SHALL BE DISPOSED AS

HAZARDOUS WASTES AND A UNIFORM HAZARDOUS WASTE MANIFEST SHALL BE

PROVIDED TO THE OWNER.

6. NOTIFY UTILITY COMPANIES IN ACCORDANCE WITH THEIR REQUIREMENTS

PRIOR TO DEMOLITION VERIFY THAT THE UTILITIES HAVE BEEN

DISCONNECTED, VALVED, CAPPED AND MADE SAFE PRIOR TO DEMOLITION.

7. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO

PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT

COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION

BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT

WINDBLOWN DUST.

8. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF

FLAMMABLE MATERIALS AT CONCEALED SPACES, SUCH AS PIPE INTERIORS OR

SHAFTS. VERIFY CONDITION AND CONTENTS OF HIDDEN SPACE BEFORE

STARTING FLAME CUTTING OPERATIONS. MAINTAIN FIRE WATCH AND

PORTABLE FIRE-SUPPRESSION DEVICES DURING FLAME CUTTING OPERATIONS.

MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES.

9. DRAIN, PURGE, OR OTHERWISE REMOVE, COLLECT AND DISPOSE OF

CHEMICALS, LIQUIDS, GASES, EXPLOSIVES, ACIDS, FLAMMABLES OR OTHER

DANGEROUS MATERIALS BEFORE PROCEEDING.

10. PROPERLY LABEL ALL UNLABELED PIPES THAT REMAIN WITH COLOR PIPE

MARKERS.

11. ALL DEMOLITION SCOPE ASSOCIATED WITH LOW VOLTAGE WIRING FOR

CONTROLS AND ASSOCIATED INTERLOCKS SHALL BE INCLUDED IN THIS

CONTRACT.

12. ALL EQUIPMENT LOCATIONS AND PIPE AND DUCTWORK SIZES INDICATED ARE

APPROXIMATE. VERIFY EXACT LOCATIONS AND SIZES IN THE FIELD.

13. REFER TO THE MECHANICAL DRAWINGS FOR THE FULL EXTENT OF THE SCOPE

OF DEMOLITION. DISCONNECT AND MAKE SAFE ALL MECHANICAL EQUIPMENT

IDENTIFIED FOR REMOVAL ON THE MECHANICAL DEMOLITION PLANS. THE

MECHANICAL SCOPE MAY EXTEND BEYOND THE AREA DEFINED BY THESE

WORK SCOPE LIMITS TO FULLY COMPLY WITH THE VARIOUS REQUIREMENTS

DEIFNED BY THESE NOTES.

14. THE HVAC DEMOLITION PLANS INDICATE GENERAL INTENT AND ARE NOT

INTENDED TO SHOW ALL COMPONENTS AND ITEMS TO BE REMOVED OR

RETAINED. THE HVAC, ATC, & TAB CONTRACTORS SHALL VISIT THE SITE PRIOR

TO SUBMISSION OF THEIR BIDS TO BECOME FAMILIAR WITH THE ACTUAL

WORKING CONDITIONS AND THE EXTENT OF WORK. EQUIPMENT AND

CONTROLS DESIGNATED TO BE REMOVED SHALL BE DISCONNECTED AND MADE

SAFE. THE HVAC, ATC, & TAB CONTRACTORS SHALL IMMEDIATELY NOTIFY THE

GENERAL CONTRACTOR AND THE OWNERS REPRESENTATIVE OF ANY

UNANTICIAPTED OR HIDDEN CONDITIONS ENCOUNTERED DURING DEMOLITION.

15. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF

ALL SYSTEMS OR BUILDING COMPONENTS DAMGED BY HIM AS A RESULT OF

CONSTRUCTION DURING THE EXECUTION OF THE WORK. DAMAGE SHALL

INCLUDE, BUT NOT BE LIMITED TO, THE DESTRUCTION OR DISPOSAL OF ITEMS

INTENDED TO REMAIN OR BE SALVAGED.

16. THE MECHANICAL CONTRACTOR SHALL SYSTEM TRACE AND LABEL ALL

EXISTING BRANCH SUSTEMS AND MAINS WITHIN OR ASSOCIATED WITH THE

DEMOLITION SCOPE, PRIOR TO DEMOLITION AND DISCONNECTION. ALL

SYSTEMS IDENTIFIED FOR REMOVAL SHALL BE TRACED AND FIELD LABELED TO

ENSURE THAT NO AREA OUTSIDE THE DEMOLITION SCOPE LIMIT IS AFFECTED.

17. IN ANY AREA REQUIRING THE PERFORMANCE OF ANY OTHER TRADE'S WORK,

THE MECHANICAL CONTRACTOR SHALL CAREFULLY REMOVE AND STORE ANY

OR ALL MECHANICAL ITEMS IN PATH OF WORK, REINSTALLING AND

RECONNECTING SAME AS REQUIRED, IN ACCORDANCE WITH THE PLANS AND

OR AS DIRECTED AFTER COMPLETION OF OTHER TRADES WORK IN THAT AREA.

18. THE MECHANICAL CONTRACTOR SHALL IDENTIFY ALL BRANCH SYSTEM

COMPONENTS WHICH ARE TO REMAIN WITHIN THE AREA OF DEMOLITION

SCOPE. THERE SHALL BE NO INTERRUPTION OF SERVICE TO ANY AREA

OUTSIDE THE SCOPE LIMITS WITHOUT WRITTEN APPROVAL FROM THE

OWNER'S REPRESENTATIVE. EXISTING EQUIPMENT TO REMAIN SHALL BE

LEFT IN A CODE COMPLIANT CONDITION.

19. THE MECHANICAL CONTRACTOR SHALL TAKE INVENTORY OF MECHANICAL

ITEMS THAT ARE REMOVED AND PROVIDE A LIST TO THE OWNER'S

REPRESENTATIVE FOR HIS SELECTION OF ITEMS TO BE RETAINED. ALL ITEMS

REJECTED BY THE REPRESENTATIVE SHALL BECOME THE PROPERTY OF THE

MECHANICAL CONTRACTOR AND SHALL BE REMOVED FROM THE SITE AND

DISPOSED OF LEGALLY.

20. THE MECHANICAL CONTRACTOR SHALL TEMPORARILY SUPPORT ALL ITEMS TO

REMAIN THAT ARE AFFECTED BY THE DEMOLITION OF BUILDING STRUCTURAL

COMPONENTS (WALLS, CEILINGS, PARTITIONS, ECT). CONTRACTOR SHALL

TEMPORARILY SUPPORT ITEMS AND SHALL PROVIDE PERMANENT SUPPORTS

WHEN FINALIZED STRUCTURES ARE IN PLACE.

21. ALL EXISTING MECHANICAL EQUIPMENT THAT IS TO BE RELOCATED SHALL BE

STORED IN A SAFE MANNER UNTIL SUCH TIME AS TO BE REINSTALLED. ANY

DAMAGE INCURRED TO EQUIPMENT SHALL BE RECTIFIED BY THE MECHANICAL

CONTRACTOR.

22. ALL REMOVED ITEMS SHALL BE LEGALLY DISPOSED OF BY THE MECHANICAL

CONTRACTOR UNLESS IDENTIFIED FOR REUSE. THE OWNER'S

REPRESENTATIVE SHALL INSPECT ALL RETAINED ITEMS, PRIOR TO

PLACEMENT IN THE IDENTIFIED STORAGE LOCATION BY THE MECHANICAL

CONTRACTOR.

23. MECHANICAL CONTRACTOR WORK SCOPE SHALL INCLUDE AND NOT BE

LIMITED TO THE FOLLOWING ADDITIONAL ITEMS AS PER ALL LANDLORD

STANDARDS AND PROCEDURES AND WITH PRIOR APPROCAL FROM THE

OWNER'S REPRESENTATIVE.

a. AFTER INSTALLATION OF NEW WORK, PROVIDE TESTING OF ALL SYSTEMS

IN ACCORDANCE TO THE SPECIFICATIONS.

b. CUTTING, CAPPING, & REMOVAL OF EXISTING DUCTWORK AND

INSULATION SYSTEMS.

c. PROTECT ALL EXISTING EQUIPMENT FROM DAMAGE IN AND AROUND EACH

INDIVIDUAL WORK SITE.

24. THE GENERAL CONTRACTOR AND THE MECHANICAL CONTRACTOR WILL

PROVIDE ALL NECESSARY EQUIPMENT TO PERFORM THE DEMOLITION AND

NEW WORK SCOPE.

25. PROVIDE ALL THE NECESSARY EQUIPMENT, MANPOWER, TOOLS,

MISELLANEOUS SUPPORTS, MISCELLANEOUS EQUIPMENT AND SUPPLIES TO

PROPERLY EXECUTE THE DEMOLITION AND NEW WORK.

26. PROVIDE ALL PERMITS AND COMPLY WITH ALL OASHA SAFETY REGULATIONS.

TAKE DUE DILLIGENCE IN THE PROTECTION OF ALL WORK PERSONNEL AND

THE GENERAL POPULATION IN AND AROUND THE WORK SITE. PROVIDE

ISOLATION BARRIERS BETWEEN ACTIVE WORK AREAS AND DEMOLITION ZONES.

KEEP THE WORK SITE CLEAN, SAFE, AND SECURE THROUGHOUT ALL PHASES

OF THE WORK ORDER.

27. PROVIDE ALL NECESSARY NEW DAMPERS, DUCT FLANGES & END CAPS, DUCT

SUPPORTS & MISCELLANEOUS STEEL REQUIRED TO ISOLATE EXISTING DUCT

SYSTEMS TO REMAIN WHEN OTHER SYSTEMS ARE REMOVED AND WHEN

DEEMED NECESSARY.

28. NOTIFY “THE OWNER'S” PROJECT MANAGER THROUGH THE GENERAL

CONTRACTOR ONE WEEK IN ADVANCE OF ANY INTENDED SHUTDOWNS OF

EXISTING SYSTEMS OF ANY SORT. NOTIFY “THE OWNER'S” PROJECT MANAGER

THROUGH THE GENERAL CONTRACTOR TWO WEEKS IN ADVANCE OF

REQUIRED ACCESS TO ADJACENT SPACES WHERE WORK IS TO BE

PERFORMED. “THE OWNER'S” PROJECT MANAGER WILL CONFIRM WITH THE

“USERS GROUP” THE TIME AND DURATION OF THE REQUIRED SHUT DOWN AND

ACCESS REQUIREMENTS AND INFORM THE CONTRACTOR IN WRITING OF THE

APPROVAL.

29. ALL FPBS, VAVS, EFS, AHUS, EQUIPMENT WITHIN THE SCOPE OF WORK SHALL

BE INSPECTED, TESTED, CLEANED, AND REPAIRED TO GOOD WORKING

CONDITION. PROVIDE ALL REQUIRED MOTORS, BELTS, SHEAVES, FLEXIBLE

DUCT CONNECTIONS, SUPPORTS, THERMOSTATS, CONTROLS, WIRING, VALVES,

PIPE, INSULATION, DRAINAGE AND DUCTS NEEDED TO BRING THE SYSTEM INTO

GOOD OPERATING CONDITION. REPLACE ALL DAMAGED OR NON-FUNCTIONING

EQUIPMENT WITH NEW LIKE-KIND COMPONENTES.

30. ALL EXISTING DUCTWORK TO REMAIN SHALL BE PROTECTED BY CONTRUCTION

FILTERS DURING CONSTRUCTING.

31. REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.

32. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD

VERIFYING, PRIOR TO FINAL BID, ALL EXISTING CONDITIONS FOR PLUMBING

AND MECHANICAL SYSTEMS WITH IN THE SCOPE OF WORK AREA AND WITHIN

CLOSE PROXIMITY OF THE SCOPE OF WORK AREA.

33. THE MECHANICAL CONTRACTOR SHALL PERFORM SERVICE AND REPAIR ON

THE EXISTING EQUIPMENT AND ITS ACCESSORIES AS FOLLOWS: CLEAN ALL

COILS, REPLACE FILTERS AND BELTS, INSPECT, REPAIR, OR REPLACE THE

ECONOMIZERS, DRIVES AND FAN BEARINGS, MOTORS, CONTROL

COMPONENTS, VALVES AND ANY OTHER ITEM NECESSARY FOR A COMPLETE

AND PROPER OPERATING SYSTEM. THIS CONTRACTOR SHALL ALSO VISIT THE

SITE, PRIOR TO FINAL BIDDING, AND VERIFY ALL EXISTING SITE CONDITIONS.

PROVIDE ALL MATERIAL AND COMPONENTS AS NEEDED TO BRING THE UNITS

TO FULL COMPLIANCEOF THE LOCAL AUTHORITY HAVING JURISDICTION.

34. WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION,

PREVENT CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING

DRAIN OPENING PRIOR TO START OF WORK.

GENERAL NOTES:

1. SEE SPECIFICATIONS FOR OTHER REQUIREMENTS.

2. ALL HVAC GENERAL NOTES, SYMBOLS LISTS & DETAILS ARE TO BE

CONSIDERED AS APPLICABLE TO ALL HVAC DRAWINGS FOR THIS PROJECT.

3. THE MECHANICAL CONTRACTOR SHALL BE FAMILIAR WITH ALL CONTRACT

DOCUMENTS FOR ALL TRADES AND COORDINATE WITH OTHER CONTRACTORS.

4. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND

SHALL CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE,

AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO THE INTERNATIONAL

BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.

5. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL INCIDENTAL

ACCESSORIES NECESSARY TO MAKE THE HVAC WORK COMPLETE AND READY

FOR OPERATION.

6. ALL MATERIALS AND EQUIPMENT UNLESS SPECIFICALLY INDICATED AS REUSED,

SHALL BE NEW.

7. THE MECHANICAL CONTRACTOR SHALL FIELD MEASURE EXACT SIZES AND

VERIFY ALL OPENINGS FOR SHAFTS AND LOUVERS PRIOR TO SUBMISSION OF

SHOP DRAWINGS AND INSTALLATION.

8. AT THE END OF EACH WORKING DAY THE CONSTRUCTION SITE SHALL BE LEFT

IN A CLEAN AND NEAT CONDITION.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HANDLING, STORAGE AND

SETTING OF ALL EQUIPMENT AND MATERIAL. CRANES, LIFTS, HOSTS, AND

SCAFFOLDING OF ALL EQUIPMENT SHALL BE EMPLOYED AS REQUIRED TO

COMPLETE THE INSTALLATION.

10. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH

EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE

WHICH CAN BE REASONABLY ANTICIPATED INCLUDING, BUT NOT LIMITED TO

ARCHITECTURAL, ELECTRICAL, STRUCTURAL, PLUMBING, AND OTHER SYSTEMS

INVOLVED ON THIS PROJECT.

11. THIS PROJECT INVOLVES CONSTRUCTION INSIDE AN EXISTING STRUCTURE.

CONTRACTORS, BY SUBMITTING A BID, ARE DEEMED TO BE COMPLETELY

FAMILIAR WITH THE EXISTING CONDITION OF THE BUILDING AS IT INFLUENCES

THE WORK DESCRIBED. ABSOLUTELY NO CLAIMS FOR EXTRA COMPENSATION

WILL BE CONSIDERED FOR EXISTING CONDITIONS VISIBLE OR REASONABLY

INFERABLE FROM A CAREFUL EXAMINATION OF THE EXISTING BUILDING.

12. THIS CONTRACTOR SHALL INSPECT THE EXISTING FIELD CONDITIONS AT THE

SITE AND THE "AS-BUILT" BASE BUILDING CONTRACT DOCUMENTS PRIOR TO

THE START OF ANY WORK TO DETERMINE WHAT EFFECT THE EXISTING

CONDITIONS WILL HAVE ON HIS WORK. POTENTIAL PROBLEM AREAS SHALL BE

BROUGHT TO THE ATTENTION OF THE ARCHITECT AND/OR ENGINEER

IMMEDIATELY.

13. LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE

SPACE ABOVE ELECTRICAL PANELS, TRANSFORMERS AND OTHER ELECTRICAL

EQUIPMENT.

14. FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATE WALLS.

REFER TO SPECIFICATIONS.

15. PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH

FOUNDATIONS, FLOORS, WALLS AND ROOF AND SEAL WEATHER/WATER TIGHT.

16. INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS

WITHOUT CEILINGS.

17. DUCTWORK SHALL NOT RUN ALONG FULL HEIGHT PARTITIONS.

18. ALL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE

WITH THE LATEST EDITION OF SMACNA STANDARDS.

19. PIPING AND DUCTWORK SHALL BE CONCEALED UNLESS OTHERWISE NOTED.

20. ACCESS PANELS SHALL BE PROVIDED TO ALLOW FOR CLEANING OF COILS AND

SERVICING OF DAMPERS, HEATERS, VALVES, AND ALL CONCEALED

MECHANICAL EQUIPMENT.

21. REFER TO PLUMBING DRAWINGS FOR GAS AND CONDENSATE DRAIN PIPING.

22. MAINTAIN ALL MANUFACTURER REQUIRED CLEARANCES FOR ACCESS AND

SERVICE.

23. PROVIDE A 4” HOUSEKEEPING PAD FOR EACH PIECE OF FLOOR MOUNTED

MECHANICAL EQUIPMENT. COORDINATE SIZES WITH MECHANICAL EQUIPMENT

SELECTED.

24. ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0” FROM EDGE TO

ROOF.

25. THE AUTOMATIC TEMPERATURE CONTROL (ATC) CONTRACTOR SHALL

COORDINATE THERMOSTAT LOCATIONS WITH ARCHITECTURAL FURNITURE

PLANS/EQUIPMENT LAYOUT. THERMOSTATS SHALL BE INSTALLED 54” ABOVE

FINISHED FLOOR UNLESS OTHERWISE NOTED.

26. THIS CONTRACTOR SHALL CONNECT HIS WORK TO VARIOUS EXISTING PIPING,

DUCTWORK, AND CONTROL SYSTEMS IN THE BASE BUILDING. THE NEW WORK

SHALL BE COMPATIBLE WITH THE EXISTING SYSTEMS. LOCATION OF

EQUIPMENT OR THE ROUTING OF THE VARIOUS SYSTEMS AS WELL AS

OPENINGS IN FLOOR SLABS OR WALLS SHALL BE GOVERNED BY THE EXISTING

CONDITIONS AS THEY APPEAR IN THE FIELD OR ON THE "AS-BUILT" DRAWINGS.

27. CARE SHALL BE TAKEN DURING THE INSTALLATION TO NOT DAMAGE OR

INTERRUPT BUILDING SYSTEMS AND SERVICES THAT ARE ALREADY INSTALLED.

DAMAGE TO SUCH SYSTEMS OR EQUIPMENT CAUSED BY THIS CONTRACTOR

DURING INSTALLATION SHALL BE REPAIRED AND/OR REPLACED AT THIS

CONTRACTOR'S EXPENSE TO THE COMPLETE SATISFACTION OF THE BUILDING

OWNER.

28. SHUTDOWN OF EXISTING SYSTEMS FOR CONNECTION TO EXISTING SERVICES

SHALL BE COORDINATED WITH THE CONSTRUCTION MANAGER OR GENERAL

CONTRACTOR AND BUILDING OWNER. THIS CONTRACTOR SHALL SUBMIT

REQUESTS, WHERE THEY AFFECT THE OPERATION OF THE BUILDING SYSTEMS,

AT LEAST ONE WEEK IN ADVANCE OF ANY REQUIRED SHUTDOWN. THE ACTUAL

SHUTDOWN PERIOD SHALL BE AS SHORT AS POSSIBLE AND AT A TIME

MUTUALLY AGREEABLE TO THE BUILDING OWNER AND THE CONSTRUCTION

MANAGER/GENERAL CONTRACTOR.

29. THE MECHANICAL CONTRACTOR SHALL COORDINATE ANY PREMIUM WORK

REQUIRED FOR THE PROJECT WITH THE GENERAL CONTRACTOR.

30. IF REQUIRED THE PROJECT SHALL BE PHASED IN ACCORDANCE WITH THE

APPROVED PHASING PLAN. THE CONTRACTOR SHALL OBTAIN APPROVAL FOR

THE SEQUENCING AND TIMING OF OPERATIONS PRIOR TO COMMENCING WORK.

SEE SPECIFICATIONS.

31. CONTRACTOR SHALL PROVIDE THE FOLLOWING SERVICES, AS APPLICABLE, ON

ALL EXISTING HVAC EQUIPMENT INDICATED TO BE REUSED: 1) FILTER

CHANGES, 2) BALANCING, 3) LUBRICATION. CONTRACTOR SHALL REPORT ANY

EQUIPMENT DEFICIENCIES FOUND TO THE ARCHITECT AND/OR ENGINEER.

32. THE FIRE PROOFING OF THE BUILDING STRUCTURE IS NOT TO BE REMOVED

FOR THE INSTALLATION OF HANGERS, SUPPORTS, DUCTWORK, ETC. IF FIRE

PROOFING IS DAMAGED, IT SHALL BE REPAIRED AT THE EXPENSE OF THE

TRADE.

33. CONTRACTOR SHALL PROVIDE AND SUBMIT DOCUMENTATION FOR TESTING

AND BALANCING OF ALL AIR AND WATER SYSTEMS, DUCT AND PIPING

PRESSURE AND LEAKAGE TESTS, OPERATING AND MAINTENANCE MANUALS,

AND AS-BUILT DRAWINGS. SEE SPECIFICATIONS FOR ADDITIONAL

REQUIREMENTS. PERFORM ALL PRESSURE AND LEAKAGE TESTS PRIOR TO

INSULATING.

34. MANY EQUIPMENT SCHEDULES DO NOT LIST QUANTITIES. CONTRACTOR SHALL

REFER TO ALL DRAWINGS AND PROVIDE THE REQUIRED QUANTITIES OF ALL

COMPONENTS.

35. INSTALL SMOKE DETECTORS IN DUCT SYSTEMS IN ACCORDANCE WITH NFPA.

36. FIRE DAMPERS AND ACCESS PANELS SHALL BE INSTALLED AT ALL 2-HOUR

RATED PARTITIONS AND FLOOR PENETRATIONS. IN ADDITION COMBINATION

FIRE/SMOKE DAMPERS AND ACCESS PANELS SHALL BE INSTALLED AT

PENETRATIONS OF ALL RATED SHAFT ENCLOSURES CONNECTING THREE

STORIES OR MORE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTION

LOCATIONS.

37. TRANSFER DUCTS IN RATED PARTITIONS SHALL BE INSTALLED WITH FIRE

DAMPERS.

38. THE MECHANICAL CONTRACTOR SHALL FURNISH TO THE GENERAL

CONTRACTOR ALL INFORMATION REQUIRED FOR SETTING OF WALL, ROOF, AND

PARTITION OPENINGS FOR HVAC WORK. THIS INFORMATION SHALL BE

FURNISHED IN A TIMELY MANNER SUCH THAT CONSTRUCTION SCHEDULE IS

NOT JEOPARDIZED.

39. ALL WORK SHALL BE PERFORMED AS PER LANDLORD STANDARDS. THE

HEATING, VENTILATION, AND AIR CONDITIONING CONTRACTOR SHALL COMPLY

WITH ALL LANDLORD STANDARDS AND REQUIREMENTS.

40. EXISTING FIBEROUS DUCT LINERS WHICH ARE CUT DURING RENOVATION

SHALL BE RE-SEALED SO THAT NO FIBEROUS LINER MEDIA IS EXPOSED TO THE

AIRSTREAM.

41. MOST PARTITIONS ARE FULL HEIGHT AND REQUIRE UTILITIES PENETRATIONS

TO BE SEALED. SEE ARCHITECTURAL DRAWINGS FOR PARTITION HEIGHTS.

UTILITIES SHOWN FOR CLARITY THAT MAY RUN PARALLEL TO WALL PARTITIONS

WILL REQUIRE LOCATING IN THE FIELD TO MINIMIZE CONFLICT WITH

PARTITIONS.

42. INFILL ALL NEW OR EXISTING ABANDONED FLOOR SLAB PENETRATIONS WITH

GROUT, FULL THICKNESS OF SLAB. MAINTAIN FIRE RATING.

43. FILL AND PATCH ALL OPENINGS IN WALLS WHERE CONDUITS, PIPES, DUCTS

ETC. ARE OR HAVE BEEN REMOVED WITH UL LISTED FIRE ASSEMBLY

APPROVED BY THE ARCHITECT. MAINTAIN 2-HR FIRE RATING WHERE

APPLICABLE.

44. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CORING NEEDS FOR

PASSAGE OF PIPING THROUGH SOLID CONCRETE WALLS, FLOORS AND ROOFS.

45. EXISTING ROOM THERMOSTATS AND SENSORS SHALL BE PROTECTED DURING

CONSTRUCTION AND RELOCATED AS INDICATED ON THE DRAWINGS.

46. THE MECHANICAL CONTRACTOR SHALL VISIT THE SITE TO DETERMINE ALL PRE-

EXISTING CONDITIONS AND WORK NECESSARY PRIOR TO SUBMISSION OF BID

PRICE.

NEW WORK NOTES:

1. DRAWINGS ARE DIAGRAMMATIC ONLY, FINAL ROUTING OF DUCTWORK, PIPING,

AND EQUIPMENT LOCATIONS SHALL BE DETERMINED IN THE FIELD, ADDITIONAL

OFFSETS, ELBOWS, ECT., SHALL BE PROVIDED AND INSTALLED WITHOUT

ADDITIONAL COST TO THE OWNER. WORK SHALL BE COORDINATED WITH ALL

OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD. EXISTING

STRUCTURAL SYSTEMS SHALL NOT BE MODIFIED WITHOUT THE EXPRESS

PERMISSION OF THE ENGINEER.

2. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR FINAL LOCATIONS

OF DIFFUSERS, REGISTERS, GRILLES, THERMOSTATS, ECT.

3. EQUIPMENT ARRANGEMENT, DUCTWORK SIZES, PENETRATIONS AND DETAILS

ARE BASED ON EQUIPMENT SCHEDULED. CONTRACTOR SHALL ADJUST SIZES

AND ROUTING AS REQUIRED TO ACCOMMODATE ACTUAL EQUIPMENT

INSTALLED.

4. TIE-IN POINT LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL DETERMINE

EXACT LOCATIONS IN THE FIELD BASED ON EXISTING CONDITIONS.

5. ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO

MECHANICAL EQUIPMENT.

6. PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL

ANOTHER SIZE IS SHOWN.

7. SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.

8. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS & GUIDES AS

NECESSARY TO PREVENT UNDUE STRAIN ON PIPING.

9. MINIMUM SIZE OF ALL HVAC PIPING SHALL BE ¾” UNLESS OTHERWISE NOTED.

10. ISOLATION VALVES SHALL BE INSTALLED IN SUPPLY AND RETURN PIPING ON

EACH FLOOR, AT EACH MAIN BRANCH, AND AT EACH BRANCH OR RUN-OUT

SERVING MORE THAN ONE PIECE OF EQUIPMENT.

11. SHUT-OFF VALVES SHALL BE INSTALLED IN THE SUPPLY AND RETURN PIPING

TO ALL EQUIPMENT TO ALLOW FOR SERVICING. UNIONS OR FLANGES SHALL BE

ARRANGED SUCH THAT EQUIPMENT CAN BE SERVICED WITHOUT CUTTING, AND

WITH MINIMAL DISRUPTION OF PIPING SERVING THE EQUIPMENT.

12. SEE DETAILS, PIPING DIAGRAMS AND MANUFACTURER'S

RECOMMENDATIONS FOR ADDITIONAL VALVES & FITTINGS NECESSARY

FOR COMPLETE PIPING SYSTEM.

13. ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK SHALL BE RATED FOR

PRESSURE CLASS OF 2” W.G. UNLESS NOTED OTHERWISE.

14. WHEN SECTION OF DUCTWORK IS NOT LABELED FOR SIZE, THE

LARGER SIZE INDICATED ON THE CONNECTED DUCT SHALL PREVAIL.

SIZE OF DUCT RUN-OUTS TO DIFFUSER SHALL EQUAL DIFFUSER NECK

SIZE.

15. SUPPLY AND RETURN DUCT MAINS FROM AIR HANDLING EQUIPMENT

SHALL BE INTERNALLY LINED AS PER SPECIFICATIONS AND SCHEDULES

A MINIMUM OF 15'-0” FROM THE UNIT UNLESS OTHERWISE NOTED. ALL

DUCTWORK DIMENSIONS INDICATED ARE CLEAR INSIDE DIMENSIONS.

16. VOLUME DAMPERS SHALL BE INSTALLED AT BRANCHES, SPLITS, AND

TAKE-OFFS IN ALL LOW PRESSURE SUPPLY, RETURN, AND EXHAUST

DUCTWORK.

17. IN ADDITION TO THOSE SHOWN ON THE DRAWINGS, PROVIDE VOLUME

DAMPERS DOWN STREAM OF FAN COIL UNITS, AT EACH BRANCH FROM

MAIN DUCTWORK AND DUCT RUN OUTS. PROVIDE OPPOSED BLADE

DAMPERS AT EACH NECK TO AN INDIVIDUAL REGISTER OR DIFFUSER IN

SUPPLY, RETURN AND EXHAUST DUCTS IRRESPECTIVE OF WHETHER

OR NOT A DAMPER IS INDICATED ON THE PLANS. PROVIDE CABLE

OPERATED REMOTE CONTROLLED VOLUME DAMPERS IN BRANCH

DUCTS LOCATED ABOVE INACCESSIBLE CEILINGS. LOCATED CABLE

TERMINATION IN ACCESSIBLE LOCATION ABOVE ACCESSIBLE CEILING.

PROVIDE BLOCKING AS REQUIRED.

18. PROVIDE DUCTWORK WITH OFFSETS AND TRANSITIONS AS REQUIRED

TO FIT UNDER STRUCTURAL ELEMENTS OR OTHER OBSTRUCTIONS.

FLAT OVAL OR ROUND SIZES MAY BE USED INTERCHANGEABLY BY THE

CONTRACTOR. MAINTAIN DUCT CROSS SECTIONAL AREA. CHANGES

SHALL BE ONLY IN ACCORDANCE WITH APPROVED SHOP DRAWINGS

OR WRITTEN PERMISSION OF THE PROJECT ENGINEER.

19. PROVIDE A MINIMUM OF ONE 90 DEGREE ELBOW IN DUCTWORK

UPSTREAM OF EACH REGISTER, GRILLE AND DIFFUSER.

20. DIFFUSER SIZES INDICATED ARE NECK SIZES REGISTERS & GRILLES

ARE INDICATED AS NOMINAL SIZES.

21. CONDENSATE DRAINS SHALL BE SUPPLIED FOR ALL COOLING

EQUIPMENT. CONTRACTOR SHALL ENSURE PROPER INSTALLATION AND

DRAINAGE AS REQUIRED BY FEDERAL, STATE, AND LOCAL CODES.

CONDENSATE PIPING SHALL BE TYPE “L” COPPER.

22. FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN

ON THE SEGMENTS, REFER TO DETAILS, SCHEDULES, AND

SPECIFICATIONS.

23. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S

CERTIFIED DRAWINGS. VERIFY AND PROVIDE DUCT AND/OR PIPE

TRANSITIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND

COORDINATE ALL DIMENSIONS BEFORE FABRICATION.

24. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S

WRITTEN INSTALLATION INSTRUCTIONS, RECOMMENDATIONS AND GOOD

PRACTICE NORMAL TO THE TRADE. ALL EQUIPMENT SHALL BEI INSTALLED

AT A LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH THE

SPECIFICATIONS. INSTALLATION SHALL INCLUDE PROVISIONS FOR

ACCESS TO NORMAL MAINTENANCE ITEMS. PROVIDE ADEQUATE

STRUCTURAL SUPPORTS AND SECURE MOUNTING METHODS WITH

PROVISIONS FOR VIBRATION ISOLATION AND EXPANSION WHERE

REQUIRED.

25. INSTALLATION OF NEW EQUIPMENT SHALL PERMIT ACCESSIBILITY FOR

SERVICE AND/OR REPLACEMENT OF EQUIPMENT PROVIDED. PROVIDE

ACCESS PANELS TO ALLOW ACCESS TO SYSTEMS COMPONENTS THAT

REQUIRE INSPECTION AND MAINTENANCE ACCORDING TO

MANUFACTURER'S LITERATURE.

26. LOCATE EQUIPMENT REQUIRING ACCESS 2'-0” MAXIMUM ABOVE CEILING.

27. MANUFACTURERS NAME & MODEL NUMBER ARE USED FOR DESCRIPTIVE

PURPOSES ONLY & ARE INTENDED TO INDICATE THE STANDARD OF

MATERIAL OR ARTICLES REQUIRED.

28. REFER TO PIPING DRAWINGS FOR THERMOSTAT AND TEMPERATURE

SENSOR LOCATIONS.

TRUE NORTH

Architecture Engineering Design-Build paradigm

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS FOR

CONSTRUCTION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1.877.700.7678 www.smrtinc.com

SMRT Architects and Engineers 200 Brickstone Square, Suite 303

Andover, Massachusetts 01810

200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

FULLY SPRINKLERED

BEDFORD VA MEDICAL CENTER

C :\U se rs

\B ha nn a\

D oc um en ts \2

_V A

Be df or d

W om en s

C lin ic _M

EC

H

_R

_B H an na

L7 W

C 3.

rv t

6/ 9/

1:

:2

AM

M-002

MECHANICAL GENERAL NOTES WOMEN'S CLINIC DESIGN

518-21-103

06/09/2023 MJC BMH

200 SPRINGS ROAD, BEDFORD, MA 01730

Revisions: Date:

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10

11 12

16"x10" 10"x14"

6"Ø

14"x10" 16"x10"

12"x12"12"x12"

16"x6"

24"x8" 24"x8"

6"Ø

12"Ø 12"Ø

6"Ø

10"x12" 16"x10"

14"x10" 16"x10"

14"x10"

10"x14" 16"x10"

8"Ø

16"x10"

8"x6"

8"x6"

"x

6"

12"x6"

12"x6"

REMOVE FAN COIL UNIT AND ALL

CONNECTED DUCTWORK, DIFFUSERS,

GRILLES AND REGISTERS IN THEIR

ENTIRETY. REMOVE ALL ASSOCIATED

CONTROLS IN THEIR ENTIRETY.

(TYPICAL FOR ALL EXISTING FAN COIL

UNITS)

REMOVE FAN COIL UNIT AND ALL

CONNECTED DUCTWORK, DIFFUSERS,

GRILLES AND REGISTERS IN THEIR

ENTIRETY. REMOVE ALL ASSOCIATED

CONTROLS IN THEIR ENTIRETY. (TYPICAL

FOR ALL EXISTING FAN COIL UNITS)

REMOVE FAN COIL UNIT AND ALL

CONNECTED DUCTWORK, DIFFUSERS,

GRILLES AND REGISTERS IN THEIR

ENTIRETY. REMOVE ALL ASSOCIATED

CONTROLS IN THEIR ENTIRETY.

(TYPICAL FOR ALL EXISTING FAN COIL

UNITS)

REMOVE FAN COIL UNIT AND ALL

CONNECTED DUCTWORK, DIFFUSERS,

GRILLES AND REGISTERS IN THEIR

ENTIRETY. REMOVE ALL ASSOCIATED

CONTROLS IN THEIR ENTIRETY. (TYPICAL

FOR ALL EXISTING FAN COIL UNITS)

REMOVE EXISTING OA SUPPLY FAN AND

ALL CONNECTED DUCTWORK, IN IT'S

ENTIRETY. REMOVE ALL ASSOCIATED

FAN CONTROLS IN THEIR ENTIRETY.

REMOVE EXISTING OA SUPPLY FAN AND

ALL CONNECTED DUCTWORK, IN IT'S

ENTIRETY. REMOVE ALL ASSOCIATED

FAN CONTROLS IN THEIR ENTIRETY.

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10

11 12

REMOVE EXISTING

AIR COOLED CHILLER

1 1/2"3"

1/

2"

1/ 2"

1 1/4" 1"

REMOVE EXISTING FAN COIL

UNIT, ASSOCIATED PIPING

AND CONTROLS IN THEIR

ENTIRETY. (TYPICAL FOR

ALL FAN COIL UNITS)

REMOVE EXISTING FAN COIL

UNIT, ASSOCIATED PIPING

AND CONTROLS IN THEIR

ENTIRETY. (TYPICAL FOR ALL

FAN COIL UNITS)

REMOVE EXISTING 1" STEAM

AND 3/4" CONDENSATE PIPING

RISERS SERVING RADIATORS

ON LEVELS ABOVE. (TYPICAL)

REMOVE EXISTING 1" STEAM

AND 3/4" CONDENSATE PIPING

RISERS SERVING RADIATORS

ON LEVELS ABOVE. (TYPICAL)

REMOVE EXISTING HWS/R AND

CHWS/R PIPING MAINS SERVING

FAN COILS IN THEIR ENTIRETY.

(TYPICAL)

(R) ET-

(R) HX-

(R) P-

(R) P-

(R) AS-

1 1/2"

2"

2"

1 1/2"

1/

2"

2"

2"

3/4"

1"1"2"2" 1 1/4"1 1/4"2"2"

1/

4"

1/ 4"

1" 1"

1" 1"

1" 1"

REMOVE ALL RFRIGERATION PIPING

IN MECHANICAL ROOM AND ALL

BURIED PIPING TO OUTDOOR AIR

COOLED CHILLER IN IT'S ENTIRETY.

TRUE NORTH

Architecture Engineering Design-Build paradigm

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS FOR

CONSTRUCTION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1.877.700.7678 www.smrtinc.com

SMRT Architects and Engineers 200 Brickstone Square, Suite 303

Andover, Massachusetts 01810

200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

FULLY SPRINKLERED

BEDFORD VA MEDICAL CENTER

C :\U se rs

\B ha nn a\

D oc um en ts \2

_V A

Be df or d

W om en s

C lin ic _M

EC

H

_R

_B H an na

L7 W

C 3.

rv t

6/ 9/

1:

:0

AM

MD100

HVAC GROUND FLOOR DEMOLITION

PLAN

WOMEN'S CLINIC DESIGN

518-21-103

06/09/2023 MJC BMH

200 SPRINGS ROAD, BEDFORD, MA 01730

1/8" = 1'-0"

HVAC GROUND FLOOR DUCTWORK DEMOLITION PLAN F8

1/8" = 1'-0"

HVAC GROUND FLOOR PIPING DEMOLITION PLAN C8

Revisions: Date:

C

D

E

1 2 3 4 5 6 7 8 9 10

11 12

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10

11 12

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

REMOVE FLOOR MOUNTED

RADIATOR, ASSOCIATED

PIPING AND CONTROLS IN

THEIR ENTIRETY.

TYPICAL OF ALL FLOOR

MOUNTED RADIATORS.

TRUE NORTH

Architecture Engineering Design-Build paradigm

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS FOR

CONSTRUCTION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1.877.700.7678 www.smrtinc.com

SMRT Architects and Engineers 200 Brickstone Square, Suite 303

Andover, Massachusetts 01810

200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

FULLY SPRINKLERED

BEDFORD VA MEDICAL CENTER

C :\U se rs

\B ha nn a\

D oc um en ts \2

_V A

Be df or d

W om en s

C lin ic _M

EC

H

_R

_B H an na

L7 W

C 3.

rv t

6/ 9/

1:

:0

AM

MD101

HVAC FIRST AND SECOND FLOOR

DEMOLITION PLANS

WOMEN'S CLINIC DESIGN

518-21-103

06/09/2023 MJC BMH

200 SPRINGS ROAD, BEDFORD, MA 01730

1/8" = 1'-0"

HVAC FIRST FLOOR DEMOLITION PLAN F8

1/8" = 1'-0"

HVAC SECOND FLOOR DEMOLITION PLAN C8

Revisions: Date:

C

D

E

1 2 3 4 5 6 7 8 9 10

11 12

CH-1 CH-2

PROGRAM

ASSISTANT &

ADMIN

WORKSTATION

B19

ELEVATOR

LOBBY

B21A

ELEVATOR

MACHINE

ROOM

B02

BENEFITS

ADVISOR

B04

TOILET

B09

HOUSEKEEPING

B10

VACANT

SPACE

B11

RESIDENCY

PROGRAM

DIRECTOR

B12A

RESEARCH

ASSISTANT

B12

LOUNGE

B13LOCKER

B14

TOILET

B15

TOILET

B14A

AC-1

UH-1

HWP-2

HWP-1

HX-1

BT-1

SG-1

3" HPS TO NEW PRV

STATION ON WALL

NEW ELECTRIC

CONDENSATE

PUMPS CP-1 & CP-2

IN EXISTING PIT

AS-2

AS-1

BUILDING

SUPPORT

B08

ET-2

ET-1

CHWP-1

CHWP-2

SHOT FEEDER

COUPON RACK

VFD (CHWP-3)

VFD (CHWP-4)

DOAS-1

VOLUNTEERS

B03

4" CHWR

4" CHWR

4" CHWS

FCU-7

FCU-2FCU-1

FCU-4

FCU-3

FCU-9

FCU-8

CHWP-4

CHWP-3

2" LPS 2" LPS

2" C

HW

S

1" HWS/R UP

1-1/2" CHWS/R UP

HEAT TRACED AND INSULATED

DIRECT BURIED CHWS & CHWR

PIPING

4" C

HW

R

4" C

HW

S

CU-1 CU-2 CU-4

AC-3

CU-5 CU-3

PATIENT

ADVOCATE

B17

PROGRAM

MANAGER

B18

?CUH-1 FCU-5

FCU-6

CUH-2 AC-2

2 1/2" CHWR

1 1/4" HWS

1 1/4" HWR

2 1/2" CHWS

T T

T

T

T

T

T

T

T

T T

T

T T T

1-1/2" CHWS/R UP

1" HWS/R UP

1" HWS/R UP

1-1/2" CHWS/R UP

1-1/2" CHWS/R UP

1" HWS/R UP

2" C

HW

R

4" CHWR

4" CHWS

3" CHWR

1 1/2" CHWR

1 1/2" HWS

1 1/2" HWR

3" CHWS

3" CHWR

2" HWS

2 1/2" CHWR

1 1/2" HWS 1 1/2" HWR

2 1/2" CHWS

1" HWR

1 1/2" CHWS

1" HWS

1 1/2" CHWR

3/4" HWS

1" CHWS

1" CHWR

3/4" HWR

RO-1

(RE: DIV. 22)

(E) 1-1/4"

VENT UP

STAIR 1

B16

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10

11 12

BENEFITS

ADVISOR

B04

BUILDING

SUPPORT

B08ELEVATOR

MACHINE

ROOM

B02

PROGRAM

ASSISTANT &

ADMIN

WORKSTATION

B19

TOILET

B15

TOILET

B14A

LOCKER

B14

LOUNGE

B13 RESEARCH

ASSISTANT

B12

RESIDENCY

PROGRAM

DIRECTOR

B12A

VACANT

SPACE

B11

HOUSEKEEPING

B10 TOILET

B09

ELEVATOR

LOBBY

B21A

24"x12" OA 40"x12" OA

"x

" O

A 26"x14" OA

24"x10" EA

VOLUNTEERS

B03

AC-1

FCU-3

FCU-2

DOAS-1

FCU-1

FCU-4

FCU-5

FCU-7

FCU-8

FCU-9

SD

SD

SD

ELECTRIC

B06

BUILDING

SUPPORT

B07

L-1

EF-1

IT/DATA

B05

PROGRAM

MANAGER

B18

PATIENT

ADVOCATE

B17

STORAGE

CLOSET

B01

CORRIDOR

B21

CORRIDOR

B00

FCU-6

CU-1 CU-2 CU-4

AC-2

AC-3

CU-5 CU-3

1 1

S-3

4 E-1

R-1

R-1

"x

" E

A

144"W x 48"H x 16"D

EXHAUST AIR PLENUM

CUH-1

STAIR 1

B16

L-2 L-2

CUH-2

9 108"Ø EA

40"x18" OA

1 1

S-2

S-2

24"x8" EA

18"x8" EA

18"x6" EA

14"x8" EA

12"x8" EA

8"x8" EA

18"x10" OA16"x10" OA

38"x20" OA UP

HVAC PIPING NOTES:

1. SEE SHEET M-001 AND M-002 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO FCU SCHEDULE FOR PIPING RUN OUT SIZES.

3. PROVIDE ISOLATION VALVES FOR ALL HWS AND HWR RUNNOUTS TO EVERY INDIVIDUAL EQUIPMENT AND/OR DEVICE. VALVES SHALL BE LOCATED AT THE TOP-OF-DROPS IN AN ACCESSIBLE LOCATION WITH THE CEILING

GRID MARKED FOR MAINTENANCE.

4. PROVIDE SERVICE VALVES FOR ALL HWS AND HWR MAINS AND BRANCH RUNNOUTS. LOCATE VALVES AT ALL FIRE/SMOKE PARTITIONS, BRANCH LOCATIONS AND RISERS. VALVES SHALL BE LOCATED IN AN ACCESSIBLE

LOCATION WITH THE CEILING GRID MARKED FOR…

This is the start of the file's text. The full file is on GovTribe.