518-21-103 Contracting and VA RFIs.docx

DOCX document 16 KB Posted

Attached to
Z1DA--518-21-103 Women's Health 3 floors Construction Presolicitation Notice
Solicitation number
36C24123B0002
Issued by

About this file

This document contains questions and answers regarding Request for Information number 518-21-103 for the construction of three floors for a Women's Health facility. The solicitation is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. Key details include that drawings will be provided in Amendment 2, the awarded contractor will receive tax exempt information after contract award, drawing number AE700 is included in the attachments of Amendment 5, and all RFI responses will be provided in an amendment. Additionally, the specification requiring inclusion of engineering costs in the proposal is not mandatory for this project. No other salient information is included regarding required products or services.

View the file

Other files

File Type Posted
36C24123B0002 0011.docx DOCX document
Bedford Womens Health Construction RFIs 07262023.docx DOCX document
36C24123B0002 0010.docx DOCX document
518-21-103 Site Visit Sign-In Sheet.pdf PDF
List of Attachments.pdf PDF
36C24123B0002 0009.pdf PDF
Plumbing-21053.pdf PDF
branches_productsheet.pdf PDF
FP-20153.pdf PDF
Interiors-21053.pdf PDF
087100.pdf PDF
375-Ultra-Durable-Guide-Specifications-2109861.pdf PDF
090600 SCHEDULE FOR FINISHES.pdf PDF
081710.pdf PDF
Architectural-21053.pdf PDF
085113.pdf PDF
Structural-21053.pdf PDF
Civil-20153.pdf PDF
Mechanical-21053.pdf PDF
Electrical-21053.pdf PDF
General-21053.pdf PDF
074624.pdf PDF
375Info sheet.pdf PDF
518-21-103 012 HA102.pdf PDF
518-21-103 Bedford Womens Clinic RFIs (COMPILED).docx DOCX document
36C24123B0002 0008.docx DOCX document
518-21-103 012 HA101.pdf PDF
028211_Bedford VAMC Bldg 12.pdf PDF
02833313_Bedford VAMC Bldg 12.pdf PDF
36C24123B0002 0007.docx DOCX document
36C24123B0002 0006.docx DOCX document
36C24123B0002 0005.docx DOCX document
36C24123B0002 0004.docx DOCX document
100 - Interior.pdf PDF
36C24123B0002 0003.docx DOCX document
36C24123B0002 0002.docx DOCX document
36C24123B0002_2.docx DOCX document
36C24123B0002 0001.docx DOCX document
Full Set Drawings.pdf PDF
36C24123B0002_1.docx DOCX document
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.pdf PDF
S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf PDF
General Decision MA20230001 03032023.pdf PDF
SOW 518-21-103 Womens Health Construction.pdf PDF
Asbestos Documents.pdf PDF
100 Percent Specifications.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

518-21-103 Women’s Health Construction RFIs Contracting

1. Will drawings be sent out?

Please see attached drawings in amendment

2. Will contracting be providing the awarded contractor a tax exemption certificate for materials and equipment being installed on this project?

Awardee will be provided with tax exempt information after contract award

3. Is this tax exempt?

Awardee will be provided with tax exempt information after contract award

4. Can you please provide drawing number AE700 Please see attachments in amendment

5. I assume you will be answering all RFI’s in an amendment. Am I correct? I would also like a list of pre-bid attendees if available.

RFI’s will be answered in an amendment

6. Will project info be uploaded to the VA portal?

An amendment will be posted to contract opportunities

7. Is this a Design Build?

No

8. Can you please provide current elevator system?

No standardization.

9. At this time we are requesting that the performance period be lengthened to 18 months due to equipment procurement.

No extension.

10. Can the superintendent also act as the CQC Manager and the SSHO?

Yes

11. Specification 01 45 00 paragraph 3.4.C states, “ In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist in the CQC System Manager for the following areas, as applicable: electrical, mechanical, civil, structural, environmental, architectural, materials technician submittals clerk, Commissioning Agent/LEED specialist, and low voltage systems. These individuals or specified technical companies are directly employed by the General Contractor and cannot be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager; be physically present at the construction site during work on the specialized personnel’s areas of responsibility; have the necessary education or experience in accordance with the Experience Matrix listed herein.” Is the contractor required to include the cost for engineers and architect as stated (Architect, Civil Engineer, Mechanical Engineer, Electrical Engineer, Environmental Engineer and Structural Engineer as stated? This will add a large cost to the project. Please clarify this specification and if it is actually required.

This specification is not required.