This notice provides details for a solicitation by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The solicitation, numbered 36C24123B0002, is for construction services to build three floors of women's health facilities. Interested parties should refer to the attached architectural plans PDF file for additional specifications. The opportunity is designated as a solicitation and is seeking responses for the construction of new women's health floors at a VA medical center within VISN 1. The agency point of contact and response deadline are not provided in this presolicitation notice.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DEMOLITION NOTES:
1. COORDINATE EXTENT OF DEMOLITION WITH
LOCATIONS OF PARTITIONS DESCRIBED ON PLANS
AND WITH LOCATIONS OF FINISHES NOTED AS
EXISTING TO REMAIN.
2. ANY WALL, PARTITION OR SURFACE DISTURBED
BECAUSE OF NEW WORK OR DEMOLITION SHALL BE
PATCHED AND FINISHED CONTINUOUSLY TO THE
NEAREST CORNER UNLESS NOTED OTHERWISE,
MATCH EXISTING ADJACENT CONSTRUCTION
FINISHES, CONTINUITY AND FIRE RATINGS UNLESS
NOTED OTHERWISE.
3. PROTECT ALL FINISHES, MATERIALS AND EQUIPMENT
NOTED AS EXISTING TO REMAIN. CONTRACTOR SHALL
BE RESPONSIBLE TO REPLACE ALL FINISHES,
MATERIALS AND EQUIPMENT DAMAGED DURING
CONSTRUCTION.
4. DIMENSIONS INDICATED WITH A ± ARE EXISTING
CONDITION AND NEED TO BE VERIFIED IN FIELD.
5. CONTRACTOR TO HOLD A PRE-DEMOLITION MEETING
WITH OWNER, CONSTRUCTION MANAGER, SUB
CONTRACTORS, ETC. PRIOR TO BEGINNING
DEMOLITION WORK TO REVIEW HOSPITALS POLICIES,
NOISE CONTROL MEASURES, ETC.
6. CLEARLY INDENTIFY AND TAG MECHANICAL,
PLUMBING AND ELECTRICAL FIXTURES OR EQUIPMENT
THAT ARE STILL IN USE PRIOR TO DEMOLITION TO
AVOID ACCIDENTAL REMOVAL.
7. SEE MECHANICAL, ELECTRICAL AND PLUMBING
DRAWINGS FOR THE SCOPE OF DEMOLITION IN THOSE
DISCIPLINES.
HAZARDOUS MATERIALS
GENERAL NOTE:
HAZARDOUS MATERIALS MAY BE PRESENT THROUGHOUT
THE BUILDING AND SITE. REFERENCE HAZARDOUS
MATERIALS SURVEY AND ASSOIATED SPECIFICATIONS AND
DRAWINGS FOR ADDITIONAL INFORMATION.
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
3 4 111111
3 43 43 43 43 43 43 43 43 43 43 43 43 4
1 1
1 1 1 3 43 4
3 43 4
3 4
2222222222222
222222 2 2
INFILL OPENINGS IN
FLOOR SLAB TO
PROVIDE CODE
COMPLIANT
SEPARATION BETWEEN
FLOORS.
1 8 7 7
22 2 2
14 14 14 14 14 14
14 14
14 14 14 14 14 14
141414141414141414141414
3 4
3 43 43 4 1 1 1 1 1 1
11111
1313 13
13131313
13131313
1313 13 13 13 13 13 13 13
REMOVE STAIR, RAILS, SLAB
AND RETAINING WALL
REMOVE STAIR, RAILS, SLAB
AND RETAINING WALL
REMOVE STAIR, RAILS, SLAB
AND RETAINING WALL
1_
TRENCHED AREA
TRENCH LEGEND:
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:0
AM
AD100
GROUND FLOOR DEMOLITION PLAN WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
SCALE: 1/8" = 1'-0"F2 GROUND FLOOR DEMOLITION PLAN
DEMOLITION KEYNOTES LEGEND
KEYNOTE DESCRIPTION
1 REMOVE EXISTING WALL FROM FLOOR TO
STRUCTURE ABOVE.
2 REMOVE EXISTING DOOR AND FRAME ASSEMBLY
COMPLETE.
3 REMOVE EXISTING CEILING AND ALL ASSOCIATED
MECHANICAL, ELECTRICAL, AND PLUMBING
FIXTURES. COORDINATE WITH MEP DISCIPLINES
FOR EXTENT OF WORK.
4 REMOVE EXISTING FLOORING AND ASSOCIATED
ACCESSORIES TO STRUCTURE/SUBFLOOR BELOW.
5 REMOVE EXISTING STAIR AND ASSEMBLY
COMPLETE.
6 REMOVE EXISTING CHIMNEY COMPLETE. INFILL
SLAB PENETRATIONS AS NEEDED TO MAINTAIN
FLOOR RATING.
7 REMOVE EXISTING WINDOW COMPLETE
INCLUDING FRAME, SILL, AND CAST STONE.
8 REMOVE DASHED PORTION OF WALL FOR NEW
DOOR.
9 REMOVE EXISTING DECORATIVE COLUMNS.
10 REMOVE RAILINGS COMPLETE.
11 REMOVE EXISTING CONCRETE SLAB FOR NEW
STAIRS TO THE GROUND LEVEL.
12 REMOVE EXISTING PORCH STRUCTURE FROM 1ST
FLOOR SLAB TO ROOF.
13 REMOVE EXTERIOR WALL FINISHES BACK TO
STRUCTURE AND PREP FOR NEW SPRAY FOAM
INSULATION
14 REMOVE WINDOW, FRAME, AND SILL. MAINTAIN
EXTERIOR CAST STONE SILL
15 SAWCUT SLAB FOR NEW PLUMBING WORK.
CONTRACTOR TO USE GROUND PENETRATING
RADAR PRIOR TO TRENCHING FOR VERIFICATION
OF EXISTING MAIN. COORDINATE EXTEND OF
CUTTING WITH PLUMBING.
16 REMOVE AREA OF EXISTING ASPHALT PAVING AS
NEEDED TO ALLOW FOR PROPOSE
CONSTRUCTION
Revisions: Date:
ADDENDUM 1 JUNE 9, 2023
UP
UP
UP
UP
DEMOLITION NOTES:
1. COORDINATE EXTENT OF DEMOLITION WITH
LOCATIONS OF PARTITIONS DESCRIBED ON PLANS
AND WITH LOCATIONS OF FINISHES NOTED AS
EXISTING TO REMAIN.
2. ANY WALL, PARTITION OR SURFACE DISTURBED
BECAUSE OF NEW WORK OR DEMOLITION SHALL BE
PATCHED AND FINISHED CONTINUOUSLY TO THE
NEAREST CORNER UNLESS NOTED OTHERWISE,
MATCH EXISTING ADJACENT CONSTRUCTION
FINISHES, CONTINUITY AND FIRE RATINGS UNLESS
NOTED OTHERWISE.
3. PROTECT ALL FINISHES, MATERIALS AND EQUIPMENT
NOTED AS EXISTING TO REMAIN. CONTRACTOR SHALL
BE RESPONSIBLE TO REPLACE ALL FINISHES,
MATERIALS AND EQUIPMENT DAMAGED DURING
CONSTRUCTION.
4. DIMENSIONS INDICATED WITH A ± ARE EXISTING
CONDITION AND NEED TO BE VERIFIED IN FIELD.
5. CONTRACTOR TO HOLD A PRE-DEMOLITION MEETING
WITH OWNER, CONSTRUCTION MANAGER, SUB
CONTRACTORS, ETC. PRIOR TO BEGINNING
DEMOLITION WORK TO REVIEW HOSPITALS POLICIES,
NOISE CONTROL MEASURES, ETC.
6. CLEARLY INDENTIFY AND TAG MECHANICAL,
PLUMBING AND ELECTRICAL FIXTURES OR EQUIPMENT
THAT ARE STILL IN USE PRIOR TO DEMOLITION TO
AVOID ACCIDENTAL REMOVAL.
7. SEE MECHANICAL, ELECTRICAL AND PLUMBING
DRAWINGS FOR THE SCOPE OF DEMOLITION IN THOSE
DISCIPLINES.
HAZARDOUS MATERIALS
GENERAL NOTE:
HAZARDOUS MATERIALS MAY BE PRESENT THROUGHOUT
THE BUILDING AND SITE. REFERENCE HAZARDOUS
MATERIALS SURVEY AND ASSOIATED SPECIFICATIONS AND
DRAWINGS FOR ADDITIONAL INFORMATION.
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
11 12
1/
2"
9"
3 4
3 4
3 4
3 4
3 4
2 2 2
2 2
2 2 2
2 2
2 2 22
2 22
3 4
3 4 3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4 3 4
3 4
9 10
9 10 9
7 78
14 14 14 14 14 14 14 14 14 14 14 14 14
141414141414
141414141414
1313 13
3 43 43 4 1 1
1 1 1 1 1 1
11111
13 13 13 13 13 13 13 13 13
13131313131313131313
TRENCHED AREA
TRENCH LEGEND:
LEVEL 1
175' - 0"
LEVEL 2
186' - 0"
5 6
REMOVE & MODIFY EXISTING WD
COLUMNS & PILASTERS TO ALLOW FOR
REINSTALLATION. CUT COLUMN TO SIZE
AND REPLACE BASE AS NEEDED TO
MATCH EXISTING. TYPICAL FOR ALL
COLUMNS AND PEIRS IN THIS AREA.
REPLACE MASONRY AND CONCRETE
ENTRY STEPS, AND ADD AN ACCESSIBLE
RAMP. REFER TO THE SITE PLAN FOR
RAMP EXTENTS. REPLACE STAIR RAILINGS
AND GUARDRAILS WITH RAILINGS AND
GUARDRAILS THAT MEET ACCESSIBILITY
REQUIREMENTS.
REMOVE DOOR & REPLACE IN KIND W/
BLAST RESISTANT. BORROWED LITES,
TRIM AND CLERESTORY WINDOW TO
REMAIN, CONTRACTOR TO PROVIDE
SECURITY FILM ON EXISTING GLAZING.
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
10' - 2"
3 4
3 4
3 4
3 4
3 4
2 2 2
2 2
2 2 2
2 2
2 2 22
2 22
3 4
3 4 3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
3 4
7 78
129 9
129 9
12 99
12 99
14 14 14 14 14 14
14 14 14
14 14 14 14 14 14
14141414141414141414141414
1313 13
13131313
13 13131313
3 43 43 4 1 1
1 1
1 1 1
11111
13 13 13 13 13 13 13 13 13
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:1
AM
AD101
FIRST AND SECOND FLOOR
DEMOLITION PLANS
WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
SCALE: 1/8" = 1'-0"F1 FIRST FLOOR DEMOLITION PLAN
DEMOLITION KEYNOTES LEGEND
KEYNOTE DESCRIPTION
1 REMOVE EXISTING WALL FROM FLOOR TO
STRUCTURE ABOVE.
2 REMOVE EXISTING DOOR AND FRAME ASSEMBLY
COMPLETE.
3 REMOVE EXISTING CEILING AND ALL ASSOCIATED
MECHANICAL, ELECTRICAL, AND PLUMBING
FIXTURES. COORDINATE WITH MEP DISCIPLINES
FOR EXTENT OF WORK.
4 REMOVE EXISTING FLOORING AND ASSOCIATED
ACCESSORIES TO STRUCTURE/SUBFLOOR BELOW.
5 REMOVE EXISTING STAIR AND ASSEMBLY
COMPLETE.
6 REMOVE EXISTING CHIMNEY COMPLETE. INFILL
SLAB PENETRATIONS AS NEEDED TO MAINTAIN
FLOOR RATING.
7 REMOVE EXISTING WINDOW COMPLETE
INCLUDING FRAME, SILL, AND CAST STONE.
8 REMOVE DASHED PORTION OF WALL FOR NEW
DOOR.
9 REMOVE EXISTING DECORATIVE COLUMNS.
10 REMOVE RAILINGS COMPLETE.
11 REMOVE EXISTING CONCRETE SLAB FOR NEW
STAIRS TO THE GROUND LEVEL.
12 REMOVE EXISTING PORCH STRUCTURE FROM 1ST
FLOOR SLAB TO ROOF.
13 REMOVE EXTERIOR WALL FINISHES BACK TO
STRUCTURE AND PREP FOR NEW SPRAY FOAM
INSULATION
14 REMOVE WINDOW, FRAME, AND SILL. MAINTAIN
EXTERIOR CAST STONE SILL
15 SAWCUT SLAB FOR NEW PLUMBING WORK.
CONTRACTOR TO USE GROUND PENETRATING
RADAR PRIOR TO TRENCHING FOR VERIFICATION
OF EXISTING MAIN. COORDINATE EXTEND OF
CUTTING WITH PLUMBING.
16 REMOVE AREA OF EXISTING ASPHALT PAVING AS
NEEDED TO ALLOW FOR PROPOSE
CONSTRUCTION
SCALE: 1/8" = 1'-0"F9 SOUTH ELEVATION - DEMOLITION
SCALE: 1/8" = 1'-0"C1 SECOND FLOOR DEMOLITION PLAN
OC OC OC OC
OC OC
OC
NL/EM NL/EM NL/EM NL/EM
OCOC
OC
OC OC
OC
NL/EM NL/EM NL/EM
NL/EM
NL/EM
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
11 12
AE201
F5
PROGRAM
ASSISTANT &
ADMIN
WORKSTATION
B19
PROGRAM
MANAGER
B18
PATIENT
ADVOCATE
B17
VOLUNTEERS
B03
ELEVATOR
MACHINE
ROOM
B02
BUILDING
SUPPORT
B08
TOILET
B09
HOUSEKEEPING
B10
BENEFITS
ADVISOR
B04
RESEARCH
ASSISTANT
B12
TOILET
B15
CORRIDOR
B00
RESIDENCY
PROGRAM
DIRECTOR
B12A
LOUNGE
B13
TOILET
B14A
LOCKER
B14 VACANT
SPACE
B11
AE201
B2
ELEVATOR
LOBBY
B21A
BUILDING
SUPPORT
B07
ELECTRIC
B06
IT/DATA
B05
STORAGE
CLOSET
B01
CORRIDOR
B21
AE100 D1
STAIR 1
B16
UP
UP
UP
UP
AD101
F9
ELEV.
E01
AE
0A
AE
0B
MULTI-PURPOSE/
CONFERENCE/YOGA
B20
ADDITION EXISTING EXISTING ADDITION
PROVIDE SPRAY ON
WATERPROOFING MEMBRANE @
EXISTING BELOW GRADE BRICK
FOUNDATION WALL & FOOTING
DRAIN. COORDINATE W/ SITE CIVIL
DRAWINGS
PROVIDE SPRAY ON
WATERPROOFING MEMBRANE @
EXISTING BELOW GRADE BRICK
FOUNDATION WALL & FOOTING
DRAIN. COORDINATE W/ SITE CIVIL
DRAWINGS
AE100
F1
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
11 12
EXPOSED TO
STRUCTURE
ABOVE
133 SF
PROGRAM
ASSISTANT &
ADMIN
WORKSTATION
B19123 SF
PROGRAM
MANAGER
B18
144 SF
PATIENT
ADVOCATE
B17
84 SF
VOLUNTEERS
B03
52 SF
ELEVATOR
MACHINE
ROOM
B02
979 SF
BUILDING
SUPPORT
B08
102 SF
TOILET
B09
42 SF
HOUSEKEEPING
B10
58 SF
RESEARCH
ASSISTANT
B12
58 SF
TOILET
B15
386 SF
CORRIDOR
B00
97 SF
RESIDENCY
PROGRAM
DIRECTOR
B12A
129 SF
LOUNGE
B13
55 SF
TOILET
B14A
108 SF
LOCKER
B14
693 SF
VACANT
SPACE
B11
96 SF
ELEVATOR
LOBBY
B21A 455 SF
BUILDING
SUPPORT
B07
102 SF
BENEFITS
ADVISOR
B04
119 SF
IT/DATA
B05
209 SF
ELECTRIC
B06
27 SF
STORAGE
CLOSET
B01
CONSTRUCT AND SEAL WALL
TIGHT TO PERIMETER OF DUCT
RISER ABOVE, TYP.
446 SF
STAIR 1
B16
433 SF
MULTI-PURPOSE/
CONFERENCE/YOGA
B20
79 SF
ELEV.
E01
382 SF
CORRIDOR
B21
382 SF
CORRIDOR
B21
8' - 0"
7' - 9"
FLOOR PLAN NOTES:
1. SEE GI002 FOR GENERAL PROJECT NOTES, LEGENDS
AND ABBREVIATIONS.
2. SEE GI003 FOR GENERAL MOUNTING HEIGHTS, TOP OF
WALL DETAILS AND PARTITION TYPES.
3. CONTRACTOR IS RESPONSIBLE FOR REVIEWING CODE
COMPLIANCE PLANS AND NOTIFYING THE ARCHITECT OF
CONFLICTS BETWEEN WHAT IS IN THE FIELD AND ON
THE CODE DOCUMENTS.
4. DIMENSIONS ARE FACE OF CONCRETE, FACE OF
MASONRY AND CENTERLINE OF STUD, UNLESS NOTED
OTHERWISE.
5. DOOR JAMBS (HINGE SIDE) SHALL BE 6" FROM CORNER
IN STUD PARTITIONS AND 8" FROM CORNER IN MASONRY
PARTITIONS UNLESS NOTED OTHERWISE.
6. REFER TO DETAILS FOR ADDITIONAL DIMENSIONING
INFORMATION.
7. REFER TO ENLARGED PLANS FOR PARTITION TYPES AND
DIMENSIONS IN AREAS WHICH ARE DETAILED AT A
LARGER SCALE.
8. FURNITURE AND OWNER PROVIDED EQUIPMENT ARE
INDICATED BY DASHED LINE TYPE.
9. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION
OF OWNER PROVIDED EQUIPMENT INCLUDING BUT NOT
LIMITED TO DIMENSIONAL INFORMATION, AND
MECHANICAL, ELECTRICAL AND PLUMBING
REQUIREMENTS.
10. CENTER FLOOR DRAINS IN SPACE UNLESS INDICATED
OTHERWISE.
INFILLED AREA
PLAN LEGEND:
EXISTING WALL/PARTITION/COLUMN
NEW WALL/PARTITION
VACANT SPACE
CEILING NOTES:
1. SEE GI001 FOR GENERAL PROJECT NOTES.
2. SEE FINISH SCHEDULE FOR CEILING AND CEILING GRID
TYPES.
3. EXCEPT WHERE INDICATED, CENTER CEILING GRIDS IN
ROOMS. USE HALF TILES OF GREATER @ PERIMETERS
WHEN POSSIBLE.
4. ALIGN CEILING ITEMS AS SHOWN, WITH COMMON
CENTERLINES TYPICALLY. CENTER ITEMS IN CEILING, OR
IN AREAS UNLESS INDICATED OTHERWISE.
5. WHERE TEGULAR OR BEVELED TILE IS USED, PAINT ALL
CUT EDGES TO MATCH.
6. CAULK JOINT BETWEEN CEILING GRID (WALL ANGLE)
AND WALL WHERE GAPS ARE LARGER THAN 1/8" OR
GREATER.
7. PROVIDE ACCESS PANELS AS REQUIRED IN GWB
CEILINGS FOR ACCESS AS REQUIRED BY ALL TRADES.
8. FIRE SPRINKLERS SHALL BE CENTERED IN CEILING TILE
OR HALF TILE AS SHOWN. FIRE SPRINKLERS SHALL BE
LOCATED IN ALIGNMENT WITH OTHER CEILING ITEMS
AND SHALL BE PLACED IN COORDINATION WITH LIGHT
FIXTURE POSITIONS INDICATED, TYPICAL.
9. FIRE SPRINKLERS ARE SHOWN FOR COORDINATION
PURPOSES ONLY. ADDITIONAL SPRINKLER HEADS MAY
BE REQUIRED FOR CODE COMPLIANCE, AS DETERMINED
BY THE FIRE PROTECTION DESIGNER. SPRINKLERS ARE
NOT SHOWN IN ALL AREAS WHERE REQUIRED. FIRE
PROTECTION CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING A COMPLETE AND FULLY CODE
COMPLIANT SYSTEM, INCLUDING HEADS NOT INDICATED
IN THIS DRAWING. SIDEWALL MOUNT SPRINKLER HEADS
UNDER BALCONIES ARE NOT SHOWN IN THE CEILING
PLANS.
10. SEE MECHANICAL, ELECTRICAL AND PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
11. WHERE ARCHITECTURAL DRAWINGS DEPICT
MECHANICAL OR ELECTRICAL ITEMS OR EQUIPMENT
(LIGHTS, DIFFUSERS, ETC.) INSTALLATION OF SUCH
ITEMS SHALL BE COORDINATED WITH EACH RESPECTIVE
TRADE SUB-CONTRACTOR.
12. WHERE DRAWINGS DO NOT ACCESS INSTALLATION
METHODOLOGY, THE CONTRACTOR SHALL BE BOUND
TO PERFORM IN STRICT COMPLIANCE WITH THE
MANUFACTURER'S SPECIFICATIONS, AND STANDARD
INDUSTRY STANDARDS.
13. CONTRACTOR TO COORDINATE ANY BLOCKING OR
STRUCTURAL SUPPORT ABOVE THE CEILING FOR
OWNER PROVIDED EQUIPMENT.
SUPPLY DIFFUSER
RETURN DIFFUSER
EXHAUST DIFFUSER
LINEAR DIFFUSER
GWB CEILING
DOWN LIGHT
2x2 LIGHT FIXTURE
2x2 CEILING TILE AND GRID (ACT-1)
CEILING LEGEND:
2x2 LIGHT FIXTURE (EMERG.)
UTILITY LIGHT FIXTURE
UTILITY LIGHT FIXTURE (EMERG.)
EMERGENCY EXIT SIGN
OCCUPANCY SENSOROC
R
WALL SCONCE
LINEAR WALL LIGHT
EXTERIOR WALL SCONCE
ACCESS CONTROL, RE: ELEC.
KEYED NOTES:
REFRIGERATOR
MICROWAVE OVEN
COFFEE MAKER
SOAP DISPENSER
PAPER TOWEL DISPENSER
2'
- 6
2'
- 0
3'
- 0
4' - 0" 4' - 0"
4' - 0" 2' - 0" 2' - 0"
B
F1a
CGCG
CGCG
F1a
F1a
F1a
S3a
S3a
NOTE: ADJACENT/CONNECTING PARTITION LAYOUT/TYPE WILL VARY
BY LOCATION. REFER TO OVERALL AND ENLARGED FLOOR PLANS.
EXISTING COLUMN TO REMAIN
PROVIDE CORNER GUARDS
AT ALL EXTERIOR CORNERS
OF COLUMN FURRING
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:1
AM
AE100
OVERALL GROUND FLOOR PLANS WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
SCALE: 1/8" = 1'-0"F3 OVERALL GROUND FLOOR PLAN
SCALE: 1/8" = 1'-0"C3 GROUND FLOOR REFLECTED CEILING PLAN
Revisions: Date:
ADDENDUM 1 JUNE 9, 2023
SEE STRUCTURAL DRAWINGS FOR STAIR/SLOPED
WALKWAY FOOTINGS AND FOUNDATIONS
GROUND FLOOR (BASEMENT) CEILING SCHEDULE
# Name Ceiling Finish Ceiling Height Comments
B00 CORRIDOR ACT-1/GWB 8'-0" SEE PLAN FOR GWB SOFFIT/BULKHEAD LOCATIONS
B01 STORAGE CLOSET ACT-1 8'-0"
B02 ELEVATOR MACHINE ROOM EXPOSED VARIES
B03 VOLUNTEERS ACT-1 7'-8"
B04 BENEFITS ADVISOR ACT-1 7'-8"
B05 IT/DATA EXPOSED VARIES
B06 ELECTRIC EXPOSED VARIES
B07 BUILDING SUPPORT EXPOSED 9'-6"
B08 BUILDING SUPPORT EXPOSED VARIES
B09 TOILET ACT-1 7'-8"
B10 HOUSEKEEPING ACT-1 7'-8"
B11 VACANT SPACE ACT-1 8'-0"
B12 RESEARCH ASSISTANT ACT-1 7'-8"
B12A RESIDENCY PROGRAM
DIRECTOR
ACT-1 7'-8"
B13 LOUNGE ACT-1 7'-8"
B14 LOCKER ACT-1 7'-8"
B14A TOILET ACT-1 7'-8"
B15 TOILET ACT-1 7'-8"
B16 STAIR 1 ACT-1/GWB 8'-0" SEE PLAN FOR GWB SOFFIT/BULKHEAD LOCATIONS
B17 PATIENT ADVOCATE ACT-1 7'-8"
B18 PROGRAM MANAGER ACT-1 7'-8"
B19 PROGRAM ASSISTANT &
ADMIN WORKSTATION
ACT-1 7'-8"
B20 MULTI-PURPOSE/
CONFERENCE/YOGA
ACT-1 7'-8"
B21 CORRIDOR ACT-1/GWB 7'-10" SEE PLAN FOR GWB SOFFIT/BULKHEAD LOCATIONS
B21A ELEVATOR LOBBY ACT-1 7'-10"
E01 ELEV. ACT-1 8'-0" COORDINATE WITH ELEVATOR MANUFACTURER
LIGHTING FIXTURES SHOWN FOR
REFERENCE ONLY. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
SCALE: 1/4" = 1'-0"D1 INTERIOR ELEVATION - LOUNGE B13
SCALE: 1 1/2" = 1'-0"F1 TYPICAL COLUMN FURR-OUT DETAIL
FLOOR PLAN NOTES:
1. SEE GI002 FOR GENERAL PROJECT NOTES, LEGENDS
AND ABBREVIATIONS.
2. SEE GI003 FOR GENERAL MOUNTING HEIGHTS, TOP OF
WALL DETAILS AND PARTITION TYPES.
3. CONTRACTOR IS RESPONSIBLE FOR REVIEWING CODE
COMPLIANCE PLANS AND NOTIFYING THE ARCHITECT OF
CONFLICTS BETWEEN WHAT IS IN THE FIELD AND ON
THE CODE DOCUMENTS.
4. DIMENSIONS ARE FACE OF CONCRETE, FACE OF
MASONRY AND CENTERLINE OF STUD, UNLESS NOTED
OTHERWISE.
5. DOOR JAMBS (HINGE SIDE) SHALL BE 6" FROM CORNER
IN STUD PARTITIONS AND 8" FROM CORNER IN MASONRY
PARTITIONS UNLESS NOTED OTHERWISE.
6. REFER TO DETAILS FOR ADDITIONAL DIMENSIONING
INFORMATION.
7. REFER TO ENLARGED PLANS FOR PARTITION TYPES AND
DIMENSIONS IN AREAS WHICH ARE DETAILED AT A
LARGER SCALE.
8. FURNITURE AND OWNER PROVIDED EQUIPMENT ARE
INDICATED BY DASHED LINE TYPE.
9. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION
OF OWNER PROVIDED EQUIPMENT INCLUDING BUT NOT
LIMITED TO DIMENSIONAL INFORMATION, AND
MECHANICAL, ELECTRICAL AND PLUMBING
REQUIREMENTS.
10. CENTER FLOOR DRAINS IN SPACE UNLESS INDICATED
OTHERWISE.
INFILLED AREA
PLAN LEGEND:
EXISTING WALL/PARTITION/COLUMN
NEW WALL/PARTITION
VACANT SPACE
ACCESS CONTROL, RE: ELEC.
KEYED NOTES:
A
B
C
D
E
1 2 3 4 5 6
F2
AE301
F2
AE301
F9
AE310
C3
AE312
C3
AE312
AE100 D1
F1
AE504
F3
AE312
F6
AE310
AD101
F9
PROGRAM
ASSISTANT &
ADMIN
WORKSTATION
B19
PROGRAM
MANAGER
B18
PATIENT
ADVOCATE
B17
RESEARCH
ASSISTANT
B12
TOILET
B15
CORRIDOR
B00
RESIDENCY
PROGRAM
DIRECTOR
B12A
LOUNGE
B13
TOILET
B14A
LOCKER
B14
VACANT
SPACE
B11
AE201
B2
B1
B1
B14A
B1
B1
B1
B1
B02
B00
B2
B1
B2 0B
B20A
STAIR 1
B16
CONCRETE PAD. RE:
STRUCT & CIVIL
PROVIDE CONCRETE PAD
SLOPED AWAY FROM BUILDING
RE: STRUCT & CIVIL
UP
UP
F4
AE310
D1
AE502
F5
AE502
/2
6'
- 8
/2
5'
- 0
2'
- 9
/2
/2
9'
- 2
1/ 2"
2'
- 8
10' - 7 1/2" 9' - 2" 10' - 0" 31' - 2 1/2" 1' - 8 1/2"
9' - 1"
7'
- 2
/2
7'
- 5
6'
- 5
/2
7'
- 0
7'
- 1 0"
9'
- 1
1/
2" 4'
- 7
/2 " 8'
- 0
/2
6'
- 6
/2
8' - 11 1/2" 8' - 2" 9' - 6" 1' - 4" 13' - 3 1/2"
CORRIDOR
B21
5'
- 0
4'
- 1 1"
16' - 10" 4" 12' - 1 1/2" 13' - 11 1/2" 2' - 0 1/2" 16' - 0" 7' - 10"
10 1/2"
9' - 11 1/2" 10' - 8" 2"
12' - 1 1/2" 16' - 0" 16' - 0" 18' - 8" 10' - 8"
3 3 3 3 3 3 3
15' - 0 1/2" CLEAR
/2 " C
LE
AR
A1
B A1
B
B16
433 SF
MULTI-PURPOSE/
CONFERENCE/YOGA
B20
B1
106A106A106A106A106A 106A
106A
B16A
AE100
F1 SIM
W3
W3
W3
W3
Q3.0
Q3.0
S3a
S3a
S3a
S3a
Q3.0
S3a
Q3.0
S3a
S3a
S3a
S3a
S3a
F3a
S3.2a
S3.2a
S3.2a
S3a
S3a
S3a
S3a
S3a
S3a
S3a
F3a
S3a
S3a
Q3.0
F10
Q3.0
Q3.0
F2a
F2a
F2a
F2a
PROVIDED PAINTED STEEL CANE RAIL UNDER STAIR STRUCTURE;
CANE RAIL TO LIMIT ACCESS TO AREA WITH HEAD HEIGHTS LESS
THAN 6'-8" CLEAR FROM FINISHED FLOOR
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:2
AM
AE100A
ENLARGED GROUND FLOOR PLAN -
WEST
WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
SCALE: 1/4" = 1'-0"F1 ENLARGED GROUND FLOOR PLAN - WEST
SEE STRUCTURAL DRAWINGS FOR STAIR/SLOPED
WALKWAY FOOTINGS AND FOUNDATIONS
Revisions: Date:
ADDENDUM 1 JUNE 9, 2023
FURNITURE, FIXTURES AND EQUIPMENT SHOWN FOR
REFERENCE ONLY. REFER TO EQUIPMENT PLANS
FOR ADDITIONAL INFORMATION.
A
B
C
D
E
6 7 8 9 10
AE201
F5
C7
AE301
C7
AE301
F2
AE301
F2
AE301
C7
AE312
C7
AE312
F4
AE310
F6
AE311
F8
AE311
VOLUNTEERS
B03
ELEVATOR
MACHINE
ROOM
B02
BUILDING
SUPPORT
B08
TOILET
B09
HOUSEKEEPING
B10
BENEFITS
ADVISOR
B04
AE201
B2
ELEVATOR
LOBBY
B21A
B0
B0
B1
B02
B08
B1
B0
107L2L2107107107
106A
L33333
BUILDING
SUPPORT
B07
ELECTRIC
B06
B0
IT/DATA
B05
B0
STORAGE
CLOSET
B01
CORRIDOR
B21
B01
DN
UP
UP
F9
AE310
F1
AE310
F6
AE310
9"
3'
- 4
/2
" C L
INFILL EXISTING OPENING
TO MATCH EXISTING
ADJACENT MATERIALS AND
CONSTRUCTION
SUMP PIT
RE: STRUCT. / PLUMB.
D1
AE502
EXISTING FLOOR DRAIN LOCATION
PROVIDE NEW DRAIN AND CONNECT TO
EXISTING STORM SYSTEM, SLOPE LANDING
1/8":1'-0" TO DRAIN
A1
A A1
A
B07A
B0
AE100
F1 SIM
W2
W2
W2
M8.2
Q3.0 S3a Q3.0
W3
W3
W3
W3
11' - 1 1/2" 4' - 3" 44' - 6" 16' - 10"
2'
- 9
/2
/2
9'
- 2
1/ 2"
2'
- 8
4' - 10" 7" 7' - 1" 8' - 11" 15' - 2" 12' - 1"
11" 4' - 2" 3' - 5"
1/
2" 9'
- 4
9" 6' - 9 1/2" 11' - 4"
5' - 0 1/2" 6' - 8" 7' - 9 1/2" 7' - 3"
/2
15' - 5 1/2"
/2
6'
- 5
/2
4'
- 1
1" 7'
- 5
/2
7'
- 2
/2
6'
- 4
/2
8'
- 2
6'
- 5
/2
S3.2a
S3.2a
S3a
Q3.0 Q3.0
Q3.0Q3.0
F2a
F2a
F2a
F2aF2a
Q3.0
Q3.0
S3.1a S3.1a
S6.1
Q3.0
Q3.0 Q3.0
S6.0
S3a
S3a
S3a S3a
S3.1a
S3.1a
S3a
S3.2a
S3a
S3.1a
18' - 8" 16' - 0" 16' - 0" 12' - 1 1/2"
/2
6'
- 8
/2
5'
- 0
/2
FLOOR PLAN NOTES:
1. SEE GI002 FOR GENERAL PROJECT NOTES, LEGENDS
AND ABBREVIATIONS.
2. SEE GI003 FOR GENERAL MOUNTING HEIGHTS, TOP OF
WALL DETAILS AND PARTITION TYPES.
3. CONTRACTOR IS RESPONSIBLE FOR REVIEWING CODE
COMPLIANCE PLANS AND NOTIFYING THE ARCHITECT OF
CONFLICTS BETWEEN WHAT IS IN THE FIELD AND ON
THE CODE DOCUMENTS.
4. DIMENSIONS ARE FACE OF CONCRETE, FACE OF
MASONRY AND CENTERLINE OF STUD, UNLESS NOTED
OTHERWISE.
5. DOOR JAMBS (HINGE SIDE) SHALL BE 6" FROM CORNER
IN STUD PARTITIONS AND 8" FROM CORNER IN MASONRY
PARTITIONS UNLESS NOTED OTHERWISE.
6. REFER TO DETAILS FOR ADDITIONAL DIMENSIONING
INFORMATION.
7. REFER TO ENLARGED PLANS FOR PARTITION TYPES AND
DIMENSIONS IN AREAS WHICH ARE DETAILED AT A
LARGER SCALE.
8. FURNITURE AND OWNER PROVIDED EQUIPMENT ARE
INDICATED BY DASHED LINE TYPE.
9. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION
OF OWNER PROVIDED EQUIPMENT INCLUDING BUT NOT
LIMITED TO DIMENSIONAL INFORMATION, AND
MECHANICAL, ELECTRICAL AND PLUMBING
REQUIREMENTS.
10. CENTER FLOOR DRAINS IN SPACE UNLESS INDICATED
OTHERWISE.
INFILLED AREA
PLAN LEGEND:
EXISTING WALL/PARTITION/COLUMN
NEW WALL/PARTITION
VACANT SPACE
ACCESS CONTROL, RE: ELEC.
KEYED NOTES:
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:2
AM
AE100B
ENLARGED GROUND FLOOR PLAN -
EAST
WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
SCALE: 1/4" = 1'-0"F1 ENLARGED GROUND FLOOR PLAN - EAST
Revisions: Date:
ADDENDUM 1 JUNE 9, 2023
FURNITURE, FIXTURES AND EQUIPMENT SHOWN FOR
NEMA
3R
NEMA
3R
NL/EM NL/EM
NL/EM
NL/EM
NL/EM
NL/EM
NL/EM
NL/EM NL/EM NL/EM NL/EM
NL/EM
NL/EM
NL/EM
NL/EM
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
11 12
224 SF
TREATMENT
ROOM
48 SF
CLEAN
UTILITY
55 SF
PATIENT
TOILET
120A
146 SF
EXAM ROOM
51 SF
PATIENT
TOILETS
118A
151 SF
EXAM ROOM
76 SF
TOILET
83 SF
TOILET
191 SF
CORRIDOR
440 SF
WAITING
125 SF
INTERVIEW
126 SF
RECEPTION
175 SF
LAB
(PHLEBOTOMY)
119 SF
IT/DATA
48 SF
HOUSEKEEPING
223 SF
BARIATRIC
TREATMENT
ROOM
61 SF
SOILED
UTILITY
70 SF
BARIATRIC
TOILET
122A
145 SF
EXAM ROOM
75 SF
BARIATRIC
TOILET
125A
PATIENT
TOILET
124A
186 SF
BARIATRIC
EXAM ROOM
125 386 SF
WAITING
114 SF
LACTATION A
137 SF
SHARED
DOCUMENTATION
WORK AREA
80 SF
MED ROOM
55 SF
EQUIPMENT
STORAGE
51 SF
PATIENT
TOILETS
117A
48 SF
STAFF TOILET
ELECTRICAL
CLOSET
107468 SF
STAIR 1
S11
49 SF
TOILET
111A
347 SF
CORRIDOR
323 SF
CORRIDOR
357 SF
STAIR 2
S12
AE101D1
UP
DN
DN
DN
UP
DN
DN DN
ELEV.
E11
DN DN
AE
1A
AE
1B
ADDITION EXISTING EXISTING ADDITION
109 SF
MECH.
E12
AE100
F1 SIM
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
11 12
224 SF
TREATMENT
ROOM
48 SF
CLEAN
UTILITY
55 SF
PATIENT
TOILET
120A
146 SF
EXAM ROOM
51 SF
PATIENT
TOILETS
118A
151 SF
EXAM ROOM
76 SF
TOILET
83 SF
TOILET
191 SF
CORRIDOR
440 SF
WAITING
125 SF
INTERVIEW
126 SF
RECEPTION
175 SF
LAB
(PHLEBOTOMY)
119 SF
IT/DATA
48 SF
HOUSEKEEPING
223 SF
BARIATRIC
TREATMENT
ROOM
61 SF
SOILED
UTILITY
70 SF
BARIATRIC
TOILET
122A
145 SF
EXAM ROOM
75 SF
BARIATRIC
TOILET
125A
56 SF
PATIENT
TOILET
124A
186 SF
BARIATRIC
EXAM ROOM
386 SF
WAITING
114 SF
LACTATION A
137 SF
SHARED
DOCUMENTATION
WORK AREA
80 SF
MED ROOM
55 SF
EQUIPMENT
STORAGE
51 SF
PATIENT
TOILETS
117A
48 SF
STAFF TOILET
9 SF
ELECTRICAL
CLOSET
468 SF
STAIR 1
S11
BARIATRIC PATIENT LIFT AND
TRACK. TYP OF 6 (EXAM ROOMS
AND PROCEDURE ROOMS)
RE: STRUCT FOR MOUNTING
49 SF
TOILET
111A
357 SF
STAIR 2
S12
CEILING HEIGHT
ADJUSTED AT WINDOW
WALL TO COORDINATE
WITH EXISTING WINDOW
HEADS(TYP.)
8' - 6"
7' - 0" 7' - 0"
8' - 8"
FLOOR PLAN NOTES:
1. SEE GI002 FOR GENERAL PROJECT NOTES, LEGENDS
AND ABBREVIATIONS.
2. SEE GI003 FOR GENERAL MOUNTING HEIGHTS, TOP OF
WALL DETAILS AND PARTITION TYPES.
3. CONTRACTOR IS RESPONSIBLE FOR REVIEWING CODE
COMPLIANCE PLANS AND NOTIFYING THE ARCHITECT OF
CONFLICTS BETWEEN WHAT IS IN THE FIELD AND ON
THE CODE DOCUMENTS.
4. DIMENSIONS ARE FACE OF CONCRETE, FACE OF
MASONRY AND CENTERLINE OF STUD, UNLESS NOTED
OTHERWISE.
5. DOOR JAMBS (HINGE SIDE) SHALL BE 6" FROM CORNER
IN STUD PARTITIONS AND 8" FROM CORNER IN MASONRY
PARTITIONS UNLESS NOTED OTHERWISE.
6. REFER TO DETAILS FOR ADDITIONAL DIMENSIONING
INFORMATION.
7. REFER TO ENLARGED PLANS FOR PARTITION TYPES AND
DIMENSIONS IN AREAS WHICH ARE DETAILED AT A
LARGER SCALE.
8. FURNITURE AND OWNER PROVIDED EQUIPMENT ARE
INDICATED BY DASHED LINE TYPE.
9. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION
OF OWNER PROVIDED EQUIPMENT INCLUDING BUT NOT
LIMITED TO DIMENSIONAL INFORMATION, AND
MECHANICAL, ELECTRICAL AND PLUMBING
REQUIREMENTS.
10. CENTER FLOOR DRAINS IN SPACE UNLESS INDICATED
OTHERWISE.
INFILLED AREA
PLAN LEGEND:
EXISTING WALL/PARTITION/COLUMN
NEW WALL/PARTITION
VACANT SPACE
CEILING NOTES:
1. SEE GI001 FOR GENERAL PROJECT NOTES.
2. SEE FINISH SCHEDULE FOR CEILING AND CEILING GRID
TYPES.
3. EXCEPT WHERE INDICATED, CENTER CEILING GRIDS IN
ROOMS. USE HALF TILES OF GREATER @ PERIMETERS
WHEN POSSIBLE.
4. ALIGN CEILING ITEMS AS SHOWN, WITH COMMON
CENTERLINES TYPICALLY. CENTER ITEMS IN CEILING, OR
IN AREAS UNLESS INDICATED OTHERWISE.
5. WHERE TEGULAR OR BEVELED TILE IS USED, PAINT ALL
CUT EDGES TO MATCH.
6. CAULK JOINT BETWEEN CEILING GRID (WALL ANGLE)
AND WALL WHERE GAPS ARE LARGER THAN 1/8" OR
GREATER.
7. PROVIDE ACCESS PANELS AS REQUIRED IN GWB
CEILINGS FOR ACCESS AS REQUIRED BY ALL TRADES.
8. FIRE SPRINKLERS SHALL BE CENTERED IN CEILING TILE
OR HALF TILE AS SHOWN. FIRE SPRINKLERS SHALL BE
LOCATED IN ALIGNMENT WITH OTHER CEILING ITEMS
AND SHALL BE PLACED IN COORDINATION WITH LIGHT
FIXTURE POSITIONS INDICATED, TYPICAL.
9. FIRE SPRINKLERS ARE SHOWN FOR COORDINATION
PURPOSES ONLY. ADDITIONAL SPRINKLER HEADS MAY
BE REQUIRED FOR CODE COMPLIANCE, AS DETERMINED
BY THE FIRE PROTECTION DESIGNER. SPRINKLERS ARE
NOT SHOWN IN ALL AREAS WHERE REQUIRED. FIRE
PROTECTION CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING A COMPLETE AND FULLY CODE
COMPLIANT SYSTEM, INCLUDING HEADS NOT INDICATED
IN THIS DRAWING. SIDEWALL MOUNT SPRINKLER HEADS
UNDER BALCONIES ARE NOT SHOWN IN THE CEILING
PLANS.
10. SEE MECHANICAL, ELECTRICAL AND PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
11. WHERE ARCHITECTURAL DRAWINGS DEPICT
MECHANICAL OR ELECTRICAL ITEMS OR EQUIPMENT
(LIGHTS, DIFFUSERS, ETC.) INSTALLATION OF SUCH
ITEMS SHALL BE COORDINATED WITH EACH RESPECTIVE
TRADE SUB-CONTRACTOR.
12. WHERE DRAWINGS DO NOT ACCESS INSTALLATION
METHODOLOGY, THE CONTRACTOR SHALL BE BOUND
TO PERFORM IN STRICT COMPLIANCE WITH THE
MANUFACTURER'S SPECIFICATIONS, AND STANDARD
INDUSTRY STANDARDS.
13. CONTRACTOR TO COORDINATE ANY BLOCKING OR
STRUCTURAL SUPPORT ABOVE THE CEILING FOR
OWNER PROVIDED EQUIPMENT.
SUPPLY DIFFUSER
RETURN DIFFUSER
EXHAUST DIFFUSER
LINEAR DIFFUSER
GWB CEILING
DOWN LIGHT
2x2 LIGHT FIXTURE
2x2 CEILING TILE AND GRID (ACT-1)
CEILING LEGEND:
2x2 LIGHT FIXTURE (EMERG.)
UTILITY LIGHT FIXTURE
UTILITY LIGHT FIXTURE (EMERG.)
EMERGENCY EXIT SIGN
OCCUPANCY SENSOROC
R
WALL SCONCE
LINEAR WALL LIGHT
EXTERIOR WALL SCONCE
ACCESS CONTROL, RE: ELEC.
KEYED NOTES:
COUNTER TOP
WITH BACK
SPLASH
2'
- 1
1"
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:2
AM
AE101
OVERALL FIRST FLOOR PLANS WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
SCALE: 1/8" = 1'-0"F3 OVERALL FIRST FLOOR PLAN
SCALE: 1/8" = 1'-0"C3 FIRST FLOOR REFLECTED CEILING PLAN
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:2
AM
AE101
OVERALL FIRST FLOOR PLANS WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
Revisions: Date:
ADDENDUM 1 JUNE 9, 2023
Revisions: Date:
ADDENDUM 1 JUNE 9, 2023
FIRST FLOOR CEILING SCHEDULE
# Name Ceiling Finish Ceiling Height Comments
100 CORRIDOR ACT-1/GWB 8'-0" SEE PLAN FOR GWB SOFFIT/BULKHEAD LOCATIONS
101 WAITING ACT-1/GWB 8'-0" SEE PLAN FOR GWB SOFFIT/BULKHEAD LOCATIONS
102 INTERVIEW ACT-1 8'-0"
103 IT/DATA ACT-1 8'-0"
104 SHARED DOCUMENTATION WORK AREA ACT-1 8'-0"
105 EQUIPMENT STORAGE ACT-1 8'-0"
106 MED ROOM ACT-1 8'-0"
107 ELECTRICAL CLOSET ACT-1 8'-0"
109 LAB (PHLEBOTOMY) ACT-1 8'-0"
110 HOUSEKEEPING ACT-1 8'-0"
111 LACTATION A ACT-1 8'-0"
111A TOILET ACT-1 8'-0"
112 STAFF TOILET ACT-1 8'-0"
113 RECEPTION ACT-1 8'-0"
114 WAITING ACT-1 8'-0"
115 TOILET ACT-1 8'-0"
116 TOILET ACT-1 8'-0"
117 EXAM ROOM ACT-1 8'-0"
117A PATIENT TOILETS ACT-1 8'-0"
118 EXAM ROOM ACT-1 8'-0"
118A PATIENT TOILETS ACT-1 8'-0"
119 CLEAN UTILITY ACT-1 8'-0"
120 TREATMENT ROOM ACT-1 8'-6"
120A PATIENT TOILET ACT-1 8'-6"
122 BARIATRIC TREATMENT ROOM ACT-1 8'-6" COORDINATE WITH PATIENT LIFT TRACK
122A BARIATRIC TOILET ACT-1 8'-6" COORDINATE WITH PATIENT LIFT TRACK
123 SOILED UTILITY ACT-1 8'-0"
124 EXAM ROOM ACT-1 8'-0"
124A PATIENT TOILET ACT-1 8'-0"
125 BARIATRIC EXAM ROOM ACT-1 8'-6" COORDINATE WITH PATIENT LIFT TRACK
125A BARIATRIC TOILET ACT-1 8'-6" COORDINATE WITH PATIENT LIFT TRACK
130 CORRIDOR ACT-1 8'-0"
140 CORRIDOR ACT-1 8'-0"
E11 ELEV. ACT-1 8'-0" COORDINATE WITH ELEVATOR MANUFACTURER
E12 MECH. EXPOSED 10'-6"
S11 STAIR 1 ACT-1/GWB 8'-6" SEE PLAN FOR GWB SOFFIT/BULKHEAD LOCATIONS
S12 STAIR 2 ACT-1/GWB 9'-0" SEE PLAN FOR GWB SOFFIT/BULKHEAD LOCATIONS
LIGHTING FIXTURES SHOWN FOR
REFERENCE ONLY. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
SCALE: 1/4" = 1'-0"D1 INTERIOR ELEVATION -SOILED UTILITY (TYP.)
C
D
E
1 2 3 4 5 6
F2
AE301
F2
AE301
F9
AE310
C3
AE312
C3
AE312
F1
AE504
F3
AE312
AE101D1
F6
AE310
AD101
F9
224 SF
TREATMENT
ROOM
CLEAN
UTILITY
55 SF
PATIENT
TOILET
120A
146 SF
EXAM ROOM
51 SF
PATIENT
TOILETS
118A
151 SF
EXAM ROOM
76 SF
TOILET
83 SF
TOILET
223 SF
BARIATRIC
TREATMENT
ROOM
61 SF
SOILED
UTILITY
70 SF
BARIATRIC
TOILET
122A
145 SF
EXAM ROOM
75 SF
BARIATRIC
TOILET
125A
56 SF
PATIENT
TOILET
124A
51 SF
PATIENT
TOILETS
117A
468 SF
STAIR 1
S11
121B
UP
DN
COORD. TO ALIGN
W/ MILLWORK
DN DN
DN
DN
3T
3T
3T 3T
3L 3L 3L 3L 3L 3L 3L 2B
2B
3L3L3L3L3L3L
3T3T
3T
3T
121A
122A
125A
7118A
117A
120A
1 1
D 6' - 0"
D 6' - 0"
R 5'
- 6
" M
IN
RE: CIVIL
MAX SLOPE 1:48
7' - 0" LANDING
18" CHANGE IN ELEVATION
30' - 0" AT 1:20 SLOPE
14" CHANGE IN ELEVATION
23' - 8" AT 1:20 SLOPE
MAX SLOPE 1:48
7' - 0" LANDING
8.5" CHANGE IN ELEVATION
14' - 0" AT 1:20 SLOPE
SLOPE DOWN MAX 1:20
SLOPE DOWN MAX 1:20
SLOPE DOWN MAX 1:20
SLOPE DOWN MAX 1:20
174.8
169.9
VERIFY OVERALL RISE/RUN
OF SLOPED WALKWAY IN
THE FIELD, SO ALSO CIVIL
70 SF
BARIATRIC
TOILET
122A
INFILL CAVITY WITH SPRAY FOAM
INSULATION TO MAINTAIN CONTINUOUS
INSULATED PERIMETER
186 SF
BARIATRIC
EXAM ROOM
A1
B A1
B
FEC
D 6' - 0"
6' - 5 1/2"3' - 8 1/2"6' - 5 1/2"
5'
- 0
3'
- 8
/2
7'
- 5
/2
7'
- 5
/2
3'
- 8
/2
4'
- 1
1/ 2"
FURNITURE, FIXTURES AND EQUIPMENT SHOWN FOR
REFERENCE ONLY. REFER TO EQUIPMENT PLANS
FOR ADDITIONAL INFORMATION.
PROVIDED PAINTED STEEL CANE RAIL UNDER STAIR STRUCTURE;
CANE RAIL TO LIMIT ACCESS TO AREA WITH HEAD HEIGHTS LESS
THAN 6'-8" CLEAR FROM FINISHED FLOOR
347 SF
CORRIDOR
191 SF
CORRIDOR
100A
AE100
F1 SIM
W2
12' - 1 1/2" 16' - 0" 16' - 0" 18' - 8" 10' - 8"
/2
6'
- 8
/2
5'
- 0
1"
15' - 6 1/2"
15' - 9 1/2" 1' - 2" 4' - 0" 5' - 9" 1' - 0" 10' - 7 1/2" 10" 3' - 10" 2' - 4" 5' - 6" 12' - 3"
3' - 8 1/2" 10' - 6 1/2" 5' - 7 1/2" 2' - 10"
16' - 9 1/2" 2' - 0" 6' - 11" 10' - 11" 8' - 2" 7' - 6" 10" 2' - 8 1/2" 7' - 9" 2' - 1 1/2"
1/
2" 6'
- 5
4'
- 7
2'
- 6
/2
7'
- 6
7'
- 7
/2
7'
- 0
6'
- 7
/2
/2
7'
- 1
7'
- 1
6"
7'
- 0
/2
6'
- 1
1/
2"
/2
6'
- 9
/2
4'
- 1
1/
2"
1'
- 4
"3'
- 9
/2
/2
8'
- 6
/2
6'
- 4
/2
1'
- 0
/2
124A
16' - 7 1/2" W2
W2
Q3.0
Q3.0
S3a S6.1
U4.1
U4.1 S6.1 S3.1a
S3.1a S3a
Q3.0 F3a
F3a
F3a
F3a Q3.0
S3a
S6.0
S3a
F3a
F3a
F6
S3a
F6
S3a
S3a
F3a
F3a
Q3.0
Q3.0
S3a
U4.1
S3.1a
S3.1a
S3.1a
U4.1
F6
S6.0
S3a
S3a
S3a
S3a
S3a
F3a
F3a
S3a
F3a
Q3.0
Q3.0
S3a
S3a
S3a
S3.1a
F1a
U4.1U4.1
F3a
F3a
F3aF3a
F3a
F3a
S3a
S3a
PROVIDE CONC. CURB ALONG ALL
EDGES OF SLOPED WALKWAY
AND LANDINGS, 4" WIDE, 4" HIGH
REGRADE AROUND ALL SIDES OF SLOPED
WALKWAY AND LANDINGS TO PROVIDE A MAX. 30"
DROP-OFF FROM TOP OF CURB TO FINISH GRADE
FLOOR PLAN NOTES:
1. SEE GI002 FOR GENERAL PROJECT NOTES, LEGENDS
AND ABBREVIATIONS.
2. SEE GI003 FOR GENERAL MOUNTING HEIGHTS, TOP OF
WALL DETAILS AND PARTITION TYPES.
3. CONTRACTOR IS RESPONSIBLE FOR REVIEWING CODE
COMPLIANCE PLANS AND NOTIFYING THE ARCHITECT OF
CONFLICTS BETWEEN WHAT IS IN THE FIELD AND ON
THE CODE DOCUMENTS.
4. DIMENSIONS ARE FACE OF CONCRETE, FACE OF
MASONRY AND CENTERLINE OF STUD, UNLESS NOTED
OTHERWISE.
5. DOOR JAMBS (HINGE SIDE) SHALL BE 6" FROM CORNER
IN STUD PARTITIONS AND 8" FROM CORNER IN MASONRY
PARTITIONS UNLESS NOTED OTHERWISE.
6. REFER TO DETAILS FOR ADDITIONAL DIMENSIONING
INFORMATION.
7. REFER TO ENLARGED PLANS FOR PARTITION TYPES AND
DIMENSIONS IN AREAS WHICH ARE DETAILED AT A
LARGER SCALE.
8. FURNITURE AND OWNER PROVIDED EQUIPMENT ARE
INDICATED BY DASHED LINE TYPE.
9. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION
OF OWNER PROVIDED EQUIPMENT INCLUDING BUT NOT
LIMITED TO DIMENSIONAL INFORMATION, AND
MECHANICAL, ELECTRICAL AND PLUMBING
REQUIREMENTS.
10. CENTER FLOOR DRAINS IN SPACE UNLESS INDICATED
OTHERWISE.
INFILLED AREA
PLAN LEGEND:
EXISTING WALL/PARTITION/COLUMN
NEW WALL/PARTITION
VACANT SPACE
ACCESS CONTROL, RE: ELEC.
KEYED NOTES:
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:3
AM
AE101A
ENLARGED FIRST FLOOR PLAN - WEST WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
SCALE: 1/4" = 1'-0"F1 ENLARGED FIRST FLOOR PLAN - WEST
C
D
E
6 7 8 9 10
AE201
F5
C7
AE301
C7
AE301
F2
AE301
F2
AE301
C7
AE312
C7
AE312
F4
AE310
F7
AE312
F6
AE311
F6
AE311
F8
AE311
191 SF
CORRIDOR
440 SF
WAITING
114 125 SF
INTERVIEW
175 SF
LAB
(PHLEBOTOMY)
48 SF
HOUSEKEEPING
114 SF
LACTATION A
137 SF
SHARED
DOCUMENTATION
WORK AREA
80 SF
MED ROOM
48 SF
STAFF TOILET
ELECTRICAL
CLOSET
49 SF
TOILET
111A
119 SF
IT/DATA
126 SF
RECEPTION
386 SF
WAITING
55 SF
EQUIPMENT
STORAGE
357 SF
STAIR 2
S12
109 SF
MECH.
E12
UP
DN
DN
3L 3L 3L 3L 3L
3T 3T
3T
3T
3T
L1
3L3L3L3L3L3L
2B
111A
79 SF
ELEV.
E11
AE501
C3 SIM
AE501
2 SIM
AE501
C1 SIM
AE501
C6 SIM
A1
A A1
A
CLEAR
4' - 0"
PROVIDED PAINTED STEEL CANE RAIL UNDER STAIR STRUCTURE;
CANE RAIL TO LIMIT ACCESS TO AREA WITH HEAD HEIGHTS LESS
THAN 6'-8" CLEAR FROM FINISHED FLOOR
6' - 5 1/2" 3' - 8 1/2"
6' - 5 1/2"
5'
- 0
3'
- 8
/2
7'
- 5
/2
7'
- 5
/2
3'
- 8
/2
4'
- 1
1/ 2"
108B 100B
AE100
F1 SIM
18' - 8" 16' - 0" 16' - 0" 12' - 1 1/2"
/2
6'
- 8
/2
5'
- 0
5'
- 1
1/
2"
15' - 6 1/2"
3' - 4" 11' - 1 1/2" 11" 1' - 0" 1' - 0" 8' - 5 1/2" 1' - 4" 7' - 6 1/2" 10' - 1" 5' - 4 1/2" 4' - 9 1/2" 7' - 0"
2' - 2" 1' - 11" 5' - 4 1/2" 7' - 4" 1' - 1 1/2"
3' - 7 1/2" 6' - 1 1/2" 7' - 10 1/2" 9' - 0"
7' - 9" 9' - 5 1/2"
1' - 0 1/2"
7' - 5 1/2" 9' - 8 1/2" 15' - 6 1/2"
1' - 4 1/2"
7'
- 4
/2
2'
- 2
/2
5'
- 1
6'
- 5
/2
7'
- 7
7'
- 0
/2
6'
- 5
1'
- 9
/2 " 7'
- 5
/2
5'
- 4
/2
1'
- 1
4'
- 9
4'
- 4
4'
- 8
/2
1'
- 2
/2
5'
- 8
/2
1'
- 2
0" 4'
- 1 1"
8' - 6"
9'
- 4
16' - 7 1/2"
/2
W2
W2 W2
M8.2 W2
W2
U4.1
F2a
W2
Q3.0 S3a
S3a
S3a
S3a
S3a
U4.1
Q3.0
U4.1
F2a
Q3.0
F3a
S3.1a S3a
U4.1
S3a
F3aS3a
F3a
F3a
S3a
F3a
Q3.0
S3a S3a
F3a
Q3.0
F3a
S3a
F3a
S3a
S3.1a
S3.1a
U4.1
U4.1
S3.1aS3a
F3a
S3a
U4.1
S3a
Q3.0Q3.0
Q3.0
Q3.0
U4.1
U4.1 F3a
F1a
8A
FLOOR PLAN NOTES:
1. SEE GI002 FOR GENERAL PROJECT NOTES, LEGENDS
AND ABBREVIATIONS.
2. SEE GI003 FOR GENERAL MOUNTING HEIGHTS, TOP OF
WALL DETAILS AND PARTITION TYPES.
3. CONTRACTOR IS RESPONSIBLE FOR REVIEWING CODE
COMPLIANCE PLANS AND NOTIFYING THE ARCHITECT OF
CONFLICTS BETWEEN WHAT IS IN THE FIELD AND ON
THE CODE DOCUMENTS.
4. DIMENSIONS ARE FACE OF CONCRETE, FACE OF
MASONRY AND CENTERLINE OF STUD, UNLESS NOTED
OTHERWISE.
5. DOOR JAMBS (HINGE SIDE) SHALL BE 6" FROM CORNER
IN STUD PARTITIONS AND 8" FROM CORNER IN MASONRY
PARTITIONS UNLESS NOTED OTHERWISE.
6. REFER TO DETAILS FOR ADDITIONAL DIMENSIONING
INFORMATION.
7. REFER TO ENLARGED PLANS FOR PARTITION TYPES AND
DIMENSIONS IN AREAS WHICH ARE DETAILED AT A
LARGER SCALE.
8. FURNITURE AND OWNER PROVIDED EQUIPMENT ARE
INDICATED BY DASHED LINE TYPE.
9. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION
OF OWNER PROVIDED EQUIPMENT INCLUDING BUT NOT
LIMITED TO DIMENSIONAL INFORMATION, AND
MECHANICAL, ELECTRICAL AND PLUMBING
REQUIREMENTS.
10. CENTER FLOOR DRAINS IN SPACE UNLESS INDICATED
OTHERWISE.
INFILLED AREA
PLAN LEGEND:
EXISTING WALL/PARTITION/COLUMN
NEW WALL/PARTITION
VACANT SPACE
ACCESS CONTROL, RE: ELEC.
KEYED NOTES:
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:4
AM
AE101B
ENLARGED FIRST FLOOR PLAN - EAST WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
SCALE: 1/4" = 1'-0"F1 ENLARGED FIRST FLOOR PLAN - EAST
Revisions: Date:
ADDENDUM 1 JUNE 9, 2023
FURNITURE, FIXTURES AND EQUIPMENT SHOWN FOR
OC
NL/EM NL/EM NL/EM NL/EM NL/EM
NL/EM
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
11 12
AE201
F5
223 SF
BARIATRIC
TREATMENT
ROOM
69 SF
BARIATRIC
TOILET
218A
61 SF
SOILED
UTILITY
145 SF
EXAM ROOM
56 SF
PATIENT
TOILET
220A
75 SF
BARIATRIC
TOILET
221A
213 SF
BARIATRIC
EXAM ROOM
212 SF
CORRIDOR
200 117 SF
NURSE
MANAGER
203 217 SF
TRAINING
46 SF
HOUSEKEEPING/
ATTIC
ACCESS
119 SF
IT/DATA
62 SF
TOILET
61 SF
TOILET
620 SF
SPECIALITY
PROVIDER &
RN CARE
MANAGER
WORKSTATIONS
212151 SF
EXAM ROOM
51 SF
PATIENT
TOILET
213A
50 SF
PATIENT
TOILET
214A
147 SF
EXAM ROOM
48 SF
CLEAN
UTILITY
55 SF
PATIENT
TOILET
216A
224 SF
TREATMENT
ROOM
216 119 SF
MED ROOM
155 SF
OFFICE/EXAM
222 SF
EQUIPMENT
STORAGE
9 SF
ELECTRICAL
CLOSET
147 SF
OFFICE/EXAM
48 SF
STORAGE
212A
357 SF
STAIR
468 SF
STAIR 1
DNDN
ELEV.
E21
A1
A
A1
B
ADDITION EXISTING EXISTING ADDITION
109 SF
MECH.
E12
AE100
F1 SIM
FLOOR PLAN NOTES:
1. SEE GI002 FOR GENERAL PROJECT NOTES, LEGENDS
AND ABBREVIATIONS.
2. SEE GI003 FOR GENERAL MOUNTING HEIGHTS, TOP OF
WALL DETAILS AND PARTITION TYPES.
3. CONTRACTOR IS RESPONSIBLE FOR REVIEWING CODE
COMPLIANCE PLANS AND NOTIFYING THE ARCHITECT OF
CONFLICTS BETWEEN WHAT IS IN THE FIELD AND ON
THE CODE DOCUMENTS.
4. DIMENSIONS ARE FACE OF CONCRETE, FACE OF
MASONRY AND CENTERLINE OF STUD, UNLESS NOTED
OTHERWISE.
5. DOOR JAMBS (HINGE SIDE) SHALL BE 6" FROM CORNER
IN STUD PARTITIONS AND 8" FROM CORNER IN MASONRY
PARTITIONS UNLESS NOTED OTHERWISE.
6. REFER TO DETAILS FOR ADDITIONAL DIMENSIONING
INFORMATION.
7. REFER TO ENLARGED PLANS FOR PARTITION TYPES AND
DIMENSIONS IN AREAS WHICH ARE DETAILED AT A
LARGER SCALE.
8. FURNITURE AND OWNER PROVIDED EQUIPMENT ARE
INDICATED BY DASHED LINE TYPE.
9. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION
OF OWNER PROVIDED EQUIPMENT INCLUDING BUT NOT
LIMITED TO DIMENSIONAL INFORMATION, AND
MECHANICAL, ELECTRICAL AND PLUMBING
REQUIREMENTS.
10. CENTER FLOOR DRAINS IN SPACE UNLESS INDICATED
OTHERWISE.
INFILLED AREA
PLAN LEGEND:
EXISTING WALL/PARTITION/COLUMN
NEW WALL/PARTITION
VACANT SPACE
CEILING NOTES:
1. SEE GI001 FOR GENERAL PROJECT NOTES.
2. SEE FINISH SCHEDULE FOR CEILING AND CEILING GRID
TYPES.
3. EXCEPT WHERE INDICATED, CENTER CEILING GRIDS IN
ROOMS. USE HALF TILES OF GREATER @ PERIMETERS
WHEN POSSIBLE.
4. ALIGN CEILING ITEMS AS SHOWN, WITH COMMON
CENTERLINES TYPICALLY. CENTER ITEMS IN CEILING, OR
IN AREAS UNLESS INDICATED OTHERWISE.
5. WHERE TEGULAR OR BEVELED TILE IS USED, PAINT ALL
CUT EDGES TO MATCH.
6. CAULK JOINT BETWEEN CEILING GRID (WALL ANGLE)
AND WALL WHERE GAPS ARE LARGER THAN 1/8" OR
GREATER.
7. PROVIDE ACCESS PANELS AS REQUIRED IN GWB
CEILINGS FOR ACCESS AS REQUIRED BY ALL TRADES.
8. FIRE SPRINKLERS SHALL BE CENTERED IN CEILING TILE
OR HALF TILE AS SHOWN. FIRE SPRINKLERS SHALL BE
LOCATED IN ALIGNMENT WITH OTHER CEILING ITEMS
AND SHALL BE PLACED IN COORDINATION WITH LIGHT
FIXTURE POSITIONS INDICATED, TYPICAL.
9. FIRE SPRINKLERS ARE SHOWN FOR COORDINATION
PURPOSES ONLY. ADDITIONAL SPRINKLER HEADS MAY
BE REQUIRED FOR CODE COMPLIANCE, AS DETERMINED
BY THE FIRE PROTECTION DESIGNER. SPRINKLERS ARE
NOT SHOWN IN ALL AREAS WHERE REQUIRED. FIRE
PROTECTION CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING A COMPLETE AND FULLY CODE
COMPLIANT SYSTEM, INCLUDING HEADS NOT INDICATED
IN THIS DRAWING. SIDEWALL MOUNT SPRINKLER HEADS
UNDER BALCONIES ARE NOT SHOWN IN THE CEILING
PLANS.
10. SEE MECHANICAL, ELECTRICAL AND PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
11. WHERE ARCHITECTURAL DRAWINGS DEPICT
MECHANICAL OR ELECTRICAL ITEMS OR EQUIPMENT
(LIGHTS, DIFFUSERS, ETC.) INSTALLATION OF SUCH
ITEMS SHALL BE COORDINATED WITH EACH RESPECTIVE
TRADE SUB-CONTRACTOR.
12. WHERE DRAWINGS DO NOT ACCESS INSTALLATION
METHODOLOGY, THE CONTRACTOR SHALL BE BOUND
TO PERFORM IN STRICT COMPLIANCE WITH THE
MANUFACTURER'S SPECIFICATIONS, AND STANDARD
INDUSTRY STANDARDS.
13. CONTRACTOR TO COORDINATE ANY BLOCKING OR
STRUCTURAL SUPPORT ABOVE THE CEILING FOR
OWNER PROVIDED EQUIPMENT.
SUPPLY DIFFUSER
RETURN DIFFUSER
EXHAUST DIFFUSER
LINEAR DIFFUSER
GWB CEILING
DOWN LIGHT
2x2 LIGHT FIXTURE
2x2 CEILING TILE AND GRID (ACT-1)
CEILING LEGEND:
2x2 LIGHT FIXTURE (EMERG.)
UTILITY LIGHT FIXTURE
UTILITY LIGHT FIXTURE (EMERG.)
EMERGENCY EXIT SIGN
OCCUPANCY SENSOROC
R
WALL SCONCE
LINEAR WALL LIGHT
EXTERIOR WALL SCONCE
ACCESS CONTROL, RE: ELEC.
KEYED NOTES:
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
11 12
223 SF
BARIATRIC
TREATMENT
ROOM
69 SF
BARIATRIC
TOILET
218A
61 SF
SOILED
UTILITY
219 145 SF
EXAM ROOM
56 SF
PATIENT
TOILET
220A
75 SF
BARIATRIC
TOILET
221A
213 SF
BARIATRIC
EXAM ROOM
212 SF
CORRIDOR
117 SF
NURSE
MANAGER
217 SF
TRAINING
119 SF
IT/DATA
62 SF
TOILET
61 SF
TOILET
620 SF
SPECIALITY
PROVIDER &
RN CARE
MANAGER
WORKSTATIONS
151 SF
EXAM ROOM
51 SF
PATIENT
TOILET
213A
50 SF
PATIENT
TOILET
214A
147 SF
EXAM ROOM
48 SF
CLEAN
UTILITY
55 SF
PATIENT
TOILET
216A
224 SF
TREATMENT
ROOM
119 SF
MED ROOM
155 SF
OFFICE/EXAM
222 SF
EQUIPMENT
STORAGE
9 SF
ELECTRICAL
CLOSET
BARIATRIC PATIENT LIFT AND
TRACK. TYP OF 6 (EXAM ROOMS
AND PROCEDURE ROOMS)
RE: STRUCT FOR MOUNTING
147 SF
OFFICE/EXAM
357 SF
STAIR
468 SF
STAIR 1
48 SF
STORAGE
212A
AE102
B1
1-HR. RATED GWB CEILING ON
(5/8" TYPE 'X' GWB ON 7/8"
RESILIENT CHANNEL)
UNDERSIDE OF STRUCTURE
ABOVE ACT AT NEW
STAIRWELL, TYP. (AREA SHOWN
HATCHED)
1-HR. RATED GWB CEILING ON
(5/8" TYPE 'X' GWB ON 7/8"
RESILIENT CHANNEL)
UNDERSIDE OF STRUCTURE
ABOVE ACT AT NEW
STAIRWELL, TYP. (AREA SHOWN
HATCHED)
2-HR. RATED HORIZONTAL SHAFTWALL AT
TOP OF ELEVATOR SHAFT. SEE DETAILS
46 SF
HOUSEKEEPING/
ATTIC
ACCESS
298 SF
CORRIDOR
109 SF
MECH.
E12
449 SF
CORRIDOR
8' - 0" 8' - 0"
C
WALLS TO
UNDERSIDE OF
ATTIC FLOOR.
C5
AE504
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678 www.smrtinc.com
SMRT Architects and Engineers 200 Brickstone Square, Suite 303
Andover, Massachusetts 01810
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
BEDFORD VA MEDICAL CENTER
C :\U se rs
\m cu tle r\D oc um en ts
\2
_V
A Be df or d W om en s C lin ic
_A rc h_ R
_m cu tle rH N
JT
K.
rv t
6/ 9/
1:
:4
AM
AE102
OVERALL SECOND FLOOR PLANS WOMEN'S CLINIC DESIGN
518-21-103
06-09-2023 MC MC/MP/BL
200 SPRINGS ROAD, BEDFORD, MA 01730
SCALE: 1/8" = 1'-0"F3 OVERALL SECOND FLOOR PLAN
SCALE: 1/8" = 1'-0"C3 SECOND FLOOR REFLECTED CEILING PLAN
SCALE: 1/2" = 1'-0"B1 HOUSE KEEPING / ATTIC ACCESS
Revisions: Date:
ADDENDUM 1 JUNE 9, 2023
SECOND FLOOR CEILING SCHEDULE
# Name Ceiling Finish Ceiling Height Comments
200 CORRIDOR ACT-1/GWB 8'-0" SEE PLAN FOR GWB SOFFIT/BULKHEAD LOCATIONS
201 OFFICE/EXAM ACT-1 8'-0"
202 IT/DATA ACT-1 8'-0"
203 NURSE MANAGER ACT-1 8'-0"
204 TRAINING ACT-1 8'-0"
205 ELECTRICAL CLOSET ACT-1 8'-0"
206 STAIR ACT-1 8'-0"
207 MED ROOM ACT-1 8'-0"
208 HOUSEKEEPING/ ATTIC ACCESS ACT-1 8'-0" COORDINATE WITH ATTIC ACCESS
209 EQUIPMENT STORAGE ACT-1 8'-0"
210 TOILET ACT-1 8'-0"
211 TOILET ACT-1 8'-0"
212 SPECIALITY PROVIDER & RN CARE
MANAGER WORKSTATIONS
ACT-1 8'-0"
212A STORAGE ACT-1 8'-0"
213 EXAM ROOM ACT-1 8'-0"
213A PATIENT TOILET ACT-1 8'-0"
214 EXAM ROOM ACT-1 8'-0"
214A PATIENT TOILET ACT-1 8'-0"
215 CLEAN UTILITY ACT-1 8'-0"
216 TREATMENT ROOM ACT-1 8'-6"
216A PATIENT TOILET ACT-1 8'-6"
217 STAIR 1 ACT-1 8'-0"
218 BARIATRIC TREATMENT ROOM ACT-1 8'-6" COORDINATE WITH PATIENT LIFT TRACK
218A BARIATRIC TOILET ACT-1 8'-6" COORDINATE WITH PATIENT LIFT TRACK
219 SOILED UTILITY ACT-1 8'-0"
220 EXAM ROOM ACT-1 8'-0"
220A PATIENT TOILET ACT-1 8'-0"
221 BARIATRIC EXAM ROOM ACT-1 8'-6" COORDINATE WITH PATIENT LIFT TRACK
221A BARIATRIC TOILET ACT-1 8'-6" COORDINATE WITH PATIENT LIFT TRACK
222 OFFICE/EXAM ACT-1 8'-0"
230 CORRIDOR ACT-1 8'-2"
240 CORRIDOR ACT-1/GWB 8'-0" SEE PLAN FOR GWB SOFFIT/BULKHEAD LOCATIONS
E21 ELEV. ACT-1 8'-0" COORDINATE WITH ELEVATOR MANUFACTURER
LIGHTING FIXTURES SHOWN FOR
REFERENCE ONLY. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
AND ABBREVIATIONS.
2. SEE GI003 FOR GENERAL MOUNTING HEIGHTS, TOP OF
WALL DETAILS AND PARTITION TYPES.
3. CONTRACTOR IS RESPONSIBLE FOR REVIEWING CODE
COMPLIANCE PLANS AND NOTIFYING THE ARCHITECT OF
CONFLICTS BETWEEN WHAT IS IN THE FIELD AND ON
THE CODE DOCUMENTS.
4. DIMENSIONS ARE FACE OF CONCRETE, FACE OF
MASONRY AND CENTERLINE OF STUD, UNLESS NOTED
OTHERWISE.
5. DOOR JAMBS (HINGE SIDE) SHALL BE 6" FROM CORNER
IN STUD PARTITIONS AND 8" FROM CORNER IN MASONRY
PARTITIONS UNLESS NOTED OTHERWISE.
6. REFER TO DETAILS FOR ADDITIONAL DIMENSIONING
INFORMATION.
7. REFER TO ENLARGED PLANS FOR PARTITION TYPES AND
DIMENSIONS IN AREAS WHICH ARE DETAILED AT A
LARGER SCALE.
8. FURNITURE AND OWNER PROVIDED EQUIPMENT ARE
INDICATED BY DASHED LINE TYPE.
9. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION
OF OWNER PROVIDED EQUIPMENT INCLUDING BUT NOT
LIMITED TO DIMENSIONAL INFORMATION, AND
MECHANICAL, ELECTRICAL AND PLUMBING
REQUIREMENTS.
10. CENTER FLOOR DRAINS IN SPACE UNLESS INDICATED
OTHERWISE.
INFILLED AREA
PLAN LEGEND:
EXISTING WALL/PARTITION/COLUMN
NEW WALL/PARTITION
VACANT SPACE
ACCESS CONTROL, RE: ELEC.
KEYED NOTES:
A
B
C
D
E
1 2 3 4 5 6
F2
AE301
F2
AE301
F9
AE310
C3
AE312
C3
AE312
F3
AE312
F6
AE310
BARIATRIC
TREATMENT
ROOM
BARIATRIC
TOILET
218A
SOILED
UTILITY
EXAM ROOM
PATIENT
TOILET
220A
BARIATRIC
TOILET
221A
BARIATRIC
EXAM ROOM
EXAM ROOM
PATIENT
TOILET
213A
PATIENT
TOILET
214A
EXAM ROOM
CLEAN
UTILITY
PATIENT
TOILET
216A
TREATMENT
ROOM
3B 3B3B
3B3B3B
3B3B3B3B3B3B3B
2A 2A
2A
0 22
213A216A
214A
221A
220A
218A
OFFICE/EXAM
STAIR 1
200B
AE101D1
2T2T
2T
2T
2T
2T
2T
2T 2T
DN
F4
AE310
6 21
1 1
1 1
A1
B A1
B
5'
- 0
3'
- 8
/2
3'
- 8
/2
4'
- 1
1/ 2"
6' - 5 1/2" 3' - 8 1/2" 6' - 5 1/2"
7'
- 5
/2
7'
- 5
/2
AE100
F1 SIM
/2
6'
- 8
/2
5'
- 0
12' - 1 1/2" 16' - 0" 16' - 0" 18' - 8" 10' - 8"
1"
15' - 7 1/2"
15' - 10 1/2" 1' - 1" 4' - 0" 5' - 9" 1' - 0" 10' - 7 1/2" 10" 3' - 10" 2' - 4" 1' - 7" 3' - 11 1/2" 14' - 1"
16' - 9 1/2" 2' - 0 1/2" 6' - 11" 11' - 0" 8' - 1 1/2" 7' - 6 1/2" 3' - 7 1/2"
7'
- 1
/2
3'
- 0
/2
3'
- 7
6'
- 5
4'
- 7
2'
- 7
7'
- 2
/2
3"
7'
- 0
7'
- 3
/2
7'
- 4
6'
- 5
6'
- 1
1/ 2"
/2
6'
- 9
/2
3'
- 1
1/
2"
1'
- 0
/2
6'
- 5
1'
- 0
/2
16' - 7 1/2"
W2
W2
W2
F1a
Q3.0
S6.0
S3.1a
U4.1
S3.1a
S3.1a
F3a
F3a
S3a
F3a F3a
F3a
S3a
S3a
F3a
S3a
S6.0
Q3.0
S3a
S3a
S6.0
S3.1aU4.1
S3.1a
U4.1
S3aQ3.0
Q3.0
F3a
F3a
S3a
S6.1
U4.1
S6.1
Q3.0
F6
F6
S3a
Q3.0
F3a
F3a
Q3.0
S3a
S3a
F3aQ3.0
F3a
Q3.0
Q3.0
S3a
Q3.0
F6
U4.1
U4.1
S3.1a
S3.1a
F3a
F3a
S3a
S3a
TRUE NORTH
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1.877.700.7678…